Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.1 L+₹6,212.51 (3.12%)Admitted-Finance HOUSE NO F 452 3 LINE NO 09 RAJENDER NAGAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | L2 | Admitted-Finance | |
| 3 | L3₹2.1 L+₹6,586.07 (3.31%)Admitted-Finance LOCATION UTTARAKHAND UT | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rawat Electrical Works L1 | Shri Ganesh Enterprises L2 | AJAY KUMAR CHAUHAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | MS Nut & Bolt 180x16 mm | 2 | KG | 119 ₹238 Lowest | 121 ₹242 | 122 ₹244 |
| 2.00 | Top Chennel Clamp For SP-23 With N&B | 8 | NOS | 275 ₹2,200 Lowest | 278 ₹2,224 | 280 ₹2,240 |
| 3.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 5 | NOS | 245 ₹1,225 Lowest | 255 ₹1,275 | 255 ₹1,275 |
| 4.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 12 | NOS | 267 ₹3,204 Lowest | 270 ₹3,240 | 269 ₹3,228 |
| 5.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 8 | NOS | 245 ₹1,960 Lowest | 255 ₹2,040 | 255 ₹2,040 |
| 6.00 | HT Stay Insulator | 20 | NOS | 189 ₹3,780 Lowest | 195 ₹3,900 | 190 ₹3,800 |
| 7.00 | SHACKLE INSULATOR 100X115 mm WITH N&B | 12 | NOS | 99 ₹1,188 Lowest | 105 ₹1,260 | 102 ₹1,224 |
| 8.00 | STAY INSULATOR 100X115 | 5 | NOS | 45 ₹225 Lowest | 52 ₹260 | 50 ₹250 |
| 9.00 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 6 | NOS | 300 ₹1,800 Lowest | 321 ₹1,926 | 323 ₹1,938 |
| 10.00 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 6 | NOS | 273 ₹1,638 Lowest | 279 ₹1,674 | 278 ₹1,668 |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
24 Mar 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
EDD Bhikiyasain
as per Nit
2026_UPCL9_92466_1
31/EDD(B)/2025-26
Open Tender
Electrical Works
Item Wise
90 days
EDSD BHIKIYASAIN
Please refer Tender documents.
2 documents required · 2 mandatory
₹295
E E EDD Bhikiyasain
₹6,500
19 May 2026
26 Feb 2026
25 Mar 2026
26 Feb 2026
24 Mar 2026
26 Feb 2026
MS Nut & Bolt 180x16 mm
Top Chennel Clamp For SP-23 With N&B
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-23 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
HT Stay Insulator
SHACKLE INSULATOR 100X115 mm WITH N&B
STAY INSULATOR 100X115
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
TOP CHANNEL HOLDING CLAMP FOR SP-23 POLE
LT Clamp SP-21 With Nut & Bolt
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF FUSE SET
FIXING OF LIGHTNING ARRESTOR
LAYING OF RABBIT CONDUCTOR IN HT LINE
T-OFF CONNECTION COMPLETE 11 KV LINE
CARTAGE SP-21/23 POLE, 51-70 KM
CARTAGE OF PETTY MATERIAL,51-70 KM
CARTAGE OF 16/25 KVA DTR, 51-70 KM
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(1-3 KM)
LAYING OF LT AB CABLE 3X35+1X25 SQMM
LAYING OF 1X25 XLPE CABLE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
TD31.pdf
Tender Documents • 0.76 MB
BOQ_109445.xls
BOQ • 0.27 MB
31BOQ.rar
PDF • 0.08 MB
27TO29EX.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .