Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹54.5 L
EMD Value
₹55,000
Closing Date
15 Sept 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Renovation of Ponds and Ooranies under State Finance Commission Grant in Musiri Block in Tiruchirappalli District for the year 2019-20 Phase II Package No.27
2020_RDTN_174778_27
A10/2340/2019 Dated 30.07.2020
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹55,000
DRDA Tiruchirappalli
23 Sept 2020
7 Aug 2020
15 Sept 2020
7 Aug 2020
15 Sept 2020
7 Aug 2020
10 Aug 2020
Amount
RENOVATION OF PERUMAL KUTTAI IN KOTTATHUR PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF POND @ SAVITHIRI KUTTAI IN PULIVALAM PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF ILUPPAIYUR KUTTAI @ ILUPPAIYUR IN SATHANUR PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF POND @PAPPAN KULAM IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF POND @VANNAN KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF PORE KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF KALRANPATTI KUTTAIN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF SEETHA KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF KATTALA KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF PENNAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF THATTAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF PARAIYAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF OOTHUKULI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF ARIYAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF SETTI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF KOTTAN KULAM IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF OORANI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
RENOVATION OF CHINNAN KUTTAI IN VENGAIMANDALAM PANCHAYAT. Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc.,
Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete
Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete
Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm.
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RV CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .