Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance DHARMANAGAR TRIPURA WEST | Admitted-Finance |
Tender Value
₹23.0 L
EMD Value
₹45,950
Closing Date
17 Feb 2024, 4:00 pmClosed
DGM, ED-Dharmanagar
O/O DGM, ED-Dharmanagar
Shifting of HT/LT line to keep ideal clearance from electricity lines for passing of ONGC rig machine from Durgapur to North Hurua under ESD-II, Dharmanagar (DRAA).
2024_POWER_46800_1
NIT/DGM/ED-DMR/23-24/10
Open Tender
Electrical Works
Turn-key
90 days
O/O DGM, ED-Dharmanagar
As per NIT
3 documents required · 3 mandatory
₹4,000
₹45,950
O/O DGM, ED-Dharmanagar
27 Feb 2024
10 Feb 2024
19 Feb 2024
11 Feb 2024
17 Feb 2024
12 Feb 2024
12 Feb 2024 - 13 Feb 2024
13 Feb 2024
Amount
SCHEDULE-A Supply
11 mtr. Long steeltubular pole
9 mtr Long PCC pole
Stay set Complete
Stay wire 7/2.5mm
Stay insulator(HT)
ACSR (6/1/2.59mm)
8 SWG GI wire
M.S. CHANNEL (75x40x40x6) mm Channel
M.S. ANGLE (65x65x6) mm Angle
11KV Polymer composite 70 KN Disc Insulator
11KV Disc fittings Up to 7/3.8mm, 2-U Bolt type
11KV Polymeric Pin 320 mm CD composite pin Insulator
3X35+1X16+1X25 sqmm LT Aerial bunched cable
Dead end clamp assembly with straps and buckle 35 sqmm with eyehook and pole clamp
Suspension clamp assembly with straps and buckle (25 to 70mm)
Single phase distribution box
Three phase distribution box
SCHEDULE-B Dismantleing
8 mtr. PCC pole
9 mtr. steel pole
Stay set Complete
SP Top
SP Bottom
SP Guard
DP Top
DP Bottom
DP Guard
11 KV pin insulator
11 KV Disc insulator with fittings
GI Guard wire
Cradle Guard
SCHEDULE-C Erection
11 mtr. Long steeltubular pole
9 mtr Long PCC pole
Stay set Complete
SP Top
SP Bottom
SP Guard
DP Top
DP Bottom
DP Guard
11 KV pin insulator
11 KV Disc insulator with fittings
ACSR 6/1/2.59 mm
GI Guard wire
Cradle Guard
Fabrication of MS Channel/angles
Positioning of 3X35+1X16+1X25 sqmm LT Aerial bunched cable
Fitting Fixing of 1/3 phase distribution box
Errection of suspension clamp i/c straps & buckles as per TS
Errection of Dead end clamp i/c straps & buckles as per TS
Carrying of the all balanced Dismantled materials(i.e line materials, poles etc.) from work site to Sub-divisional store yard.
Grouting of 25 nos. 11 mtr steel tubular pole of ratio 1:2:4(1cement: 2 river send: 4 jhama brick aggregate) of 20mm normal size i/c. Supply of cement,send & jhama brick aggregate complect excavation,refilling & ramming of cach alongwith centering & shuttaring ang clamping.(per pole= 0.392cum)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .