Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹23.6 L
EMD Value
₹23,556
Closing Date
19 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Notified Area Authority Panoli
Constructing Protection wall & Providing, Supplying, fixing in position 1600 mm dia RCC NP3 Pipe for Storm Water Drainage at NA Panoli GIDC-Chainage-43040 Nr. Bajaj Healthcare Ltd.
364657
Tender Notice No. 03 of 2026-27
Open
Civil Works
Works
Bharuch
2 documents required · 2 mandatory
₹1,770
Chief Officer, Notified Area GIDC, Panoli
₹23,556
7 Nov 2026
7 Nov 2026
7 Nov 2026
19 Nov 2026
7 Nov 2026
120 days
Name of work: Constructing Protection wall & Providing, Supplying,
fixing in position 1600 mm dia RCC NP3 Pipe for Storm Water Drainage
at NA Panoli GIDC-(Chainage-43040 Nr. Bajaj Healthcare Ltd.)
VOLUME -I: TECHNICAL AND PRICE BID
ONLINE TENDER PAPERS
1 Estimated cost : Rs.23,55,611.00
2 Tender fee Basic + 18 % GST : Rs.1,770.00
4 Last date on (or before) which the tender : From 02-11-2026 to
along-with DD / FDR for Tender fees& EMD 19-11-2026
(by scanning) and other required documents up to 17.00 hours
must upload on the web site of
www.tender.nprocure.com &
www.statetenders.gujarat.gov.in
5 Date on (or before) which DD/FDR in original : From 20-11-2026 to 21-11-
for Tender fee& EMD and other required
documents must reach in the office of the Up to 17.00 hours during
Chief Officer Notified Area Authority, Plot working days only.
No. 409/C, Nr. Fire Station Building GIDC
6 Pre-Bid Meeting : NA
7 Eligible class of Registered : “E-1” Class & Above
OFFICE OF THE CHIEF OFFICER, NOTIFIED AREA, GIDC, PANOLI
Plot No. 409/C, Nr. Fire Station Building GIDC Panoli. Pin -394116
E-Mail: - [email protected]
Sign of Contractor Chief Officer
NA, GIDC Panoli
NOTIFIED AREA OFFICE GIDC PANOLI
(GUJARAT INDUSTRIAL DEVELOPMENT CORPORATION)
TENDER Notice No: 03/2026-27
Work at Sr. No.
BID Documents for
Name of work: Constructing Protection wall & Providing, Supplying,
fixing in position 1600 mm dia RCC NP3 Pipe for Storm Water Drainage
at NA Panoli GIDC-(Chainage-43040 Nr. Bajaj Healthcare Ltd.)
SR.NO. PARTICULAR PAGE NO.
02 MEMORANDUM OF WORK IN BRIEF
03 TENDER NOTICE
04 PRE-QUALIFICATION CRITERIA
05 INFORMATION & INSTRUCTION TO BIDDER
06 GENERAL CONDITION
07 DETAILED SPECIFICATION
09 B1 AGREEMENT (SEPERATELY)
Sign of Contractor Chief Officer
NA, GIDC Panoli
NOTIFIED AREA OFFICE GIDC PANOLI
(GUJARAT INDUSTRIAL DEVELOPMENT CORPORATION)
TENDER Notice No: 03/2026-27
Work at Sr. No.
MEMORANDUM OF WORK IN BRIEF
1) Name of work Constructing Protection wall & Providing, Supplying, fixing
in position 1600 mm dia RCC NP3 Pipe for Storm Water
Drainage at NA Panoli GIDC-(Chainage-43040 Nr. Bajaj
Healthcare Ltd.)
2) Estimated cost Rs.
3) Joint Venture (J.V) Joint Venture (J.V) is not allowed.
4) Earnest Money Deposit (EMD) Rs. 23,556.00 in the form of DD/FDR for more than 180 days
of Nationalized Bank/ Scheduled bank or ICICI / HDFC/
IDBI & Axis bank Only. In favor of Chief Officer Notified
Area GIDC Panoli.
5) Validity period of tender offer. 120 days from the stipulated date of receiving of the tender
but no modification shall be allowed after handing over tender
to postal authorities.
6) Security Deposit (5.00%) Rs.1,17,780.00
(i) Performance Bond in form of N.A.
BG / FDR of scheduled or
Nationalize Bank or any
(iii) To be deducted from Rs. 58,890.00 (2.5%) --
Current R.A. bills.
TOTAL (i + ii + iii) Rs.1,17,780.00
7) Liquidated Damages As per clause of B-1 Form attached herewith
8) Defect liability period – Refer As per clause of B-1 Form attached herewith
modified clause-17A for
building work as per R&B
Circular No. PRCH/102008 /
9) Free Maintenance guarantee As per clause of B-1 Form attached herewith
period under clause no.17B of
10) Workers Welfare Cess Under 1% of the value of work done shall be deducted from the
the Building & Other all bills payable to the contractor.
Construction Workers Cess
Act 1996 (Labour Cess)
12) Time limit for completion of 01(One) Month
work from the date of written
order to commence.
14) Submission date & time of From 02/11/2026 to 19/11/2026 up to 17.00 hours
tender documents
Sign of Contractor Chief Officer
NA, GIDC Panoli
i) Date on (or before) which the
tender with DD / FDR for
Tender fee & EMD (by From 02/11/2026 to 19/11/2026 up to 17.00 hours
scanning) except required
documents must upload on the
web site of www.tender.nprocure.com
www.statetenders.gujarat.gov.in
b) Date on (or before) which From 20/11/2026 to 21/11/2026 during working days up to
DD/FDR in original for Tender 17.00 hours Only R.P.A.D or Speed Post or Hand Delivery
fee & EMD and required Physical submission of documents prior to this date will not
documents must reach in the be considered and bids of the agency will be considered as
office of the Office of the nonresponsive.
Chief Officer, Notified Area,
Plot No. 409/C, GIDC, Panoli.
(R.P.A.D or Speed Post or
ii) Mode of sending the tender
The tender with DD / FDR for By Online through e – tendering process
Tender fee & EMD (by
scanning) except required
DD/FDR in original for Tender Personally i.e., Hand Delivery to In Office of the Chief
fee & EMD and required Officer, Notified Area, Plot No. 409/C, GIDC, Panoli.
15) Opening of Technical bid On dtd. 21/11/2026 at 18.00 Hrs.
16) Tender to be opened by In the Office of the Chief Officer, Notified Area, Plot No.
409/C, GIDC, Panoli.
17) Description essential to be Name of work: Constructing Protection wall & Providing,
made on sealed cover for Supplying, fixing in position 1600 mm dia RCC NP3 Pipe
documents to be submitted by for Storm Water Drainage at NA Panoli GIDC-
personally i.e. Hand Delivery (Chainage-43040 Nr. Bajaj Healthcare Ltd.)
Date of receiving the documents
From 20/11/2026 to 21/11/2026 during working days up to
18) Important Note: Rates quoted by the agency is Including of All taxes
& excluding of GST will be paid separately.
Prospective bidders are requested to join the site visit.
Registration required E-1 Class and above
GST registration certificate required mandatory
Scanned copy of tender fee and EMD
Required Class of registration, Latest Income Tax
return filed, RPFC registration certificate with latest
challan, Service Tax Registration & Pan Card.
Fresh Valid Bank Solvency- (20% value of the
estimated cost put to tender)
Submit the required documents online duly named and
page numbered in proper manner for simplicity.
19) Stamp duty The stamp paper of Rs.300 for agreement If SD is paid
in form of FDR Form, then you have to pay additional
stamp duty worth 4.9% of 2.5% S.D. amount.
20) GST & Others all taxes. As applicable (As per clause No.48 of B1Agreement)
Sign of Contractor Chief Officer
NA, GIDC Panoli
21) Site Visit Contact Person:
Notified Area, Panoli.
Shree A G Chaudhari
Notified Area, Panoli.
Sign of Contractor Chief Officer
NA, GIDC Panoli
અ.નં ૦૧-૦૪ ૦૦ કલાક ુ ી વેબ સાઈટ https://tender.nprocure.com ઉપરજ
- આ કામ ની િનિવદા ઓફ સનાં નોટ સ બોડ ઉપર તેમજ www.tender.nprocure.com/
www.statetenders.gujarat.gov.in માં જોવા મળશે.વ ુ માહ તીની જ ર યાત હોય તો ચીફ ઓફ સર
Sign of Contractor Chief Officer
NA, GIDC Panoli
PANOLI NOTIFIED AREA
OFFICE OF THE CHIEF OFFICER,
E-TENDER NOTICE No. 03 of 2026-27
Notified Area Office, Plot No. 409/C, Fire Station Building, Near Police Chowki GIDC,
Panoli are invited tenders from Gov. registered contractors.
Online tender from https://tender.nprocure.com uploaded to the
Sr. No. Online same site on or before last date of downloading and uploading
Online tender dated.02/11/2026 to 19/11/2026 up to
Offline tender dated.02/11/2026 to 19/11/2026 up to
Sr. No.-05 Offline Collect from office of the Chief officer Notified Area GIDC
Panoli Plot No.409/C GIDC Panoli
- Online tender documents submit to the Chief officer Notified Area GIDC Panoli, Plot
No.409/C GIDC Panoli on or before 21/11/2026 till 17:00 Hrs. documents & other
document EMD, Tender Fee, Registration copy will be sending this office from
20/11/2026 to 21/11/2026 up to 17:00 hrs. Tender opening on Dt. 21/11/2026 at 18:00
Hrs. And Offline tender documents submit to the Chief officer Notified Area GIDC
Panoli, Plot No.409/C GIDC Panoli on or before 21/11/2026 till 17:00 Hrs. documents
& other document EMD, Tender Fee, Registration copy will be sending this office.
Tender opening on Dt. 21/11/2026 at 18:00 Hrs.
- Tender notice will be seen on this office notice board and web site
www.tender.nprocure.com and www.statetenders.gujarat.gov.in.
Notified Area Authority
Sign of Contractor Chief Officer
NA, GIDC Panoli
E-TENDER NOTICE No. 03 of 2026-27
NOTIFIED AREA AUTHORITY, GIDC, PANOLI
- Online & offline tender is invited for the following work from the eligible contractors. This tender notice can be viewed on Website:
www.tender.nprocure.com www.statetenders.gujarat.gov.in the work at Sr. No. 01-04 are online and tender can be downloaded from website,
www.tender.nprocure.com www.statetenders.gujarat.gov.in uploaded to the same site on or before last date of down loading and uploading
02/11/2026 to 19/11/2026. Online tender documents & other document EMD, Tender Fee, Registration copy will be sending this office from
20/11/2026 to 21/11/2026 up to 17:00 hrs. Tender opening on Dt. 21/11/2026 at 18:00 Hrs. And work of offline tender documents submit to
the Chief officer Notified Area GIDC Panoli, Plot No.409/C GIDC Panoli on or before 21/11/2026 till 17:00 Hrs. documents & other document
EMD, Tender Fee, Registration copy will be sending this office. Tender opening on Dt. 21/11/2026 at 18:00 Hrs. & When Opening of Price
BID Notified Area Authority, Panoli will intimate date to all Pre-Qualified Bidders. No exemption certificate regarding earnest money shall be
accepted. The amount of EMD to be paid should be in the form of demand draft or FDR for more than 180 days of Nationalized / Scheduled
Banks and ICICI, IDBI, HDFC & Axis Banks in favour of Chief Officer, NA, GIDC, Panoli. Any conditional tender shall not be accepted.
However, the Same shall be deposited to the Govt. Treasury by the tenderer only at his sole responsibility.
1. Estimated cost Rs.
Sr. No. Name of work Class of Registration
3.Tender Fee Rs. (incl. GST)
1 Constructing Protection wall & Providing, Supplying, fixing in Rs.23,77,177.00 “E-1 class and above”
position 1600 mm Dia RCC NP3 Pipe for Storm Water Drainage Rs.23,771.00
at NA Panoli GIDC-(Chainage-46500 Nr. PI Industries) Rs.1,770.00
2 Constructing Protection wall & Providing, Supplying, fixing in Rs.23,55,611.00 “E-1 class and above”
position 1600 mm Dia RCC NP3 Pipe for Storm Water Drainage Rs.23,556.00
at NA Panoli GIDC-(Chainage-43040 Nr. Bajaj Healthcare Ltd.) Rs.1,770.00
3 Annual Rate Contract for Operation, Maintenance & Repairing of Rs.25,87,665.00 “E-1 class and above” & “Valid
Street Light @ Notified Area Panoli Estate. (Re-Invite) Second Rs.25,876.00 Electrical License” & Similar type
Time Rs.1,770.00 of work experience.
4 Annual Rate Contract of Fire Materials, user service Notified Rs.19,81,067.00 Authorized Dealer/ Manufacturer/
Area Authority work at Panoli Estate. Rs.19,810.00 Having similar types of work
Rs.1062.00 Experience contractor.
OFF-LINE TENDER
5 Request for Proposal (RFP) for Development, Implementation Rs. ------ Experience in similar types of
and Maintenance of an Online Complaint Registration and Rs.5,000.00 work.
Management Application for NA, GIDC, Panoli. Rs.708.00
1. Any conditional tender shall not be accepted.
2. Right to reject any or all the tenders / work without assigning any reasons thereof are reserved by Chief Officer, Notified Area, GIDC, Panoli
3. Rates quoted by the agency is excluding of GST will be paid separately.
(B) DETAILS TO BE FURNISHED ALONG WITH APPLICATION:
Interested Bidders can view these tender documents on line, but bidders who are interested in bidding these tenders can download
tender documents from web site as mentioned above and bidder who wish to submit their offer shall pay non-refundable tender fee in
the form of Account payee Demand Draft payable at Panoli drawn on any Nationalized / Scheduled bank in favour of Chief Officer,
Notified Area, GIDC, Panoli& EMD in the form of Account Payee Demand Draft payable at Panoli drawn on any Scheduled /
Nationalized Bank in favour of Chief Officer, Notified Area, GIDC, Panoli.
The intending bidders have to submit the following documents also, along with the tender fee & EMD (in physical form) by personally
i.e., by speed post/currier/hand delivery.
1. Registration certificate of Approved contractor in respective category for the work.
2. Fresh Bank Solvency Certificate (2025-26) (20% value of Estimated cost put to tender)
3. Latest Income Tax Return filed & Pan card details.
4. GST Registration & RPFC Registration certificate.
1. Intending bidders or their representative who wish to remain present at the time of tender opening can do so.
2. Tenderer shall submit their offer in electronic format online only, after digitally signing the same.
3. Offers which are not digitally signed will not be accepted.
4. No Offer in physical form except specified documents will be accepted.
5. Conditional tender shall not be accepted.
6. Scanned copied of DD for tender fee & EMD shall submit in electronic format through online (by Scanning) while uploading bid.
7. Rules of GIDC/NAO as well as committee of Board of Management Notified Area, Panoli are binding to the tenderer.
8. Tenders without tender fee, Earnest Money Deposit (EMD) and other required documents specified above which do not fulfill all or
any of the condition or submitted incomplete in any respect will be rejected.
9. Conditional tender shall not be accepted.
10. The internet site address for e-tendering is http://www.nprocure.com and that corporate web site is www.nprocure.com.
11. Chief Officer, Notified Area, Panoli reserves the rights to reject any or all tenders without assigning any reason thereof.
NA, GIDC Panoli
Sign of Contractor Chief Officer
NA, GIDC Panoli
QUALIFICATION CRITERIA FOR PRE - QUALIFICATION
The pre-qualification application received under this bid shall be assessed and evaluated based on the
qualification criteria and evaluation procedure prescribed here under:
(1) Following constitution of pre-qualification evaluation committees is finalized.
Sr. Constitution of Committee
1 The pre‐qualification application received under this bid shall be assessed and evaluated
based on the qualification criteria and evaluation procedure prescribed here under. An
evaluation of Pre‐Qualification Application will be placed constitution of pre-qualification
evaluation committees is Board of Management of Notified Area GIDC Panoli.
(2) Prequalification criteria for the Civil / Mechanical / Electrical works.
(2.1) Eligibility: E-1 Class & Above
(2.1.1) Bidder’s registration: -
(2.1.1.1) Only those bidders shall bid whose names are borne on the approval list of registered
contractors in the required class & category with Gujarat state R&BD / W.R.D. /
(2.1.1.2) If the Contractor’s registration in the required class & category with Gujarat state
R&BD / W.R.D. / GIDC is expired on or before the last date of online bidding period
of the tender, the bidder must submit through online in electronic form the application
for renewal of the same with the concerned department along with receipt of fees paid
for it. In such cases, the bidder at his own responsibility must produce valid renewed
registration certificate in the required class & category with Gujarat state R&BD /
W.R.D. / GIDC before the date of opening of Technical Bid. Failing to which the
bidder shall be disqualified for opening of his price bid. Bidder will solely be
responsible for obtaining the required registration.
(2.1.1.3) In context to above Para (2.1.1.2), it is clarified that the bidder who is having
registration in class & category below than the minimum required class & category
and the bidder has applied for up-gradation in required class and category with
Gujarat state R&BD / W.R.D. / GIDC shall not be considered valid. In such cases the
bidder shall not be considered eligible for bidding.
(2.1.1.4) The bidder, who is registered in appropriate category of C.P.W.D., M.E.S., Railways
and Indian state government, can also bid provided the bidder produce such
Sign of Contractor Chief Officer
NA, GIDC Panoli
registration certificate at the time of bidding and obtain registration in required class
& category from the Gujarat state R&BD / W.R.D. / GIDC before issuing work order.
Bidder will solely be responsible for obtaining the required registration.
Note: - Joint Venture (JV) is not allowed.
(2.2) Litigation history: -
(2.1.1) The applicant should provide accurate information on litigation and/or arbitration
resulting from contracts completed or under execution by him over the last five
financial years. A consistent history of arbitration awards/judgements against the
applicant or any partner of a joint venture may result in disqualification for proposed
work. If the details of litigation history are hidden by the applicant and later on it
comes to knowledge of the employer the bidder shall be disqualified for the proposed
work and other appropriate action shall be taken against the bidder.
(2.1.2) Information of litigation history in following statement to be submitted, if any
other wise Nil / Not Applicable statement to be submitted.
LITIGATION HISTORY
Name of applicant:
Sr Name Work Financi Brief Departme Whether Details of Whether
. of completed al year Detail of nt in awards / Result of Judgem
N Contra or under the opposition judgement arbitration / ent in
o. ct execution arbitration s are Judgement favour
/ litigation pending or in
matter or made? against
(Signature of bidder)
(2.3) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in
(2.3)1.1. The bidders shall be disqualified for opening of his price bid if he is under blacklist
and / or under ban and /or his registration is under abeyance by any Central / State
Government Department, Board, Corporation, Municipal Corporation, Municipality,
Government Local Bodies, University etc.
Sign of Contractor Chief Officer
NA, GIDC Panoli
(2.3)1.2. The bidder shall have to submit prescribed notarized affidavit on appropriate stamp
paper as under, failing to which the bidder shall be disqualified for opening of his
Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance.
(To be submitted on stamp paper of appropriate value & duly notarized.)
Name of work: -
______________ in the capacity of _________________Do hereby solemnly affirm and declare
We are not under blacklist and / or under ban and /or our registration has not been
kept under abeyance by any Central / State Government Department, Board, Corporation,
Municipal Corporation, Municipality, Government Local Bodies, University etc. as on date of
participating for this bid.
Date: - Authorized signatory
(2.4) Machinery / Equipment: -
Bidder shall have to submit a prescribed notarized undertaking on appropriate
stamp paper for deploying machinery/equipment for the work under tender as per below.
Undertaking for deploying Machineries/Equipment’s/Tools & Plants
(To be submitted on stamp paper of appropriate value & duly notarized.)
(Authority holding the digital key)
Name of Work: -
List of minimum Machineries/ Equipment’s/ Tools & Plants to be deployed on contract work.
Sr. Type of Equipment Minimum No. of equipment
1 JCB, Hydra, Crane 03 Nos.
2 Tipper / Dumper (capacity 5.0 m3) 02 Nos.
3 Water Pump 02 Nos.
4 Others all necessary tools. 01 Nos.
I/We hereby undertake that if I/we awarded the above said work then i/we shall deploy
Sign of Contractor Chief Officer
NA, GIDC Panoli
all Machineries/Equipment’s/Tools & Plants etc. as shown in the Appendix-B in fully working condition
and utilize the same while execution of the work.
We also undertake that i/we shall deploy other Machineries/Equipment’s/Tools & Plants etc. over &
above shown in Appendix-B in working condition and utilize the same as per instruction of Engineer-
Failing to above we shall not object any action taken to us within the tender provision. In case of any
dispute, Superintendent Engineer’s decision shall be final.
Date: - Authorized signatory
(2.5) bidding in E-tendering: -
Submission of documents must be through e-tendering i.e. electronic form, unless specified in
All of the online submitted documents must be clearly readable, failing to which the same shall
be considered as void.
Bids of those bidders who have submitted all information, statistical details as required in the bid
documents through E-Tendering will only be considered. If the employer desires any
clarification, for verification/clarification, ambiguity of difference found in the
documents/statistical details submitted online (by e-tendering) by the bidder the same shall be
furnished within stipulated time otherwise further processing will be carried out in absence of
above and the bidders shall be liable for any consequence.
No bidder can participate in more than one bid for proposed work. GIDC, Gandhinagar.
(2.6) Submission of documents: -
(2.6.1) Following documents/papers shall form part of the bid & must be submitted through
online in electronic form unless specified separately, failing to which the bidder shall be
dis-qualified for opening of his price bid.
(2.6.1.1) D.D. of require tender fee. (To be submitted in electronic form at the time of online
submission of the bid & the same to be submitted in original during prescribed time period
for submission of documents in physical form.)
(2.6.1.2) DD/FDR & BG of required EMD. (To be submitted in electronic form at the time of
online submission of the bid & the same to be submitted in original during prescribed
time period for submission of documents in physical form.)
(2.6.1.3) Copy of valid bank solvency certificate of minimum 20 % amount of the estimated cost
put to the tender of the work. (Bank Solvency certificate issued during current calendar
year is considered as valid up to end of the December of the current calendar year. 31st
march of the next calendar year. In case, where solvency certificate is not obtained in
Sign of Contractor Chief Officer
NA, GIDC Panoli
time, the certificate of previous year will be considered valid up to the end of March of
current calendar year. In some certificates date of validity is stated. In such cases the same
stated date is considered for validation instead of end of December of the current calendar
(2.6.1.4) Copy of relevant required Registration Certificate / Certificates. (In case of renewal, copy
of application & receipt of fee paid.)
(2.6.1.5) Litigation history as per Para (2.2).
(2.6.1.6) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance as
per Para (2.3).
(2.6.1.7) The undertaking for deploying machinery/equipment for the work under tender as per
(2.6.2) Following documents/papers shall also form part of the bid, but these documents are not
mandatory to be submitted through online in electronic form. However, the same shall be
submitted in physical form, if not submitted through online in electronic form, within
time period given by authority holding the digital key, failing to which the bidder shall
be dis-qualified for opening of his price bid.
(2.6.2.1) Copy of registration certificate of firm / documents of public limited / private limited /
partnership firm / proprietor firm, whichever is applicable. For example, Partnership
Deed, Certificate of incorporation, Memorandum of association, Article of Association
(2.6.2.2) Copy of Power of Attorney, if any.
(2.6.2.3) Copy of PAN Card.
(2.6.2.4) Copy of latest income tax return certificate. (Note: - latest income tax return certificate
means the income tax return certificate of the last completed financial year for which pre-
determined/extended time period by the Income Tax Department for filing income tax
return is over on or before last date of online submission.
(2.6.2.5) Copy of Goods & Services (G.S.T.) registration certificate.
(2.6.2.6) Copy of RPFC registration certificate.
(2.6.2.7) Copy of RPFC Challan of any of the completed last three months from the month of last
date of online submission of the tender.
Following Undertaking / Declaration to be incorporated on (n) Procure website in such a
manner that without attending this undertaking / declaration the tender cannot be
UNDERTAKING / DECLARATRION
Sign of Contractor Chief Officer
NA, GIDC Panoli
“I hereby declare that I have after thoroughly understand the pre-qualification criteria /
conditions and the details filed & documents submitted are true and correct to the best of
my knowledge and belief. I shall not have any objection against any action taken by GIDC
if any of the information submitted is found to be incorrect / false.”
(2.6.3) any information, data, statistics etc. which are not related to bid document will not be
considered in evaluation even through furnished by the applicant.
(2.6.4) In accordance with stipulated of Para (2.5), employer reserves the right to call any
information/documents which is mandatory, essential and critical for the purpose of
evaluation. Any information provided by the applicant after last date of electronic
submission will not be considered in evaluation, unless except the employer has specially
asked for any information/document, which is mandatory, essential and critical for
evaluation of PQ document. If required information is not furnished within stipulated
time, proposal will be liable for rejection.
(2.6.5) If any of the information provided by the bidder is found false during scrutiny or at the
later stage, his EMD shall be forfeited and he shall be disqualified for the proposed work.
In case when bidder has furnished exemption certificate in lieu of EMD, an amount equal
to EMD shall be appropriated from his FDR pledged to avail of exemption certificate. If
any of the information provided by the bidder is found false after award of work, the
performance security of the bidder shall be forfeited and the contract shall be terminated.
(2.6.6) Authority holding the digital key ((n) code solution), respective Executive Engineer of
Civil branch/chief officer of NAO, respective Executive Engineer of M&E branch and
Account Officer / Divisional Accountant of the respective Division office shall be jointly
liable to download, evaluate, verify all online documents submitted by the bidder with
respect to pre-qualification criteria.
(2.6.7) In case of committee of Chief Engineer, concerned field Superintending Engineer and
Concerned field Executive Engineers (Civil) & (M&E), after carried out all above
procedures and verifying all print outs of the online documents submitted by the bidders,
shall submit the same documents (Indicating page no. on each & every documents
submitted by the bidder through online in electronic form.) along with evaluation sheet
(Details against each P.Q. Criteria along with page No., remarks etc. Note :- To be
prepared by respective Executive Engineer of Civil branch, respective Executive
Engineer of M&E branch and Account Officer / Divisional Accountant of the respective
Division office jointly), duly signed by all the concerned, to Chairman (i.e. Chief
Engineer) of the Pre-Qualification committee and also shall brief the other members of
the Pre-Qualification committee on documents submitted by the bidders through online
in electronic form and evaluation done by his office, at the time of meeting of the Pre-
Qualification committee.
Sign of Contractor Chief Officer
NA, GIDC Panoli
(2.6.8) In case of committee of Superintending Engineer, concerned field Executive Engineer
(Civil) & (M&E) and Account Officer/Divisional Account jointly, after carried out all
above procedures and verifying all print outs of the online documents submitted by the
bidders, shall submit the same documents (Indicating page no. on each & every
documents submitted by the bidder through online in electronic form.) along with
evaluation sheet (Details against each P.Q. Criteria along with page No., remarks etc.),
duly signed by all the concerned, to Chairman, (i.e. Superintending Engineer) of the Pre-
Qualification committee and also shall jointly brief the Chairman of the Pre-Qualification
committee on documents submitted by the bidders through online in electronic form and
jointly evaluation done by them, at the time of meeting of the Pre-Qualification committee
accordingly, concerned pre-qualification committee shall decide to qualify / dis-qualify
the bidder & circulate / issue minutes of the meeting to concerned for further action.
Sign of Contractor Chief Officer
NA, GIDC Panoli
Special Condition: -
The work involves canal crossings at two different locations, which shall be treated as two
separate works. The Financial Bid (Price Bid) of the agency whose quoted rate is found to be the
lowest (L-1) for one location shall not be opened or considered for the other location. The
Financial Bid for the other location shall be opened and evaluated only among the remaining
eligible bidders.
Special Condition: -
Following documents/papers shall form part of the bid & must be
submitted through online in electronic form unless specified separately,
failing to which the bidder shall be dis-qualified for opening of his price
• “It will be mandatory to get site visit certificate from “Chief Officer
Notified Area GIDC Panoli” in said work.
Sign of Contractor Chief Officer
NA, GIDC Panoli
SELF EVALUATION FORM
Component as per tender Remarks
DETAILS FURNISHED BY BIDDER
Tender Fees Rs.1,770.00/-
1 D.D. No. and Date
including GST by DD
D.D. / F.D.R. No. and
2 EMD B.G. Name of Bank
(Schedule or B.G. No. and Date
Nationalized Valid up to Date.
Bank Only) Amount in Rs.
20% amount Name of Bank
Bank of Estimated
Cost Amount in Rs.
Certificate i.e. Rs.4.71 Date of Issue
Lacs Valid up to Date.
Name of Department
(A) “E-1 class Valid up to Date.
Registration Authority
certificate Name of Department
Valid up to Date.
5 Litigation History (Refer Para 2.5)
Affidavit regarding Termination
Details shall be given on Rs. 300/- stamp
6 / Blacklisting / Ban / (Refer Para 2.6)
paper duly notarized
Registration kept in Abeyance
Machinery/Equipment: Proof of
deployment of required
7 minimum machinery / (Refer Para 2.7) Details shall be given on Rs. 300/- stamp
equipment’s mentioned in paper duly notarized
8 Registration certificate / To be furnished
Documents of /public Limited / whichever is
Private Limited/ Partnership applicable
deed / Proprietor Firm.
9 Latest Income (A) Year of Assessment Year
tax return filed Income tax Name
and PAN Card Return filed
Details (B) PAN Card PAN Card No.
10 GST No. GST No.
Sign of Contractor Chief Officer
NA, GIDC Panoli
(A) RPFC Registration Certificate No.
Registration (B) RPFC Challen of any of the
11 completed last three months from the
RPFC Challen month of last date of submission of the
12 Truth fullness certificate
13 As per attached format with duly sign & Stamp by NAO PANOLI Office
14 Qualified or
Sign of Contractor Chief Officer
NA, GIDC Panoli
INFORMATION AND INSTRUCTION FOR BIDDERS
Bids i.e., Price Bid and Technical Bid for the above work is invited from Contractors on e-
tendering process. The contractors, who wish to bid for this contract, should also apply for
prequalification in the manner set out in this document.
The price bid will be opened only of those tenderers pre-qualified by the Notified area as having
necessary qualification, suitability to perform the contract satisfactorily and also opened Technical
Bid with Prequalification Application will be considered. Technical Bid with Prequalification
Application of dis-qualified bidders will not be considered.
LOCATION OF WORK AND SITE INFORMATION:
The work site is located in Notified area, Panoli of GIDC Panoli.
1. BIDDER'S RESPONSIBILITY
The intending Bidders shall be deemed to have visited the site and familiarized themselves
thoroughly with the site conditions and all other aspects affecting the work under this Contract
before submitting the tender. No claim / extension of time whatsoever shall be entertained on
account of prevailing site conditions.
Interested Bidders may obtain further information at the following address:
1) Chief Officer, Notified Area, Plot No. 409/C, GIDC, Panoli-394116.
2. EARNEST MONEY DEPOSIT (EMD)
EMD is payable in the manner set out in the Form B1.
Demand Draft for E.M.D. shall be submitted in electronic format only through online (by
scanning) while uploading the bid. The submission shall mean that E.M.D. is received for
purpose of opening the bid. Accordingly, offer of those shall be opened whose E.M.D. is received
electronically. However, bidder shall submit the DD in original to Chief Officer, Notified Area,
Plot No. 409/C, GIDC, Panoli-394116 payable at Panoli As per the schedule specified in tender
notice for submission of document in physical form i.e. from 20/11/2026 to 21/11/2026 up to
17:00 hrs. during working days up to 17.00 hours Only R.P.A.D or Speed Post or Hand
Delivery (During office Hour). The submission of document before 20/11/2026 and after
21/11/2026 will not be considered and offer treated as non-responsive. Exemption certificate
shall not be acceptable.
Earnest money in specified form @ 1 % of the estimated cost must be sent as mentioned above
preceding electronically. Tenderer may pay earnest money up to Rs. 50,000 in cash or in the
form of Crossed Demand Draft or fixed deposit or fixed deposit at-call receipts with a validity
period of not less than 180 days of Nationalized or Scheduled bank or Narmada/Shrinidhi
F.D.Rs. drawn in favour of Chief Officer, Notified Area Officer, GIDC, Panoli concerned.
Earnest money by cheque& Bank Guarantee shall not be accepted. (vide R & BD G. R. No.
TNC/ 1090/ (100) (4)-C, dated 4-11 -2000). However, in respect of the works estimated to cost
above Rs. 50 Lakh, the amount of earnest money in excess of Rs. 50,000 can be offered by the
contractor, at his choice, in the form of Bank Guarantee of the Scheduled or nationalized Bank
only. The Bank Guarantee in such cases will be furnished in the following form. In such cases
also, the amount of earnest money first Rs. 50,000 will be paid only in the form of crossed
demand drafts or fixed deposit receipts or deposit at call receipts worth the validity period of not
less 180 days of the nationalized or scheduled or Narmada/ Shrinidhi F.D.
Sign of Contractor Chief Officer
NA, GIDC Panoli
If the contractor does not turn up to pay the Security Deposit and execute contract agreement
within specified (or extended) time after intimation to him about acceptance of his offer, the
earnest money paid for this work will be forfeited according to Clause-1 of this tender form
tenderer's tender shall be rejected and then according to aforesaid provision of tender, action to
blacklist the Contractor will be initiated without Delay. (Vide R & B D G.R. No. Misc. - 1097 -
90-1091/97 -Z/C dated 04-10-97 & Parach-102008-5-C-Partfile dated 27-11-08).
Bank Guarantee is permissible only when the estimated cost of work is more than Rs. 50 Lakh.
___________________ (hereinafter called the Tenderer) is desirous and preferred to tender for
works in accordance with the terms and conditions of tender for the work of __________ and
where as We, Bank, agree to give the tenderer a guarantee for the Earnest Money.
Therefore, we hereby affirm that we are guarantors on behalf of the Tenderer up to total rupees
figures) and we undertake to pal to Executive Engineer
_______________Division____________ Department of Government of Gujarat
________________________________________________up to his first written demand,
without demur, without delay and without the necessity of a previous notice of judicial or
administrative procedures and without the necessity to prove to the Bank the defects or
shortcomings or debits of the contractor any sum within the limit of Rs.
We further agree that the Guarantee herein contained, shall remain in full force and effect during
the period that would be taken for the acceptance offender.
However, unless a demand of claim under this guarantee is made on us in writing on or before
the _____________________ (Date to be specified - will not be less than 180 days from the
stipulated date of receiving the tender) we shall be discharged from all liabilities under this
guarantee thereafter.
We undertake not to revoke the guarantee during it currency except with the previous consent of
the Executive Engineer _______ ____________ Division __________________________in
We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or
Date Signature & Seal of Guarantor __________________________
The Earnest Money submitted in the form of Deposit-At-call receipt shall need minimum validity
of six months from the last date of online submission of tender. Tender not supported with tender
fee, Earnest Money & documents and not submitted in electronic format (by scanning) while
uploading the bid shall be rejected as NON-Responsive. If the tenderer modifies or withdraws his
tender, the Earnest Money (in case of EMD exemption certificate, proportionate amount
equivalent to EMD of a particular tender) shall be forfeited and the tenderer may be disqualified
from tendering for future works under the Government.
The Earnest Money will be returned to the unsuccessful tenderers. The Earnest Money will be
returned to the successful tenderer after he furnishes security deposit and duly enters into the
Within Ten days or within such time as may be decided by the Tender Inviting Authority from
date of receipt of the Letter accepting his tender, the successful tenderer shall furnish the required
security deposit aand attend the office of the Tender Inviting Authority for execution of the
Sign of Contractor Chief Officer
NA, GIDC Panoli
contract documents. If he fails to furnish the security deposit or execute the contract document,
his Earnest Money (in case of EMD exemption certificate equivalent amount there from) shall
be forfeited and action to blacklist the contractor bill be initiated without delay (Vide R & B.D.
3. SECURITY DEPOSIT (SD) – 05% of Estimated Cost put to tender.
SD is payable in the manner set out in the Technical Bid with Prequalification
Application by the successful tenderer / Bidder.
PERFORMANCE BOND in the form of small saving N.A.
or Narmada Bond or FDR – 5% of the estimated cost.
(Validity period of 2 years)
Initial Security Deposit (2.5%) Rs. 58,890.00 (2.50%)
To be deducted from R.A. Bill - 2.5% of the estimated Rs. 58,890.00 (2.50%)
4. PROGRAMME OF WORK:
The program of work for this contract is as under.
Submission of Bid
Period for Validity of offer Period of completion
120 days from the stipulated
date of receiving of the
01 Month from the
tender but no modification
As per Above date of issued work
shall be allowed after
handing over tender to postal
The time is essence of the contract. The contractor shall have to ensure progress of the work
proportionately as per Schedule-C of B-1 agreement.
5. SUPERVISION OF WORK:
The quality assurance and quality control in addition to the Engineer-in-charge of the work.
6. FREE MAINTENANCE GUARANTEE PERIOD: as per clause of B-1 form
7. DEFECT LIABLITY PERIOD: as per clause of B-1 form
8. PRICE VARIATION CLAUSE & STAR RATE FOR CEMENT, STEEL AND BULK
9. MOBILIZATION ADVANCE:
Not Applicable.
10. PURCHASE OF BITUMEN BY THE AGENCY:
The contractor shall have to purchase the bitumen in Bulk only from only Govt. recognized refinery
& shall have to produce the original purchase bills along with the original gate passes etc. The
bitumen to be brought on site includes all transportation charges, taxes etc. with all lead and lift.
11. POWER SUPPLY / WATER SUPPLY / OTHER UTILITIES:
Sign of Contractor Chief Officer
NA, GIDC Panoli
The Contractor will make his own arrangement at his cost for power supply / water supply and
other utilities required for the execution of work and arrangements for temporary distribution. All
the works will be done as per IEA regulations. The Contractor shall ensure at his cost that all
electrical lines, water supply lines and equipment & all installations are approved by the state
electricity inspector before power can be supplied by State Electricity Board & GIDC for water/
other utilities.
12. CONDITIONS OF CONTRACT:
Successful bidder shall have to enter in to prevailing agreement B-1 with NAA, all the tender
documents including pre-bid meeting minutes, negotiation letter and acceptance letter will form-
An integral part of the contract. All works will confirm to the Indian Standards, specifications for
road & Bridge works of Ministry of Road Transport and Highway or other equivalent standard
mentioned in the contract document as approved by the Engineer-in-charge.
1) Bids of those bidders who have submitted all information, statistical details as required in
the bid documents through E-tendering will only be considered by Competent Authority of
BOM (Board of management)/NAO, G.I.D.C, Panoli.
2) BOM (Board of management)/NAO, G.I.D.C, Panoli reserves the rights to reject or accept
any bid, and cancel the prequalification process and reject all bids.
3) The NAO, G.I.D.C, Panoli shall neither be liable for any such actions nor not be under any
obligation to inform the applicant of the grounds for them. The NAO, G.I.D.C, Panoli
decision shall be final and binding.
Sign of Contractor Chief Officer
NA, GIDC Panoli
Name of Work: - Constructing Protection wall & Providing, Supplying,
fixing in position 1600 mm dia RCC NP3 Pipe for Storm Water Drainage
at NA Panoli GIDC-(Chainage-43040 Nr. Bajaj Healthcare Ltd.)
SPECIAL CONDITIONS
a) The amount of EMD to be paid should be in the form of demand draft or FDR for more than
180 days of Nationalized / Scheduled Banks and ICICI, IDBI, HDFC & Axis Banks in
favour of Chief Officer, NA, GIDC, Panoli.
b) Units registered with Industries Dept. or with NSIC as a Small-Scale Unit shall have also to
pay prescribed tender fees and earnest money deposit. Exemption certificate issued by Govt.
/ any other authority for EMD shall not be valid for Notified works.
c) The amount of earnest money deposit to be paid in the form of DD / FDR in favour of “Chief
Officer Notified Area Office GIDC Panoli” should be attached, along with the tender only,
otherwise it will not be accepted. It may be noted that DD / FDR brought personally at the
time of opening, will not be accepted at all.
d) The earnest money deposit of the unsuccessful contractor(s) shall be returned without
interest within reasonable time after final decision on the tenders and after entering into a
contract with the Corporation by the contractor whose tender is accepted.
2) The contractor shall have to furnish Income Tax Clearance certificate before his tender is
accepted and intimate assessment number and ward under which is accessed.
As Per GIDC Circular No. GIDC: ENG: CIR: CE: 594 dtd. 18th July 2007. &GIDC
Circular No. GIDC: ENG: CIR: CE: 808 dtd. 13.12.2007 and Due to Modification
/Changes in the clauses of B1 agreement of R & B department and to match the R&B
department tender agreement, it is decided to adopt the Performa of B1 agreement of R & B
Department for Notified tender works, except for the following clauses: -
i) Clause: 60/APrice variation clause (Star Rate) ....... Deleted……
ii) Clause No 72: Secured Advance to Contractor...... Deleted......
ii) Clause No 73: Advance Payment...... Deleted......
iii) Clause No. 74: Advance against Machineries ...... Deleted......
iv) Clause No 75: Mobilization Advance ...... Deleted......
v) For EMD: - Exemption certificates for EMD issued against standing security by any
other authority shall not be valid for Notified works.
vi) Copies of certificate as regards previous experience, if any, must accompany the tender.
Sign of Contractor Chief Officer
NA, GIDC Panoli
Name of Work: - Constructing Protection wall & Providing, Supplying, fixing
in position 1600 mm dia RCC NP3 Pipe for Storm Water Drainage at NA
Panoli GIDC-(Chainage-43040 Nr. Bajaj Healthcare Ltd.)
GENERAL CONDITIONS
Contractors may please read be carefully
1) LABOUR CONTRACTACT:
The contractor tendering for the work shall have to obtain license under the labour
contract (Regulation and Abolitions) Act, 1970 within a week or award of work comply
with all the provision of Act. As license. Also, they hall provide all the amenities for the
amenity I not provided by the contractor such amenity shall be provided by the Contractor
such amenity shall be provided by the Chief Officer, as principal employer as his
representative within the prescribed time and the expense incurred by the principal
employer providing the evenly shall be recovered by the amount payable by the
Contractor. The Contractor shall act in accordance with the provisions of the act in all
respect and shall absolve the principal employer from any consequence whatsoever.
Every principal Employer shall nominate a representative duly authorized by him to be
present at the time of disbursement of wages and it shall be the duty of such representative
to certify the amount paid as wages in such manner as may be prescribed, shall nominate
representative duly authorized by him to be present at the time of disbursement of wages
and it shall be the duly of such representative to certify the amount paid as wages in such
manner as may be prescribed.
In case the Contractor fails to make payment of wages within the prescribed period or
makes short payment. The principal employer shall be liable to make payment of wages
in full or the unpaid balance due as the case may be the contract labour employed by the
contractors and recover the amount so paid from the contractor by deduction from any
amount form the contractor by deduction from any amount payable to the contractor
under contract.
The contractor shall provide every facility to the principal employer to maintain registers
and records giving particulars of contract labour employers. The nature of work
performed by the contact labour the contractor labour rate of wages paid to the contact
labour and such other particulars that are prescribed under the provision of said Act.
Sign of Contractor Chief Officer
NA, GIDC Panoli
The contractor shall be responsible for complying with the provisions of the employee's
provident fund and Miscellaneous Act 1992 scheme and modification of the Act from
The contractor shall get themselves enrolled with Regional Provident Fund
Commissioner or any competent officer appointed under the Act and shall have to get
separate code number in respect of their respective establishment as decided in section-3
of the Employees Provident Fund Act and shall discharge all the liabilities arising out of
aforesaid Act as provided in pere-36 A of the scheme and other provisions of the Act.
The Engineer-in-charge on receiving a report from the competent inspecting officer under
the said Act shall have the power to deduct from the payment to the contractor any sum
required or estimated to be required for good the loss suffered by the worker or workers
by reasons of non-fulfillment of the conditions of the contractor for the benefit of the
workers under the said Act. The contractor shall indemnify GIDC against any payment
to be made and for the observance of the Regulations aforesaid.
3) GENERAL CONDITION:
Tender shall very carefully read through a take Note of following conditions.
1. The successful tender shall have to enter into an agreement, in prescribed "B1" From.
2. The tenderer shall get himself well acquainted with the job requirement, site conditions,
route and alignment etc.
3. Contractor shall make his own agreement for all the necessary tools, plants equipment
and provide for manpower as and when required. No extra payment in any such respect
be payable to contractor.
4. Contractor shall while entering into agreement shall produce the registration certificate
of his establishment with the competent authority of Regional Provident Fund
Commissioner failing which 3% (Three percent) of the bill value due to be paid to
Contractor shall be deducted at source and will be dealt as per Clause 74 of B-1 from.
5. In conformity with prevailing Income-Tax Rules necessary of bill value shall be deducted
at source for which necessary certificate shall be deducted by the Chief Officer.
6. Contractor shall also provide assistance representative and/or authentic person for the
purpose of inspection and verification of transit damages, defects etc. for the insurance
claims but shall not charge any extra payment against such assistance provided.
7. Security deposit of 5% of contract value will be deposited by contractor as per rules.
8. Tender fees, EMD etc. payable to GIDC, by the tenderer by D.D. of FDR etc. shall be
drawn in favour of Chief Officer Notified Area Office GIDC Panoli. The validity of
FDR should not be less than 180 days.
Sign of Contractor Chief Officer
NA, GIDC Panoli
4) GENERAL SPECIFICATION
1. The entire work shall have to be carried out as per the specification of P.W.D. Hand Book
2. The entire work shall be carried out as per the instructions of the Engineer and to his
entire specification.
3. The specifications of the materials shall be followed as per front sheet.
4. No extra payment will be made due to change in design and plans of the structure.
5. The contractor shall have to make his own arrangements for water to be used in the
construction work.
5) FOLLOWING CORRECTIOSN ARE THERE IN B1 AGREEMENT BOOKLET.
CONTRACTORS MAY PLEASE BE READ CAREFULLY.
1. Any sort of correction or erasures in the tender shall not be done by the tender, by
applying white fluid or any other chemical. The tender with correction made in aforesaid
manner shall be outrightly rejected by Corporation.
2. If any corrections erasures or overwriting are required by the tendered before submitting
the tender, all the corrections shall be initialed by the tenderer only before submission of
the tender, otherwise the tender shall be rejected by the corporation.
6) SPECIAL CONDITIONS
1. Price escalation/adjustment clause shall not be applicable for this work.
2. Neither secured advance nor mobilization advance shall be payable for this work.
3. The contract shall be governed by the law and order of India for the time being in force
and subject to the jurisdiction of total works at Bharuch district.
4. As applicable Income tax deduction shall be made at source at every running bill.
5. As applicable Sales tax deduction shall be made at source at every running bill
6. Security Deposit
1) 5% of the estimated cost put to tender payable in diff. stages.
2) 2.5% of the estimated cost put to tender through running bills at the rate of 5% of value
of RA bills to build up remaining 2.5% of the estimated cost put to tender shall be
deducted so as to complete in 50% of the time limit work.
3) 5% of the estimated cost put to tender payable in form of Narmada Bond / NSC against
signing agreement.
4) 2.5% of estimated cost put as initial security deposit.
Sign of Contractor Chief Officer
NA, GIDC Panoli
GENERAL TECHNICAL SPECIFICATION
Name of Work: - Constructing Protection wall & Providing, Supplying, fixing
in position 1600 mm dia RCC NP3 Pipe for Storm Water Drainage at NA Panoli
GIDC-(Chainage-43040 Nr. Bajaj Healthcare Ltd.)
These specifications apply to all such roads and other its related works as are required to be executed
under the contract or otherwise directed by the Engineer-in- charge. In every case, the work shall
be carried out to the satisfaction to the Engineer and confirm to the location, lines, dimensions,
grades, & cross section shown on the drawing or as indicated by the Engineer.
The quantity of materials, processing of materials as may be needed at the site, silent feature of the
construction work and quality of finished work shall comply with the requirements set forth in
succeeding section, where the drawing and specification describe a portion of the work in only
general terms and not in complete detail it shall be understood that only the best general practice to
prevail, materials and workmanship of the best quality are to be employed and instruction of the
Engineer are to be fully complied with.
A list of Indian Road Congress Specifications, Recommended code of practice and specification of
Road and Bridge works (Ministry of Road Transport & Highways) published by I.R.C. etc., which
have been made use of in the preparation of these specifications.
The latest edition of all specifications / standards till 30 (thirty) days before the final date of
submission of tender, shall be adopted.
2) DEFINITIONS:
The words like contract, contractor / binder, Engineer (Synonymous) with Engineer- in-charge,
drawings, employer, Government, G.I.D.C, PIA, Works & work site used in these specifications
shall be considered to have the meaning as understood from the definitions of these terms given in
the General condition of contract.
3) SCOPE OF WORK:
The work to be carried out under the contract shall consist of the various items as generally
described in the tender documents as well as in the bill of quantities furnished in the tender
The work to be performed shall include all general works, preparatory to the construction of road
and all other related works. The work shall include work of any kind necessary for the due and
satisfactory construction, completion and maintenance of the works to the intent and meanings of
the drawings and these specification and further drawings and orders that may be issued by the
engineer from time to time.
The scope of work shall include compliance by the contractor with all general condition of contract,
whether specifically mentioned or not in the various clauses of these specifications, all materials,
apparatus, plant, equipment, tools, fuel, watering, strutting, timbering, transport, offices, stores,
workshop, staff, labour and provision of proper and sufficient protective work, diversions,
temporarily fencing & lighting. It shall also include : Safety of workers, first-aid equipment’s,
suitable accommodation staff and workman with adequate sanitary arrangement, the effecting and
maintenance of all insurance, the payment of all wages, salaries, fees, royalties, duties, or other
charges arising out of the erection of the work and the regular clearance of rubbish, reinstatement
Sign of Contractor Chief Officer
NA, GIDC Panoli
and cleaning up of the site as may be required on completion of works, safety of the public and
protection of the works and adjoining land.
The contractor shall ensure that all actions are taken to build in quality insurance in the planning
and execution of the work. The quality insurance shall cover all stages of work, such as setting out,
selection of materials, selection of construction method, selection of equipment and plant,
deployment of personnel and supervisory staff, quality, control, testing etc. The work of building
in quality insurance shall be deemed to be covered in this scope of the work.
4) GENERAL CONDITION REGARDING USE OF EQUIPMENT ON WORKS:
In addition to the general conditions already indicated, the following conditions regarding use of
equipment in works shall be satisfied.
I. The contractor shall be required to give a trial run of the equipment(S) or establishing their
capability to achieve the laid down specifications and tolerance to the satisfaction of the
Engineer before commencement of the work.
II. All equipments provided shall be of proved efficient and shall be operated and maintained at
all times in a manner acceptable to the Engineer.
III. All the plant / equipment to be deployed on the work shall be got approved from the Engineer
for ensuring their fitness and efficiency before commencement of the work.
IV. Any material or equipment not meeting the approval of the Engineer shall be removed from
the site forthwith.
V. No equipment or personnel will be removed from site without permission of Engineer.
VI. The contractor shall also make available the equipment for site quality control work as directed
by the Engineer.
5) PROGRAMMING:
The Chief Officer may at any time give directions as to the order & manner in which the several
parts of the work shall be carried out. The contractor shall strictly observe such directions. The
contractor shall at all-time be responsible for any damage and trespass committed by his agent and
working people in earring out the work unless trespass is authorized by the Chief Officer is working.
9) PERMIT & LICENSE:
The contractor shall procure at his sole expenses all permit & license & pay all charges and fee for
lawful execution of the work.
Sign of Contractor Chief Officer
NA, GIDC Panoli
GENERAL SPECIFICATION FOR QUALITY CONTROL ON WORKS & MATERIALS:
1. The contractor shall be responsible for the quality of the work in the entire construction work
within the contract. He shall, therefore, have his own independent and adequate set up for
ensuring the same.
2. The contractor shall provide necessary co-operation and assistance in obtaining the samples for
test and carrying out the field tests as required by the Engineer-in-charge from time to time. This
may include provision of labour, attendance, assistance in packing and dispatch and any other
assistance considered necessary in connection with the test.
3. All materials to be used, all method adopted and all works performed shall be strictly in
accordance with the requirements of this specification. The contractor shall set up field
laboratory at the location approved by the Engineer & equipment the same with adequate
equipment and personnel in order to carry out all required test & quality of control work as per
specification or as directed by the Engineer-in-charge. The list of equipment & the facilities to
be provided shall be got approved from the Engineer-in- charge in advance.
4. The contractor's laboratory should be manned by a qualified materials Engineers, Civil
Engineers, assisted by experienced technicians & the set up should be got approved by the
5. The contractor shall carry out quality control tests on the materials & work to the frequency
stipulated in subsequent paragraphs. In the absence of clear indications about method and or
frequency of tests for any item, the instructions of the Engineer shall be followed.
6. For satisfying himself about the quality of the materials & work, quality control test will also be
conducted by the Engineer, and Corporation's quality control units or consultant as approved by
the Corporation, generally to the frequency set forth herein under. Additional tests may be also
conducted where, in the opinion of the Engineer, need for such test exists.
7. For the work of embankment, sub-grade, and pavement, construction of subsequent layer of
same or other materials the finished layer shall be done after obtaining permission the Engineer.
Similar permission from the Engineer shall be obtained in the respect of all other items of work
prior to proceeding with the next stage of construction.
8. The contractor shall carry out modifications in the procedure of work if found necessary, as
directed by the Engineer during inspection. Works failing short of quality shall be
rectified/redone by the contractor at his own cost and defective work shall also be removed from
the site of work by the contractor at his own cost.
9. For testing of samples of soil/soil mixes, granular materials, and mixes, bituminous materials &
mixes, aggregates, course etc. samples in the required quality & form shall be supplied to the
Engineer by the contractor at his own cost.
10. For cement, quarry spauls, aggregate, bitumen, mild steel similar other materials where essential
tests are to be carried out at the manufacture’s plant or at laboratory other than the site laboratory,
the cost of samples, sampling, testing, and furnishing of test certificate. He shall also furnish the
test certificate to the Engineer.
11. The contractor should not that materials other than site laboratory shall be tested in Govt.
recognized laboratory at his own cost.
12. For testing of cement concrete at site during construction, arrangement for supply of samples,
sampling. testing & supply of test results shall be made by the contractor as per the frequency
and number of tests specified in the Hand book of Quality control for construction of roads and
runways (IRC Special publication No. ll), and the Ministry of Shipping & Transport
Specifications and where the same are silent, as per the relevant IRC Standards, specifications,
guidelines, Special publications and IS Standards. In the absence of relevant Indian standards,
the sampling and testing procedure to be used shall be approved by the Engineer. Where the
Engineer considers that in the interest of the Control of Quality on materials or workmanship,
modifications, if any, are necessary, such modifications shall be carried out by the Contractor
Sign of Contractor Chief Officer
NA, GIDC Panoli
at no extra cost. The sampling and testing procedure to be used shall be approved by the
Engineer and his decision shall be final and binding on the contractor.
13. The materials shall be tested in approved Laboratory other than site laboratory.
14. Norms for testing the Building Materials given in this volume shall also be followed.
15. The materials for embankment construction shall be got approved from the Engineer. The
responsibility for arising & obtaining the land for borrowing or explore in any other way shall
rest with the contractor who shall ensure smooth & uninterrupted supply of materials in the
required quality during the construction period.
16. Similarly, supply of aggregates for construction of road pavement shall be from quarries
approved by the Engineer. Responsibility for arising uninterrupted supply of material from the
source shall be that of the contractor.
(2) DEFECTIVE MATERIALS:
All materials, which the Engineer/ Q.C. unit of Corporation/ Third Party Inspector appointed by the
Corporation has determined as not conforming to the requirements of the contract shall be rejected
whether in place or not, they shall be removed immediately from the site as directed. Materials,
which have been subsequent collected, shall not be used in the work unless approval is accorded in
writing by the Engineer. Upon failure of the contractor to comply with any order of the
Engineer/Q.C. unit of the Corporation / Third Party Inspector appointed by the Corporation, given
under this clause. Engineer/ Q.C. unit of the Corporation / Third Part Inspector appointed shall have
authority to cause the removal of rejected material and to deduct the removal & allied cost thereof
from any payments due to the Contractor.
Sign of Contractor Chief Officer
NA, GIDC Panoli
i. All materials to be used shall confirm to the relevant specifications as are per the latest edition
of Indian Standard, unless otherwise stated in the detailed specifications of items of works.
ii. All materials to be used shall be of approved quality & make as per list of approved makes
attached with the tender documents.
iii. Wherever to any Indian Standard appears in the specification, it shall be taken to mean as
a reference to the latest version of the standard.
iv. The following specifications, standards, and codes are made a part of this specification\Tender
Indian Standards: specification for building materials, specification for equipment, method of test,
method of measurement of building works, code of practice for construction, safety code for
demolition of building, safety code for scaffolds etc. published by the Bureau of Indian Standards
Tests for materials shall invariably be got carried out by the contractor when the same are
specified in the specification’s tests shall also have to be carried out, even though the same are not
specifically mentioned in the specifications. If the opinion of the EIC, the same are required to be
carried out. All tests shall be got carried out in Government or in other approved laboratories and
cost there of shall be entirely borne by the contractor.
i. The contractor shall invariably carry out Materials & work Tests as specified in the tender
document (B1- Form) and IS code. However, if the additional tests are required as per the
opinion of the Engineer-in-charge, the same shall also have to be carried out. All such tests shall
be got carried out in Government or as approved laboratories and cost thereof shall be entirely
borne by the contractor. No collection of materials shall be made before it is got approved from
ii. Collection of materials shall be done at site of work in a systematic manner. Materials shall be
stored in such a manner as to prevent deterioration or intrusion of foreign matter and to ensure
the preservation of their quality and fitness for work.
iii. Materials, if rejected by the EIC, shall be immediately removed from the site of work. If they are
not removed within twenty-four hours of receiving such an intimation, EIC shall get the same
remove at contractor’s cost. The EIC shall dispose-off such materials in a manner as he chooses
and the contractor shall not be entitled to any compensation for the cost of such materials.
iv. Approval to the samples of various materials given by the EIC will not absolve the contractor
from the responsibility of replacing the defective materials brought on site or materials used in
the work round defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the EIC.
v. The contractor shall be responsible for observing the laws, rules & regulations imposed under
the “Minor Mineral Acts” such other laws and rules prescribed by Government from time to
Water to be used for mixing & curing or for any use in work shall be clean, clear and free from
injurious amounts of oils, acids, alkalis, salts, sugar, organic material and other substances that may
be deleterious and cause of either weakening the mortar or concrete or cause efflorescence or attack
the steel in RCC. Water shall also not be salty or brackish. Container for transport, storage &
handling of water shall be clean.
If required by the EIC, it shall be tested by comparison with distilled water. Comparison shall be
made with standard cement tests as soundness, curing time and mortar strength as specified in IS –
Sign of Contractor Chief Officer
NA, GIDC Panoli
269-1976, any indication of unsoundness, change in time offsetting by 30 minutes or more or
decreases of more than 10 percent in strength of mortar prepared with water sample when compared
with the results obtained with mortar prepared with distilled water shall be sufficient cause for
rejection of water under test. Water fit for drinking will generally be found suitable for mortar or
concrete. Water for curing to mortar concrete or masonry should not be too acidic or too alkaline. It
shall be free of elements which significantly affect the hydration reaction or otherwise interfere with
the hardening of mortar of concrete during or those produce objectionable stains or other unsightly
deposits on concrete or mortar surfaces.
Hard and bitter water shall not be used for curing. Portable water will generally be found suitable
for curing of mortar of concrete. As a guide the following concentrations represent the maximum
permissible values:
a. To neutralize 100ml sample of water, using phenolphthalein as indicator, it should not require
more than 5ml of 0.02 normal NaOH, when tested as per para 8.1 of IS 3025 ( part 22).
b. To neutralize 100ml sample of water, using mixed indicator, it it should not require more than
25ml of 0.02 normal H2SO4, when tested as per para 8 of IS 3025 (part 23)
c. Permissible limits for solids shall be as per table – 1 of IS 456 / 2000 or latest revision. Water
approved for construction purpose shall be also good for curing purpose. How ever, water used
for curing should not produce any objectionable stains or unsightly deposits on construction
surfaces. The presence of Tannic acid & iron compounds is objectionable.
PERMISSIBLE LIMITS FOR SOLIDS IN WATER FOR CONSTRUCTION.
Sr. Type of Impurity. Tests as per. Permissible limits of Impurities.
1. Organic. IS 3025:P-18 Max: 200 mg. / lit.
2. Inorganic. IS 3025:P-18 Max: 3000 mg. / lit.
3. Sulphates – SO3. IS 3025:P-24 Max: 400 mg. / lit.
4. Chlorides -- Cl.. IS 3025:P-32 Max: 2000 mg. / lit. for PCC. Max:
500 mg. / lit. for RCC.
5. Suspended matter. IS 3025:P-17 Max: 2000 mg. / lit.
PH value of water shall not be less than
Lime shall be hydraulic lime as per I.S. 712-1973. Necessary tests shall be carried out as per IS-
69332 (Part I to X)
Storage shall comply with I.S. 712-1973. The slacked limes if stored shall be kept in a weather proof
and damp- proof shed with impervious floor and sides be protected it against rain, moisture, weather
and extraneous materials mixing with it. All limits that have been damaged in any way shall be
rejected and all rejected materials shall be removed from site of work.
Field testing shall be done according to I.S. 1624-1974 to show the acceptability of materials.
Cement shall be ordinary Portland cement grade 33 as per I.S - 269, grade 43 as per I.S– 8112 and
cement of grade 53 as per IS - 12269. Sulphate resisting cement as per IS – 12330. Cement shall be
procured by the contractor from authorized dealer of the manufacture of repute. Contractor shall
procure Test certificate from manufacture for the cement company for the batch of cement supplied.
Cement manufactured from Mini Plant shall not be used. The contractor shall take every precaution
to store the cement properly so that it is not spoiled by dampness etc. Cement required for use shall
be fresh as possible and stored on planks raised 15 to 20 cms. above the floor and stacked 30 cms.
Sign of Contractor Chief Officer
NA, GIDC Panoli
away from the wall in suitable closed weather proof godown at the site of work. Cement shall
be stored in such a way to allow the removal and use of cement in chronological of receipt i.e.
first received being first used. Not more than 15 bags shall be stacked vertically in one pile and
maximum width of the piles should not more than 3 meters. Any cement which has deteriorated
caked or which has been set or partially set shall not be used. When temporarily stored in open for
use, it shall be kept on a suitable platform and suitably protected as necessary. Any cement that is
damaged through careless handling, transport and storage shall be contractor’s responsibility and
be removed all rejected cement from site within 24 hours.
Different brand of cement of cement or cement of the same brand from different factories shall be
stored in separate groups and shall not be mixed during use. Cement shall be kept in a store under
double locking arrangements. A board indicating stock and daily transactions of cement shall be kept
in each room of the cement store. Daily account of receipt & use of cement bags shall be maintained
by the contractor in the Performa prescribed by the EIC.
Necessary tests for quality assurance as per quality assurance plan shall have to be carried out by the
contractor at his own cost. Cement stored for period longer than three months shall only be permitted
by EIC, after necessary tests carried out by contractor at his cost.
The cement shall be measured by one bag for all use in concrete (except otherwise stated) &
masonry etc. in no case cement shall be measured by boxes or other means for the volumetric pro-
portion of contract & mortar. For calculation for the proportion, the volume of the cement bag shall
be taken as 0.0342 Cum. (1.20 C. ft.) and measuring box of size of 30 cms x 30 cms x 38 cms for
concrete works. If weight concrete is to be used, the cement shall have to be used as per actual
weight and the contractor shall not be entitled for any compensation for loss in weight due to
shifting of bags or on account of any reasons.
(Cement make for all concrete work-Ultratech, Hathi, Ambuja, J K laxmi)
M -4 White cement:
The white cement shall confirm to IS- 8042-E-1076.
M -5 Colored cement:
Colored cement shall be with white or grey Portland cement as specified in the item of the work.
The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of
cement used in the mix. The mixture of pigment and cement shall be properly ground to have a
uniform colour and shade. The pigment shall have such properties to provide for durability under
exposure to sunlight and weather. The pigments shall have the property such that it is neither
affected by the cement nor determent to it.
M -6 Sand / Fine Aggregates:
Fine aggregates shall be Hard, strong, durable, clean and free from veins and adherent coatings. The
use of flaky sand elongated pieces of aggregates is not permitted. The aggregates shall not contain
deleterious materials such as iron, pyrites, coal, mica, shale or similar laminated materials, clay
alkali, soft fragments, sea shells, organic impurities etc. in such quantity as to affect the strength
and durability of structure constructed. Harm full materials may also affect embedded reinforcement
bars in concrete and adversely affect age of concrete structure. Maximum permissible limits of
various deleterious materials permitted are as per table above.
The sand shall be obtained from approved sources by EIC and shall confirm to latest IS No.383.
If the EIC consider it necessary fine aggregates shall be washed and / or screened by the
contractor at their own cost.
Sign of Contractor Chief Officer
NA, GIDC Panoli
The sand shall have fineness modules not less than 2.5 and greater 3.00 and shall confirm to
following analysis.
IS Sieve No. Percentage Passing
Natural / Crushed gravel Crushed Stone
600 microns 25-60 20-50
300 microns 5-30 5-30
250 microns 0-10 0-15
The specific gravity of sand shall not be less than 2.6. In no case, fine aggregates shall be
accepted containing more than 2% by dry weight, not more than 3 ½ % by dry volume, not
more than 5% by wet volume of clay, loam or silt. If any sample or fine aggregate shows,
more than 5% of clay, loam, silt in hour’s settlement after shaking in an excess of water, the
material represented by the samples shall be rejected.
M -7 Stone – dust: -
This shall be obtained from crushing hard black trap-stone. It shall not contain more than 8%
of silt determined by field test with measuring cylinder. The method of determining silt
contents by field is given as under:
A sample of stone dust to be tested shall be placed without drying in 200 mm measuring
cylinder. The quantity of the sample shall be such that if fills the cylinder up to 100 mm mark.
The clean water shall be added up to 150 mm mark. The mixture shall be stirred vigorously
& the contest allowed to settle for 3 hours.
The height of silt visible as settled layer above the stone dust shall be expressed as percentage
or the height of the stone dust below. The stone dust containing more than 8% silt shall be
washed so as to bring the silt content within the allowable limit. The fineness modulus of stone
dust shall not be less than 1.80.
M -8 Black Trap Grit: -
Grit shall consist of crushed or broken stone and be hard, strong dense, durable clean of
proper gradation and free from skin or coating likely to prevent proper adhesion of Mortar Grit
shall generally be cubical in shale and as far as possible flaky elongated pieces shall be
avoided. It shall generally comply with the provision of IS – 383-1970. Unless special stone
of particular quarries are mentioned, aggregate shall be broken from the best black trap stone
as approved by the Engineer-in-charge. Stones shall have no deleterious reaction with cement.
The grit shall conform to the following gradation as per sieve analysis.
I.S. sieve designation Percentage passing for sieve.
The crushing strength of grit shall be such as to allow the concrete in which to be used to build
up the specified strength of concrete.
The necessary test for grit shall be carried out as per the requirement of I.S.- 2386- Part-I to
VIII of 1993 or as revised from time to time as per instruction of the Engineer- in-charge.
M -9 Cement Mortar.
Sign of Contractor Chief Officer
NA, GIDC Panoli
Cement : Cement shall confirm to specification M-3
Water : Water shall confirm to specification M-1
Sand : Sand shall confirm to specification M-6.
Proportion of mix:
Cement and sand shall be mixed to specified proportion. Sand being measured by measuring
boxes. The proportion of cement will be by volume on the basis of 50kg/bag of cement being
equal to 35 liters or 0.0342 M3. The mortar may be hand mixed or machine mixed as directed
by the Engineer-in-charge.
Preparation of mortar:
In hand mixed mortar, cement and sand in the specified proportion shall be thoroughly mixed
dry on a clean impervious platform by turning over at least 3 times of more till a homogeneous
mixture of uniform colour is obtained. Mixing platform shall be so arranged that no
deleterious, extraneous material shall be get mixed with mortar or mortar shall flow out, while
mixing the water shall be gradually added and thoroughly mixed to form a stiff plastic mass
of uniform colour so that each particle of sand shall be completely covered with a film of wet
cement. The water cement ratio may be adopted as directed by the Engineer-in-charge.
The mortar so prepared shall be used within 30 minutes of adding water; only such quality of
mortar shall be prepared as can be used within 30 minutes. The mortar remaining unused after
that period or mortar which has partially hardened or damaged shall not be re-tempered or
remixed. It shall be destroyed or thrown away.
M -10 Black trap stone coarse aggregate for plain and ordinary reinforced concrete.
Coarse aggregate shall be of machine crushed stone of black trap and be hard strong, dense,
durable, clean and free in skin and coating likely to prevent proper adhesion of mortar. The
aggregate shall generally be cubical in shape. Unless special stones or particular quarries are
mentioned, aggregates shall be machine crushed from the best black strap stone as approved
by the Engineer-in-charge. Aggregate shall leave no deleterious reaction with cement. The size
of the coarse aggregate for plain cement concrete and ordinary reinforced cement concrete
shall generally be as per the table given below. However, in case of reinforced cement
concrete the maximum limit maybe restricted to 6 mm less than the minimum lateral clear
distance between bars or 6mm less than the cover which is smaller.
L.S. sieve Percentage aggregates 40 Passing for single of Size 16mm
designation. mm nominal size 20mm
This percentage may be varied somewhat by the Engineer-in-charge when considered necessary
for obtaining better density and strength of concrete.
Single size coarse aggregates confirming to the requirements in Table No. 1 above or following
nominal size shall be used at site with the other ingredients of concrete as indicated below. The
mixing shall be in a mixture or on the platform as directed in case of CC 1:5:10 only. For CC
Sign of Contractor Chief Officer
NA, GIDC Panoli
1:4:8, CC 1:3:6, CC 1:2:4 and CC 1:11/2:3 mixing with the other ingredient of concrete shall be
done in the mixture only except for small works.
M -14 Mild Steel Bars:
Mild steel bars reinforcement for RCC work shall conform to I.S. 432 1966 and of tested
quality. It shall also comply with relevant part of IS 456-1978.
All reinforcement shall be cleaned and free from dirt, oil, paint, grease, mill’s make or loose
or thick rust at the time of placing.
Reinforcement steel shall be stored such as to avoid distortion and sags of long length and
shall be protected as far as possible from surface deterioration. All bars of the same designation
shall be stacked separately as far as possible and distinctly marked. For the purpose of
payment, the bar shall be measured correct up to 10mm length and weight payable worked
out at the rate specified below.
1 6 mm 0.22 kg / RMt
2 8 mm 0.39 kg / RMt
3 10 mm 0.62 kg / RMt
4 12 mm 0.89 kg / RMt
5 14 mm 1.21 kg / RMt
6 16 mm 1.58 kg / RMt
7 18 mm 2.00 kg / RMt
8 20 mm 2.47 kg / RMt
9 22 mm 2.98 kg / RMt
10 25 mm 3.85 kg / RMt
11 28 mm 4.83 kg / RMt
12 32 mm 6.31 kg / RMt
13 36 mm 7.99 kg / RMt
14 40 mm 9.86 kg / RMt
M -15 High Yield Strength Steel Deformed Bars/TMT/CRS:
High yield strength steel deformed bars shall be either cold twisted or hot rolled and shall
conform to IS 1786-1979 & I.S. 1139-1966 respectively or as revised from time to time.
T.M.T. shall conform to IS 1789-FE 500 or as revised from time to time. Approved make for
TMT bar shall be Tata, Kamdhenu, ET, Nilkanth, JSW, Utkarsh, Mono) etc.
Corrosion Resistance Steel shall conform to relevant IS code or as revised from time to time.
Other provisions and requirements shall conform to specification No. M -14 for Mild steel
M -16 Mild Steel Binding Wire:
The mild steel wire shall be of 1.63mm or 1.22mm (16 or 18 gauge) diameter and shall
conform to IS 280-1978 or as revised from time to time.
The use of black wire will be permitted for binding reinforcement bars. It shall be free from
dust, oil paint, grease, loose mill scales or any other undesirable coating which may prevent
adhesion of cement mortar.
Storage: The wire coils shall be stored such as to avoid deterioration.
Measurement: No measurement will be taken of the wire used for tying reinforcement bars.
The rate for reinforcement steel and its fabrication shall include the cost of binding wire.
M -17 Structural Steel:
Sign of Contractor Chief Officer
NA, GIDC Panoli
All structural steel shall conform to I.S.226-1975 & I.S. 800-1962 or as revised from time to
time. The steel shall be free from defects mentioned in I.S. 226-1975 and shall have smooth
finish. The material shall be free from loose mill scale, rust pits or other defects affecting the
strength and durability Rivet bars shall conform to I.S. 1148-1973.
Structural steel shall be stored such as to avoid distortion of section of long length and shall
be protected as far as practicable from surface deterioration. It should be so stored and handled
that material will not be subject to excessive stress and damages. All deformed structural
material will be properly straightened by methods which are not injurious prior or being laid
off, punched or otherwise worked in the shop. Sharp kinks and bends shall be caused for
When the steel is supplied by the contractor test certificate of the manufacturers shall be
produced, if so, required by the Engineer-in- charge. If further test be necessary, they will be
done according to I.S. 226-1975 & I.S. 223-1950 or as revised from time to time.
M -18 Shuttering:
The shuttering shall be either of wooden planking of 30mm minimum thickness with or
without steel sheet lining or of steel plates stiffened by steel angles. The shuttering shall
be supported on battens and beams and props of vertical bellies properly cross braced together
so as to make the form work rigid.
The form work shall be sufficiently strong and shall have camber, so that it assumes correct
shape after deposition of the concrete and shall be able to resist forces caused by vibration of
live load of men working over it and other incidental loads associated with it. The shuttering
shall have smooth and even surface and its joints shall not permit leakage of cement grout.
If at any stage of work during or after placing concrete in the structure, the forms work sags
or budges out beyond the required shape of the structure, the concrete shall be removed and
work redone with fresh concrete and adequate rigid form work. The complete form shall be
got inspected by and approved from the Engineer-in-charge before the reinforcement bars are
placed in position.
If wooden props are used, the props shall consist of bellies having 100mm minimum diameter
measured at mid length and 80mm at thin end and shall be placed at 1 to
m. spacing. These shall rest squarely on wooden sole plates 10 mm thick and minimum bearing
area of 0.10 sq.m. laid on sufficiently hard base.
Double wedges shall further be provided between the sole plate and the wooden props so as
to facilitate tightening and casing of shuttering without jarring the concrete.
The timber used in shuttering shall not be so dry as to absorb water from concrete and swell
budge nor so green or wet as to shrink after erection. The limber shall be properly swan and
planned on the sides and the surface coming in contact with concrete. Wooden from work with
metal sheet lining or steel plates stiffened by steel shall be permitted.
As far as practicable clamp shall be used to hold the forms together and use of nails and spikes
The surface of timber shuttering that would come in contact with concrete shall be well wetted
and coated with soap solution before the concreting is done. Alternatively coat of soap
solution or raw linseed oil of approved manufacturer may be applied in place of soap solution
or raw linseed oil shall be applied after thoroughly cleaning the surface.
The shuttering for beams and slabs shall have camber of 4 mm per meter (1 in 250) or as
directed by the Engineer-in-charge so as to offset the subsequent deflection. For cantilever the
camber at free end shall be 1/50 of the projected length or as directed by the Engineer-in-
Sign of Contractor Chief Officer
NA, GIDC Panoli
The period that shall elapse after concrete has been laid before easing and removal of centering
and shuttering as under taken shall be as follows:
Sr. Part of structure Period
1 Sides of foundation, columns 24 to
beams & walls. hours
2 Undersides of slabs up to 4.5 m 7 days.
3 -do- above 4.5 m add under side of 14 days.
beams and arches up to 6 m span.
4 -do- above 6 m. span and up to 9 m 21 days
5 Undersides of beams and arches 28 days
6 Domes: Shall & other structure of As per
special nature. instruction.
Work damaged through premature or careless removal of forms shall be reconstructed. The period for
striking the form work shall be 1.5 times more in case of Pozzolana cement if used then that of the
ordinary Port land cement and the contractor shall not entitle for any extra claim for the same.
M -19 Expansion Joints, Pre-moulded Filler:
The item provides for expansion joints in R.C.C. frame structure for internal joints, as well as for exposed
joints with the use of pre-moulded bituminous joint filler.
Pre-moulded bituminous joint filler i.e. pre-formed strip of expansion joints filler shall not be deformed or
broken by twisting bending or other handling when exposed to atmospheric condition. Pieces of joint filler
that have been damaged shall be rejected.
Thickness of the pre-moulded joint filler shall be 25mm unless otherwise specified pre- moulded
bituminous joints filler shall conform to I.S. 1938-1961 or as revised from time to time.
M -20 Expansion Joints – Copper Strip & Holdfast:
The item provides for expansion joints in R.C.C. frame structure for internal joints as well as for exposed
joints with the use of necessary copper strip and hold fasts. Copper sheet shall be of 125 mm thick and
125mm or required width with the “U” shape in the middle. Copper strip shall hold fast of 3mm diameter
copper rod fixed to the plaster shoulders on strip at intervals of about 30 or as shown in the drawing or as
directed by the Engineer-in-charge. The width of each flange (horizontal side) of the copper plateto be
embedded in the concrete work shall be 25mm depth of “U” to be provided in the expansion joint in the
copper plate shall be of 25mm.
M-21 85 mm thick pre-cast Rubber moulded interlock paver concrete block:
The 85mm thick pre-cast Rubber molded interlock paver concrete block shall be manufactured by
electrical hydraulic operated block marking machine. The block should have minimum compression
strength of 300 kg. Per sq.cm. The minimum thickness of the pre-cast Rubber molded interlock paver
concrete block shall be 85mm and minimum size shall be 300x300mm. The block shall be of approved
make & best quality as approved by the Engineer-in-charge. The size, shape, and shade of pre-cast Rubber
moulded interlock paver concrete block shall be as approved by the Engineer-in- charge. There shall be
true to shape. There shall be free from crack, crazing, and spots etc.
Sign of Contractor Chief Officer
NA, GIDC Panoli
CODE OF PRACTICE
1. The method of execution of the items shall confirm to the relevant specifications as per the
latest version of the Indian Standard unless specified otherwise and as far as applicable.
2. Wherever a reference to ANY Indian Standard appears in the specification, it shall be taken to
mean as a reference to the latest version of the standard.
3. The following specifications, standards, and codes are made as a part of this specification.
Indian Standards: specification for building materials, specification for equipment, method
of test, method of measurement of building works, code of practice for construction, safety
code for demolition of building, safety code for scaffolds etc. published by the Bureau of
Indian Standards
4. The contractor shall invariably carry out Materials & work Tests as specified in the tender
document (B1- Form) and IS code. However, if the additional tests are required as per the
opinion of the Engineer-in-charge, the same shall also have to be carried out. All such tests
shall be got carried out in Government or as approved laboratories and cost there of shall be
entirely borne by the contractor. No collection of materials shall be made before it is got
approved from the Engineer-in-charge.
5. All moulds, equipment’s etc. required of preparing specimens for the test shall be kept in
sufficient numbers and in good state, as directed by the Engineer-in-charge on the site of work.
6. Specimen for tests shall sent to the laboratory along with representative of N.A. GIDC, Panoli
in time and the results there of shall be promptly obtained and reported to the Engineer- in-
7. Satisfactory test results shall not observe the contractor from dismantling and re-doing any
work revealed to the defective at a later date. The contractor shall have no claim for any
payment or compensation whatsoever on account of replacement of such defective work.
Contractor shall take all precautions and care during dismantling and re-doing the work to
ensure that any other work so far executed does not get damage or affected.
8. The work shall be carried out in true line and level and in conformity with the detailed drawing
and specified patterns.
9. All the work shall be carried out in a workmanship like manner and as per the best techniques
for the particular item.
10. All tools, tempts equipment’s etc. for correct execution of the work as well as for checking
lines, levels, alignments of the works, during execution shall be kept in sufficient numbers on
the side of work.
11. All installations pertaining to water supply and its fixtures as well as drainage lines and sanitary
fitting shall be deemed to be completed only after giving satisfactory tests by the contractor.
12. Scaffolding being provided by the contractor at his own cost for such of the items for the
execution of which it is essential.
Sign of Contractor Chief Officer
NA, GIDC Panoli
In all sorts of soil, sand, gravel, soft murrum and other similar soft or loose material. The
excavation will generally refer to the open excavation for foundation.
Clearing the site:
The site on which the structure is to be built shall be cleared and all obstructions, loose
stones, material, and rubbish of all kind, bush, wood, and trees shall be removed as
directed. The materials so obtained shall be the property of the N.A. GIDC, Panoli and
shall be conveyed the stacked as directed by the Engineer-in-charge.
After clearing the site, the center lines will be given by the Engineer. The contractor shall
assume full responsibility for alignment, elevation, and dimension of each and all parts of
the work. Contractors shall supply labour materials, etc. required for setting out the
reference marks and bench marks and shall maintain them as long as required.
It shall be all sorts of soil, sand, gravel, soft murrum, or other similar soft or loose
The excavating for foundation and for basement shall be carried out in true line and level
and shall have the width and depth as shown in the drawing or as directed by the Engineer-
in- charge. The contractor shall do the necessary shorting and shutting or slopes to a safe
angel, if necessary, including bailing and pumping out water when separate provision
does not exist for it in tender, at his own cost. The bottom of the excavated area shall be
leveled both longitudinally and transversely as directed by the Engineer-in-charge. No
earth filling will be allowed to bring it to level if by mistake or any other reasons
excavation is made deeper or wider than shown on the plan or directed by the Engineer-
in- charge. The extra depth or width shall be made up with concrete or masonry of the
foundation grade as directed by the Engineer-in- charge and at the cost of the contractor.
Disposal of the excavated stuff:
The excavated stuff of the selected type shall be used in filling the trenches in layers
including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from site of work
to a place as directed by the Engineer-in-charge with all lead and lift but within the same
a. Excavation in Hard murrum:
b. Same as C-1/1 except that the excavation shall be in hard murrum.
c. Excavation in Hard murrum and boulders.
d. Same as C-1/1 except that the excavation shall be in hard murrum and boulders.
e. Excavation in soft rock:
f. Same as C-1/1 except that the excavation shall be in soft rock.
g. Excavation in Hard rock.
h. Same as C-1/1 except that the excavation shall be in hard rock
C-1 Plain Cement Concrete Laying in Foundation / for Floor Bedding:
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Before starting concrete, the bed of the foundation trenches shall be cleared of all loose
materials and watered as directed.
Proportioning of Mix:
The proportion of the cement to sand and coarse aggregates shall be as specified in the
item and shall be measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may
however be allowed for smaller quantities of work if approved by the Engineer-in- charge.
The mixing shall be done for a period of 11/2 to 2 minutes. The quantity of water shall be
just sufficient to produce a dense concrete of required workability for the purpose.
All scaffolding, hoisting arrangement and ladders etc. required for the facility of concrete
shall be provided by the contractor and removed on completion of work. The scaffolding,
hoisting arrangement and ladders shall allow easy approach to the work and afford easy
The form work shall be provided, if necessary, as directed by the Engineer-in-charge and
shall be as per I.S. 461-1972 or revised from time to time.
Transporting & placing the concrete:
The concrete shall be handled from the place of mixing to the final position by not more
than 15 minutes by the method as directed by the Engineer-in-charge and shall be placed
into its final position, compacted and finished within 30 minutes of mixing with water i.e.
before the setting commences.
The concrete shall be laid in layers of 15 cms to 20 cms.
The concrete shall be thoroughly compacted by hammers immediately after depositing to
get a dense concrete. Concrete shall not be disturbed once it has set.
After the final set, the concrete shall be kept continuously wet, if required by pounding
for a period of not less than 7 days from the date of placement.
C-2 Lime Cinder Concrete Laying:
This shall be as per C-2 of code of practice. The coarse aggregate in this case shall
C-3 Ordinary Cement Concrete Plain or Reinforce:
I.S. 466-1978 or as revised from time to time shall be followed in general cement sand by
black trap grit and coarse aggregate shall be measured by volume. For proportioning of
cement by volume one bag of cement shall be taken as 0.0342 cu.m. (1.2 cft)
Concrete shall be mixed in a mechanical mixer. Mixing shall be continued until there isa
uniform distribution of the materials and the mass is uniform in colour and consistency
but in no case shall mixing be done for less and 1.1/2 minutes. When hand mixing is
permitted by the Engineer-in-charge in case of small work or in case of breakdown of
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
machineries and in the interest of the work it shall be carried out on a water tight platform
and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However, in such cases 10% more cement than otherwise
required have to be used without any extra cost.
Concrete shall be handled from the place of mixing of the final position as quickly as
practicable by methods which will prevent segregation or loss of ingredients. In no case
operation shall be taken more than 15 minutes.
The concrete shall be placed into its final position and completed and finished within30
minutes of mixing the water and before setting commence. Method of placing shall be such
as to avoid segregation, approved by the Engineer-in-charge. Concreting shall be carried
out continuously up to construction joints, the position and arrangement of which, shall
be pre- determined by the designer.
When the work has to be resumed on a surface which has hardened, such surface shall be
roughened. It shall then be swept clean thoroughly wetted and covered with a thin layer
or mortar composed of cement and sand in the same proportion as the cement and sand in
the concrete mix. This layer of mortar shall be freshly mixed and placed immediately
before the placing of the concrete.
When the concrete has not fully hardened, all laitance shall be removed by scrapping the
wet surface with wire or bristles care being taken to avoid dislodgement of particles or
aggregates. The surface shall be thoroughly wetted and all free water removed. The surface
shall be coated with neat cement grout. The first layer of concrete to be placed on this
surface shall not exceed 150mm in thickness and shall be well rammed against old work.
Particular attention is paid no corners and spots.
Concrete shall be thoroughly compacted during the operation of placing and thoroughly
worked around the reinforcement, around embedded fixtures and into corners of the form
work. Compacting shall be done by mechanical vibrations, in such a way that a dense mix
The concrete shall be kept covered with a layer of sacking canvas or similar materials or
by pounding and kept constantly wet for twenty-one days from the date of placing
concrete. Curing by pounding shall preferably be done by erecting suitable dykes of
The form work shall conform to the shape, lines and dimensions as on the plans and be
so constructed as to remain sufficiently rigid during the placing and compacting of the
concrete, and shall be sufficiently water tight to prevent loss of liquid from concrete.
Adequate arrangements shall be made by the contractor to safeguard against any
settlement of the form work during the course of concreting and after concreting. The
design of the form work and centering shall be got approved form Engineer-in-charge
before erection.
Cleaning & Treatment of Forms:
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
All rubbish, particularly chipping shavings and saw dust shall be removed from the
interior of the forms before the concrete is placed and the form work in contact with
concrete shall be cleaned and thoroughly wetted or treatment with an approved
composition. Care shall be taken that such approved composition is kept out of contact
with reinforcement.
Stripping Time:
In normal circumstances and where ordinary cement is used, forms may be struck after
expiry of following period
(a) Walls columns & vertical side of 24 to 48 hours as may be decided
beams by the Engineer-in- charge.
(b) Side of slabs 3 days
(c) Beam 7 days
(d) Removal of props to slabs.
Slabs spanning up to 4.5 M 7 days.
Spanning over 4.5 M 14 days.
(e) Removal of props to beams & arches.
Spanning up to 6 M
Spanning over 5 M 14 days
Procedure when removing the Form work:
All form shall be removed without such shock or vibrations as would damage the
reinforced concrete surface. Before the soffits and struts are removed and concrete surface
shall be exposed where necessary in order to ascertain that the concrete has sufficiently
hardened. The form work will be paid under the respective item if provided in the tender.
The centering to be provided shall be got approved form the Engineer-in-charge. It
shall be sufficiently strong to ensure absolute safety of the form work and concrete work
before, during, and after pouring concrete. Watch should be kept to see that behavior of
centering and formwork is satisfactory during concreting. Erection should also be such
that it would allow removal of forms in proper sequence without damaging either the
concrete or the forms to be removed.
The props of centering shall be provided on firm foundation of base of sufficient strength
to carry the loads without settlement.
The centering and form work will be inspected and approved by the Engineer-in-charge
before concreting. But this will not relive the contractor or his responsibility for strength,
adequacy, and safety of form work and if there is a failure of form work or centering,
contractor shall be responsible for the damages to work, injury to life and damage to the
All scaffolding, hoisting arrangements etc. required for the facility of concreting shall be
provided and removed on completion of work by the contractor at his own expenses.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The scaffolding, hoisting arrangement and ladders etc. shall be strong enough to withstand
all live, dead and impact loads expected to act and shall be subject to the approval of the
Engineer- in-charge. However, contractor shall be solely responsible for the safety of the
scaffolding, hoisting arrangement, ladders, work, and workmanship.
The scaffolding, hoisting arrangement and ladders shall allow easy approach to the work
spot and afford easy inspection.
Work sample of concrete 150mmx150mm x 150mm shall be taken as under:
Qty. of work in M3 No. of sample
51 & above 4+1 for each additional quantity of
50M or part thereof.
The contractor shall make his own arrangement for taking sample and testing of the sample
in the Government or the approved laboratories. The test shall be carried out in accordance
with IS 516-1959 or as revised from time to time. A register of cubes shall be maintained
the site of work in the prescribed Performa. The result of the cubes shall be submitted to
the Engineer- in-charge by the contractor.
Note:(1) At least one sample shall be taken from each shift
Each sample consists of three test specimens for testing at 28 days.
Additional cubes may be required for various purposes. Such as to determine the
strength of concrete at 7 days or at the time of striking the form work or to determine the
duration of curing or to check the testing error.
Finishing unless otherwise specified in the item to keep the exposed concrete surface,
the concrete surface shall be finished with cement mortar 1:4 (1- cement: 4-sand) in true
line level in accordance with M-9 of specification of materials.
Controlled concrete: Grade:
The concrete shall be designed as M-150, M-200, M-250, M -300 & M-400 as
I.S. 456-1978 or as revised from time to time.
Samples of the aggregates proposed to be used shall be got approved from the Engineer-
in- charge prior to collection of the materials at the site of work field test for determining
the content of silt, loam, clay etc. In fine aggregate and grading and moisture content in
both fine and coarse aggregate shall be carried out before commencing the concreting
work and record of the test shall be maintained till the completion of the work.
The grading of aggregate shall be controlled by obtaining the fine and coarse aggregate
in different size being stocked in separate stock piles. The grading of course and fine
aggregate shall be checked as frequently as possible. The frequency shall be as directed by
the Engineer- in-charge, to ensure that the uniform grading as per approved samples used
in the preliminary tests is maintained.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
As soon as possible, after receiving the order to commence the work the contractor
shall design the mix for different grades of concrete required in the work submit details
in respect of proportion of cement and aggregates water cement ratio etc. and arrangement
to make trial mixes for preliminary tests to be carried out in the Government or any other
approved laboratory to satisfy the Engineer-in-charge that the designed mix meets with
the prescribed strength. The maximum total quantity to aggregates by weight per 50 Kg. of
cement shall not exceed 450 Kg. except where otherwise specifically permitted by the
Engineer-in- charge.
The minimum number of specimens for preliminary test and criteria for acceptance of test
strength shall confirm to Table –V Acceptance criteria for concrete of I.S. 456-
On the satisfactory results of the above tests, the mix actually to be used shall be got
approved from Engineer-in-charge. The approval of the Engineer-in-charge will not
relieve the contractor of his responsibility for obtaining the required minimum strength
in the work test. Record of all tests in support of mix design shall be maintained as a part
of record of the contract.
STRENGTH REQUIREMENT OF CONCRETE:
The compressive strength requirements for various grades of concrete shall not be lower
than the figures given below:
Grade of concrete Compressive strength of 15 cms cubes
conducted in accordance with I.S. 516-1959.
After 28 days after At 7 days after At 28 days after
mixing in mixing in work test mixing In work test
Preliminary test (Kg/cm2)
PROPORTIONING & WORKS CONTROL:
The mix proportions shall be selected to ensure that the workability of the fresh concrete
suitable for the condition of handling and placing, so that after compaction it surrounds
all reinforcement and completely fills the form work. When concrete is hardened, it shall
have the required strength, durability and surface finish.
The determination of the proportions of cement, aggregate and water to attain the
required strength shall as follows:
a. By designing the concrete mix; such concrete shall be called "Design MixConcrete"
or "Controlled Concrete ".
b. By adopting nominal mix, such concrete shall be called "Nominal Mix Concrete".
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
OPTIONAL WORK TEST REQUIREMENTS OF CONCRETE (All values in N/mm²)
(All tests conducted in accordance with IS: 516)
Grade of Compressive Strengthof Modulus of Rupture by Beams Test
Concrete 150mm cubes, min at 7 days Min.
At 72 + 2 at 7 days
The concrete mix shall be designed to have an average strength corresponding to the
values specified for preliminary tests in Table. The proportions chosen should be such
that the concrete is of adequate workability for the conditions prevailing on the work in
question, and can be properly compacted with the means available. The maximum total
quantity of aggregate by weight per 50 kg. Of cement shall not exceed 450 kg.except
where otherwise specially permitted by the Engineer-in-Charge.
Except where it can be shown to the satisfaction of the Engineer-in-Charge that supply of
properly graded aggregate of uniform quality can be maintained over the period of work,
the grading of aggregate should be controlled by obtaining the coarse aggregate in
different sizes and blending them in the right portions when required, the different sizes
being stocked in separate stock piles. The material should be stock piled for several hours
preferably a day before use. The grading of coarse and fine aggregate should be checked
as frequently as possible, the frequency for a given job being determined by the Engineer-
in-Charge to ensure that the suppliers are maintaining the grading uniform with that of
the samples used in the preliminary test.
In proportioning concrete, the quantity of both cement and aggregate should be determined
by weight, where the weight of cement is determined by accepting the maker's weight per
bag. A reasonable number of bags should be weighted separately to check the net weight.
Where the cement is weighed on the site and not in bags, it should be either measured
by volume in calibrated tanks or weighed. All measuring equipment should be maintained
in clean serviceable conditions, and their accuracy periodically checked.
It is most important to maintain the water cement ratio constant at its correct value. To
this end, determination of moisture contents in both fine and coarse aggregates should be
made as frequently as possible, the frequency for a given job being determined by the
Engineer-in- Charge according to weather conditions. The amount of the added water
shall be justified to compensate for any observed variations in the moisture contents. For
the determination of moisture content in the aggregate for concrete: Part- III specific
gravity, density, voids, absorption and bulking may be referred to. To allow for the
variation in weight of aggregate due to variation in their moisture content, suitable
adjustments in the weights of aggregate should also be made.
No substitutions in materials used on the work or alterations in the established
proportions, except as permitted in the above para shall be made without additional tests
to show that the quality and strength of concrete are satisfactory.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
WORKABILITY OF CONCRETE:
The concrete mix proportions chosen should be such that concrete is of adequate
workability for the placing conditions of the concrete and can properly be compacted with
the means available. The definitions of the ranges of "workability" of concrete as
measured by either the slump or V-B tests (IS: 1199) and the range to be adopted for
different kinds of work unless specified otherwise is given in Table - 2.9.
TABLE - 2.9 WORKABILITY OF CONCRETE
Placing conditions Degree of Slump (mm) Values of Workability
Vee- Bee Compacting
Blinding Very Low -- 20- 10 0.75 -
concrete; Shallow secs
Sections; Pavements
Mass concrete; Low 25 - 75 10 - 5 0.80 -
Lightly reinforced secs
sections in slabs, beams,
walls, c o l u m n s ; F l o o r s ;
pavements; Canal
lining; Strip footings
Heavily reinforced Medium 50 - 100 5 2 0.85 - 0.92*
sections in slabs, beams 75 - 100 secs
walls, columns; Fixed
form work; Pumped
Trench fill; High 100 - 150 -- Above 0.92**
In-situ piling Very high Workability t o be Above 0.92**
Termite concrete decided by
determination of
flow (IS: 9103)
Note: For most of the placing conditions, internal vibrators (needle vibrators) are suitable.
The diameter of the needle shall be determined based on the density and spacing of
reinforcement bars and thickness of sections. For tremie concrete, vibrators are not
required to be used.
A competent person should be employed whose duty will be to supervise all stages in the
preparation and placing of the concrete. All works test specimens should be prepared and
site tests carried out under his direct supervision
REQUIREMENT FOR DURABILITY:
Minimum cement content required in cement concrete to ensure durability under specified
conditions of exposure should be as given in Table 2.12 unless otherwise specified. The
general environment to which the concrete will be exposed during its working life is
classified into five levels of severity, that is, mild, moderate, severe, very severe and
extreme as described in Table 2.13.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Minimum Cement Content, Maximum Water Cement Ratio and Minimum Grade of
Concrete for Different Exposures with Normal Weight Aggregates of 20mm Nominal
Sr. No. Exposure Plain Concrete Reinforced Concrete
Minimum Maximum Minimum Minimum Maximum Minimum
Cement Free Water- Grade of Cement Free Water- Grade of
Content Cement Concrete Content Cement Concrete
kg/m³ Ratio kg/m³ Ratio
The general environment to which the concrete will be exposed during its working life is
classified into five levels of severity, that is, mild moderate, severe, very severe and
extreme as described in Table 2.13.
ENVIRONMENTAL EXPOSURE CONDITIONS
Environment Exposure Conditions
Mild Concrete surfaces protected against weather or
aggressive conditions, except those situated in coastal area.
Moderate Concrete surfaces sheltered from severe rain or freezing whilst wet.
Concrete exposed to condensation and rain
Concrete continuously under water
Concrete in contact or buried under non-aggressive soil/groundwater
Concrete surfaces sheltered from saturated salt air in coastal area
Severe Concrete surfaces exposed to severe rain, alternate wetting and drying or
occasional freezing whilst wet or severe condensation.
Concrete completely immersed in seawater Concrete exposed to coastal
Very Severe Concrete surfaces exposed to seawater spray, corrosive fumes or severe
freezing conditions whilst wet.
Concrete in contact with or buried under aggressive sub-soil/ground water
Extreme Surface of members in tidal zone
Members in direct contact with liquid/solid aggressive chemicals
MIX DESIGN AND SAMPLING AND TESTING FOR CONCRETE
Facilities required for sampling materials, shall be provided when required by the
Engineer. The methods used in sampling, laying curing and testing the concrete samples,
either in the field or in the laboratory, shall be in accordance with the appropriate Indian
Standards. This is to investigate the grading of aggregate, water cement ratio, workability
and the quantity of cement required to give works cubes of the minimum strength
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The mix shall be designed to produce the grade of concrete having required workability
and desired characteristic strength. As long as the quality of the materials does not change,
a mix design done earlier may be considered adequate for later work. As already stated
under "proportioning" the proportion of the mix shall be by weight.
In case uniformity in the materials used for concrete making has been established over a
period of time, the proportioning may be done by volume batching, by the use of bulk
densities, provided periodic checks are made on mass/volume relationships of materials.
Where weigh batching is not practicable, the quantities of fine and coarse aggregate (not
cement) may be determined by volume. If aggregate is moist and volume batching is
adopted, allowance shall be made for bulging in accordance with IS: 2386 (Part-III). Mix
proportioning shall be carried out according to the ACI Standard ACI 631 or "Design of
Concrete Mixes” Road Research Note No.4 of Department of Scientific and Industrial
Whenever there is either a change in strength of concrete required, water cement ratio,
workability or the source of aggregates and cement, preliminary tests shall be conducted
again to determine the revised proportions of the mix to suit the later conditions. While
designing mix proportions, over wet mixes should always be avoided.
PRELIMINARY TESTS:
The materials and proportion used in main preliminary tests shall be similar in all respects
to hose to be actually employed in the works as the object of this test is to determine
proportion of cement, aggregates and water necessary to produce the concrete of
consistency required to give the strength specified. It will be the contractor's sole
responsibility to carry out these tests and he shall therefore furnish to the Engineer,
statement of proportions proposed to be used for concrete mix. For preliminary tests, the
following procedure shall be followed. Materials shall be brought to the room temperature
and all materials shall be in a dry condition. The quantities of water, cement and aggregate
for each batch shall be determined by weight to an accuracy of 1 Part in
Concrete shall be mixed in a mechanical mixer. The mixer should comply with IS:
The cement and fine aggregate shall first be mixed dry until the mixture is in uniform
colour. The coarse aggregate shall then be added, mixed and water added and mixed
thoroughly for a period of not less than two minutes after all the materials are in the drum
and until the resulting concrete is uniform in appearance. If there is segregation after
unloading from the mixer, the concrete should be remixed.
The consistency of each batch of concrete shall be measured immediately after mixing,
by the slump test in accordance with IS: 1999. In the slump test, care shall be taken to
ensure that no water is lost; the material used for slump test may be remixed with the
reminder of concrete for making the test specimen. The period of remixing shall be as
short as possible yet sufficient to produce a homogeneous mass.
Note: In exceptional circumstances such as mechanical breakdown of mixer, work in the
remote areas or when the quantity of concrete work is very small, hand mixing may be
permitted, subject to adding 10% extra cement at his (contractor's) cost. When hand
mixing is permitted, it shall be carried out on a watertight platform and care shall be taken
to ensure that mixing is continued until the concrete is uniform in colour and consistency.
CONCRETE CUBES:
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Size of test specimen & moulds:
Test specimens cubical in shape shall be 150 x 150 x 150 mm. If the largest nominalize
of the aggregate does not exceed 200mm, 100 mm cubes may be used as an alternative.
A cube mould should be of metal and stout enough to prevent distortion. It shall be
constructed in such a manner as to facilitate the removal of the moulded specimen without
damage, and shall be so machined that, when it is assembled ready for use, the dimensions
and internal faces shall be accurate within the following limits:
Height of mould and distance between opposite faces: Specified size + 0.2 mm. Angle
between adjacent faces:90 + 0.5 degree
Each mould shall have a plane face metal base plate of such size as to support the
mould during the filling without leakage and shall be attached to the moulds; when
assembled shall be positively and rigidly held together and suitable methods of ensuring
this, both during filling and on subsequent handling of the filled mould, shall be provided.
In assembling the mould for use, the joints between the sections of mould shall be thinly
coated with mould oil and a similar coating of mould oil shall be applied between the
contact surfaces of the bottom of the mould and the base plate in order to ensure that no
water escapes during filling. The interior surfaces of the assembled mould shall be thinly
coated with mould oil to prevent adhesion of the concrete. The tamping bar shall be a steel
bar 16 mm. in diameter, 0.6 m. long and bullet pointed at the lower end.
The test specimens shall be made as soon as practicable after mixing and in such a way
as to produce full compaction of the concrete with neither segregation nor excessive
laitance. The concrete shall be filled into the mould in layers approximately 50 mm deep.
In placing each scoopful of concrete, the scoop shall be moved around the top edge of the
mould as the concrete slides from it, in order to ensure a symmetrical distribution of the
concrete within the mould. Each layer shall be compacted as described below. After the
top layer has been compacted, the surface of the concrete shall be finished level with
the top of the mould using a trowel, and covered with aglass or metal plate to prevent
For compacting, standard tamping bar shall be used and the strokes of the bar shall be
distributed in a uniform manner over the cross section of the mould. The number of
strokes per layer required to produce specified conditions will vary according to the type
of concrete but in no cases shall be less than 35 strokes per layer for 150 mm cubes or
strokes per layer for 100 mm cubes. The strokes shall penetrate into the underlying layer
and the bottom layer shall be rodded throughout its depth. Where the tamping bar leaves
voids, the sides of the mould shall be tapped to close the voids.
The test specimen shall be stored on the site at a place free from vibration under damp-
matting, sacks or other similar material for 24 hours + 0.5 hour from the time of adding
water to the other ingredients at a temperature range of 22 C to 32 C After 24 hours,
they shall be marked for later identification, removed from the moulds and stored in clean
water at a temperature of 24 C to 30 C. They shall be sent to the testing laboratory
well packed in damp sand, sacks or other suitable material so as to arrive there in a damp
condition not less than 24 hours before the time of test. On arrival at the testing laboratory,
the specimen shall be stored in water at 27 C +2 C temperature until the time of test.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Records of the daily maximum and minimum temperature shall be kept both during the
period the specimens remain on the site and in the laboratory.
Tests for Cube Specimen:
The concrete cubes shall be tested in standard testing machines by skilled personnel. Tests
shall be made at recognized ages of the test specimen, the most usual being 7 and 28 days.
Tests may be made at 24 hours + 1/2 hour and 72 hours + 2 hours if early strengths are
needed. The age shall be calculated from the time of the addition of water to the dry
At least three specimens, preferably from different batches shall be made for testing at
each selected age.
Specimens stored in water shall be tested immediately on removal from the water and
while they are still in the wet condition. Surface water and grit shall be wiped off the
specimens and any projecting fins removed.
The bearing surface of the testing machine shall be wiped clean and any loose sand or
other material removed from the surfaces of the specimen, which are to be in contact with
the compression platens. The specimen shall be so placed in the machine that the load
shall be applied to the opposite sides of the cubes as cast, that is, not to the top and bottom.
The axis of the specimen shall be carefully aligned with the centre of thrust of the
spherically seated platen. No packing plates shall be used between specimen and platens
of the machine. Once the uniform seating is obtained, load shall be applied without shock
and increased continuously at a rate of approximately 14.0 N/mm²
/Min. until the resistance of the specimen to the increasing load breaks down and no
greater load can be sustained. The maximum load applied to the specimen shall be
recorded and the appearance of the concrete and any unusual features in the type of failure
shall be noted.
The measured compressive strength of the specimen shall be the maximum load applied
to the specimen divided by the cross- s e c t i o n a l area of the specimen and shall be
expressed to the nearest N. per sq. mm. Average of the values shall be taken as the
representative of the batch provided the individual variation is not more than + 15 percent
of the average. Otherwise repeat tests shall be made. Cube crushing strength shall conform
to the values given in Tables
Frequency of Sampling of Concrete Cubes:
A random sampling procedure should be adopted to ensure that each concrete batch shall
have a reasonable chance of being tested; that is, the sampling should be spread over the
entire period of concreting covering all mixing units. The minimum frequency of
sampling of concrete of each grade shall be as follows:
Quantity of concrete in the work cu. m. No. of samples
51 and above 5 Plus one additional sample for each 50m3
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The test specimens shall be made from each sample for testing at 28 days. Additional
cubes may be required for determining strength of concrete at 7 days. The test strength of
the sample shall be the average strength of three specimens. The individual variation
should not be more than 15 percent of the average.
Concrete shall be assessed daily for compliance. The contractor shall keep a record at site
of all such tests identifying them with the proportion of the work to which they relate.
The Architects will check this record from time to time. The said record shall give the
following details and shall be initiated by the Engineer-in-Charge.
Reference to specific structural member receiving the batch of concrete from which the
cubes were cast.
Mark on cubes.
Mix of concrete.
Data and time of casting.
Water cement ratio by weight and slump.
Crushing strength as obtained at the end of 7 days for 3 cubes out of a set of 6 cubes
end of 28 days for the remaining 3 cubes.
Laboratory in which tested and reference to test certificates.
The quantity of concrete, incorporated in work that is represented by the quantity of
the set of the cubes.
Any other information required by Architects.
The consistency of each sample of concrete shall be measured immediately after remixing
by the slump test. The slump shall be as directed by the Engineer, which would be based
on the preliminary test result keeping in view, the workability of the concrete. The
approved slump shall be maintained through the field operations unless otherwise directed
by the Engineer. In order to ensure the maintenance of uniform consistency, slump tests
shall be carried out as often as demanded by the Engineer and invariably with the batch
of concrete from which test cubes are made.
Record of Temperature:
A record of maximum and minimum temperature at the places of storage of the cube shall
be maintained, during the period they remain at site, by the Contractor.
OPTIONAL TESTS:
The Engineer, if he so desires, may order tests to be carried out on cement, sand, coarse
aggregate in accordance with the Indian Code of Practice or any other approved code.
Tests on cement shall include:
i. Fineness Test,
ii. Test for Normal Consistency,
iii. Test for Setting Time,
iv. Test for Soundness,
v. Test for Tensile Strength,
vi. Test for Heat of Hydration (by experiment and by calculations) in accordance with
BISor any other approved standard for cements.
vii. Test on sand shall include:
viii. Sieve Test
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
ix. Test for Organic Impurities
x. Decantation Test for Determining Clay
xi. Specific Gravity Test
xii. Test for Sieve Analysis and Fineness Modulus. Tests on coarse aggregate shall
xiii. Sieve Analysis
xiv. Specific Gravity and Unit Weight of Dry Loose and Rodded Aggregate (Bulk
xv. Determination of Yield of a Dry Mixture
xvi. Petrographic Examination of Deleterious Minerals in Aggregates.
xvii. Test for Aggregate Crushing Value and 10% Fine Value Test.
xviii. Aggregate Impact Value
xix. Toughness Test
xx. Soundness Test
xxi. Hardness Test
xxii. Alkali Aggregate Reaction
xxiii. Deleterious Material
Any or all these tests would normally be ordered to be carried out, if the specified concrete
strengths are not obtained, at the Contractor's cost. If the works cubes do not give the
stipulated results, the Engineer reserves the right to ask the Contractor to dismantle such
portions of the work, which in his opinion are unacceptable and re-do the work to the
standard stipulated at his (Contractor's) cost. It shall be very clearly understood by the
Contractor that no extra claims shall be entertained by the Owner for excess use of cement
over the minimum quantity stipulated to give the works cubes of required strength. The
unit rate for design and test cubes, works cubes, testing them as per specifications, optional
Unless otherwise stipulated, the concreting, testing, etc. shall be carried out as directed by
the Engineer and to the appropriate BIS Specifications. In the event of any work being
suspected of faulty materials or workmanship or both, the Engineer before requiring its
removal and reconstruction, may order, or the contractor may request, that it should be
load tested in accordance with the following provisions.
LOAD TEST ON MEMBERS OR ANY OTHER TEST:
The test load shall be 125 percent of the specified super imposed load for which the
structure was designed in addition to the full dead load (self-weight of structure members
plus weight of finishes and walls or partitions, if any as considered in the
design). Such test load shall not be applied before 28 days after the time of placing of
During the tests, struts strong enough to take the whole load shall be placed in position
leaving a gap under the members. The test load shall be kept for 24 hours before removal.
If within 24 hours of the removal of the load, the structure does not show a recovery of at
least 75 percent of the maximum deflection shown during the 24 hours under load, the test
loading shall be repeated after a lapse of at least 72 hours. The structure shall be
considered to have failed to pass the test if the recovery after the second test is not at least
80 percent of the maximum deflection shown during the second test.
If during the test, or upon removal of the load, the structure shows signs of weakness,
undue deflection or faulty construction it shall be reconstructed or strengthened as
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Any other test, e.g. taking out concrete cores, examination and test on such cores removed
from such parts of the members in an approved manner and as directed by the
Engineer shall be carried out by the Contractor at his own cost, if so directed.
TESTING CONCRETE OF TANKS FOR LEAKAGE:
In addition to the structural test given in clause above, structures (tanks, chests, pits, etc.)
to be used for storage of liquids shall also be tested for water tightness at full storage level
as described below:
(a) In case of structure whose external faces are exposed such as elevated tanks,
the requirements of the test shall be deemed to be satisfied if the external faces show no
sign of leakage or sweating and remain completely dry over the period of observation of
seven days after allowing a seven days period for absorption after filling with water.
(b) In case of structures whose external faces are backfilled and are not
accessible for inspection, such as underground tanks, the tanks shall be filled with water
and after the expiry of seven days after the filling; the level of the surface of the water shall
be recorded. The level of water shall be recorded again at subsequent intervals of
24hours over a period of 7 days. The total drop in surface level over a period of
seven days shall be taken as an indication of the water tightness of the tank. The Engineer
shall decide on the actual permissible rate of this drop in the surface level, taking into
consideration whether the tanks are open or closed and the corresponding effect it has on
evaporation losses. Backfilling shall be withheld till the tanks are tested if directed by the
Costs of Tests:
The entire cost of tests as specified, in clause above shall be borne by the Contractor.
Unsatisfactory Test:
If the results of any test prove unsatisfactory, the Contractor shall remove and rebuild the
member or members involved or carry out such other remedial measures as maybe
required by the Engineer or his representative. The Contractor shall bear the cost of so
doing, unless the failure of the member or members to fulfil the test condition is solely
due to faulty design.
The procedure for placing of concrete shall be as follows:
a. Preparation before placing of concrete shall be as given below.
(i) Engineer's Approval of Equipment & Method:
Before any concrete is placed, the entire placing programmed, consisting of equipment,
layout, proposed procedure and methods shall be submitted to the Engineer for approval
if so demanded by the Engineer and no concrete shall be placed until the Engineer's
approval has been received.
(ii) Hardened concrete and foreign materials should be removed from the inner
surface of the conveying equipment’s.
(iii) Form work shall have been completed; snow, ice and water shall have been
removed. Reinforcement shall have been secured in place, expansion joint material,
anchors and other embedded items shall have been positioned and the entire preparation
shall have been approved.
(iv) No concrete shall be placed on watered surface.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
(v) Rain or Wash Water: -
No concrete shall be placed in wet weather and any concrete that has been washed by
heavy rains shall be entirely removed, if there is any sign of cement and sand having been
washed away from the concrete mixtures. To guard against damage which may be caused
by heavy rains, the works shall be covered with gunny bags immediately after the concrete
has been placed in position on the surface of the newly placed concrete and shall be
removed by approved means and no further concrete shall be placed thereon.
b. Time interval between mixing and placing: -
Concrete shall be placed in the forms within 30 (thirty) minutes as rapidly as practicable,
after addition of water to cement and aggregate, unless otherwise authorized by the
c. Concrete placing by manual labour: -
Except when otherwise approved by the Engineer, concrete shall be placed in the
shuttering by shovels or other approved implements and shall not be dropped from a
height or handled in a manner, which will cause segregation. Accumulation of set concrete
shall be avoided. Concrete shall be placed directly in its permanent position and shall not
be worked along the shuttering to that position.
d. Avoiding segregation:
Concrete shall, in all cases, be deposited as nearly as practicable directly in its final
position and shall not be caused to flow in a manner, which will cause segregation, lossof
materials and impair its strength. For locations where direct placement is not possible,
and in narrow forms, the Contractor shall provide suitable drop chutes and "Elephant
Trunks" to confine the concrete in movement.
e. Concrete placing by Mechanical Equipment:
The following specification shall apply where placing of concrete by use of mechanical
equipment is specifically called for while inviting bids or is warranted considering the
nature of the work involved.
The control of placing shall begin at the mixer discharge. Concrete shall be discharged by
the vertical drop into the middle of the bucket or hopper and this principle of a vertical
discharge of concrete shall be adhered to throughout all stages of delivery untilthe
concrete comes to rest in the structures.
f. Type of Buckets:
Central bottom dump buckets of a type that provides for positive regulation of the amount
and rate of deposit of concrete in all dumping positions shall be employed.
g. Operation of Bucket:
In placing concrete in large open areas, the bucket shall be spotted directly over the
position designated and then lowered for dumping. The open bucket shall just clear
theconcrete already in place and the height of drop shall not exceed 1.00 M. The bucket
shall be opened slowly to avoid high vertical bounce. Dumping of buckets on the swing,
or in any manner which results in segregation of ingredients or disturbances of previously
placed concrete will not be permitted.
h. Placement in Restricted Forms:
Concrete placed in restricted forms by borrows, buggies, cars, short chutes or hand
shovelling shall be subject to the requirement for vertical delivery of limited height to
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
avoid segregation and shall be deposited as nearly as practicable in its final position to
avoid segregation due to rehandling or falling.
Where it is necessary to use transfer chutes between mixer, containers or hoppers, and
point of deposit in the forms, specific approval of the Engineer must be obtained as regards
the type, length, slopes, baffles and vertical terminals. Concrete shall not be permitted to
fall from the end of the chutes or tube more than 1.00 M. Chutes, when approved for use
shall have slope not flatter than 1to 3 and not steeper than 1 to
j. Placing by Pumping:
Concrete may be conveyed and placed by mechanically operated pressure equipment only
with the written permission of the Engineer. Water cement ratio may not be increased
above that for the same class of concrete placed by bucket and the slump shall be held to the
minimum necessary for conveying concrete by this method.
k. Bonding Mortar:
Immediately before concrete placement begins, prepared surfaces except formwork,
which will be in contact with the concrete to be placed, shall be covered with a bonding
mortar as specified.
l. Thickness of Layers:
Concrete shall be placed in successive horizontal layers ranging in thickness from
mm. as directed by the Engineer the bucket loads, or other units of deposit shall be potted
progressively along the face of the layer with such overlap as will facilitate spreading the
layer to uniform depth and texture with a minimum of shoveling. Any tendency to
segregation shall be corrected by shoveling stones into mortar then mortar on the stones.
Such a condition shall be corrected by redesign of mix or other means, as directed by the
m. Bedding of layers:
Bedding planes shall be approximately horizontal unless otherwise instructed.
Concrete shall be compacted with approved mechanical vibrating equipment until the
concrete has been consolidated to the maximum practicable density, and is free of pockets
of coarse aggregate, and fits tightly against all form surfaces and embedded materials.
TYPE OF VIBRATORS:
(i) Vibrators shall be the internal or immersion high frequency type, with speed of
not less than 6000 revolutions per minute when immersed in the concrete. Vibrators shall
be used in sufficient number of units and power of each unit shall be adequate to properly
consolidate the concrete.
(ii) Use of Vibrators: -
Vibrators shall be inserted in a vertical position at intervals of about 600 mm depending
upon the mix; the equipment used, and continued experience on the job. Vibrators shall
be withdrawn slowly. In no case shall vibrators be used to transport concrete inside the
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
(iii) Successive Batches: -
In placing concrete in layers, which are advancing horizontally as the work progresses,
great care shall be exercised to ensure adequate vibration, blending of the concrete
between the succeeding batches.
(iv) Vibrator Penetration of under layer: -
The vibrator shall penetrate the layer being placed and also penetrate the layer below
while under layer is still plastic to ensure good bond and homogeneity between the two
layers and prevent the formation of cold joints.
(v) Vibrating Against Reinforcement: -
Care shall be taken to prevent contact of vibrators against reinforcement steel. Vibrators
shall not be allowed to come in contact with reinforcement steel after start of initial set.
Vibrators shall not be allowed to come in contact with forms of finished surface.
(vi) Use of form attached Vibrators:
The use of form attached Vibrators shall be used only with specific authorization of the
(vii) Use of Surface Vibrators:
The use of surface vibrators will not be permitted under ordinary conditions. However,
for thin slabs such as highways, runways, and similar construction surface vibration by
specially designed vibrators may be permitted, upon the approval of the Engineer.
(viii) Stone pockets and Mortar Poundage’s:
The formation of stone pockets and mortar poundage in corners and against form face
shall not be permitted. If these occur, they shall be dug out, reformed and refilled to
sufficient depth and shape for the rough blending, as directed by Engineer.
CONSTRUCTION JOINTS AND KEYS:
Concrete shall be placed continuously unless otherwise specified.
If stopping of concreting becomes unavoidable anywhere, the construction joint shall be
made, where the work is stopped, concrete that is in the process of setting shall not be
disturbed or shaken by traffic either on the concrete itself or upon the shuttering.
Horizontal and vertical construction joints and bonding keys shall be located and shall
conform in detail to the requirements of the plans unless and otherwise directed by the
Engineer. Where not described, the joint shall be in accordance with the following:
(a) Column joint:
In a column, the joint shall be formed 75 mm. below his lowest soffit of the beams joining
(b) Beam and Slab joint:
Concrete in a beam shall be placed throughout without a joint but, if the provision of a
joint is unavoidable, the joint shall be vertical and at the middle of the span. A joint in a
slab shall be vertical and parallel to the principal reinforcement. Where it is unavoidable,
the joint at right angles to the principal reinforcement, shall be vertical and at the middle
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
CURING, PROTECTING, REPAIRING AND FINISHING:
All concrete shall be cured by keeping it damp for the period required for complete
hydration and hardening to take place.
Certain types of finish, or preparation for overlaying, concreting must be done at certain
stages of the process and special treatment may be required for specific concrete surface
(i) Curing with water:
Fresh concrete shall be kept continuously wet for a minimum period of at least 21 days
since lapse of 24 hours after laying concrete. Quantity of water supplied shall be controlled
so as to prevent the erosion of freshly placed concrete.
(ii) Continuous Spraying:
Curing shall be assured by use of an ample water supply under pressure in pipes, with all
necessary appliances of hose (sprinklers to be used), unless otherwise specified or
approved by the Engineer.
(iii) Alternate Curing Methods:
Whenever, in the judgement of the Engineer, it may be necessary, the continuous spray
method may be omitted and a covering of sand, or other approved mulching such as
wet gunny bags, which will prevent loss of moisture from the concrete, may be used. No
type of covering will be approved which should strain or damage the concrete during or
after curing period. Covering shall be kept continuously wet during the curing period.
(iv) Curing compounds:
Surface coating type-curing compounds shall be used only by special permission of and
under the direction of the Engineer. Curing compounds shall be colorless / pigmented,
liquid type, conforming to approved specifications. No curing compound shall be used on
surfaces where future blending with concrete or painting is specified.
For curing of concrete in pavement, sidewalks, floors, flat roofs or other level surfaces,
the ponding method of curing is preferred. The method of containing the ponded water
shall be approved by the Engineer. Special attention shall be given to edges and corners
of the slabs to ensure proper protection to these areas. The ponded areas shall be kept
continuously filled with water.
(vi) Curing Equipment:
All equipment and materials required for curing shall be on hand and ready for the use
before concrete is placed.
(vii) Protection of Fresh Concrete:
Fresh concrete shall be protected by leaving forms in place for an ample period as
specified later in this specification. Newly placed concrete shall be protected by approved
means from rain, sun and winds. Steps as approved by the Engineer shall also be taken to
protect immature concrete from damage by debris, excessive loading, vibration, abrasion
or other materials etc. that may impair the strength and/or durability of the concrete.
Workmen shall be warned against and prevented from disturbing green concrete during its
setting period. If it is necessary that workmen enter the area of freshly placed concrete, the
Engineer may require that bridges be placed over the area.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
(viii) Repair and Replacement of Unsatisfactory Concrete:
Immediately after the shuttering is removed, the surface of concrete shall be very carefully
one over and holes noticed shall be filled up and made good with mortar composed of one
part of cement to one part of sand after removing any loose stones adhering to the concrete.
Concrete surfaces shall be finished as described under the particular items of work.
Superficial honeycombed surfaces shall be made good immediately after removal of
shuttering, in presence of Architect's representative and superficial water and air holes
shall be filled in. Unless otherwise instructed by the Engineer, the surface of the exposed
concrete placed against shuttering shall be rubbed down immediately on removal of
shuttering to remove fins or other irregularities.
Unsatisfactory concrete shall be cut out and replaced with new concrete, as soon as
practicable after removal of forms. Anchors, tees, or dovetail slots shall be provided
wherever necessary to attach the new material securely in place. Surface of prepared voids
shall be wetted for 24 hours immediately before the patching material is placed. Use of
an epoxy for blending fresh concrete used for repairs will be permitted upon written
approval of the Engineer. Epoxies shall be applied in strict accordance with the
instructions of the manufacturer.
FINISHING - GENERAL:
The specification is intended to cover the treatment of concrete surfaces of all structures.
Area requiring special finish not covered by this specification may be clearly indicated on
the drawings and specifications will be furnished.
(a) Finish for Formed Surfaces:
The type of finish for formed concrete surfaces shall be as follows, unless otherwise
specified by the Engineer:
(i) Cement plaster finish:
The concrete shall be properly roughened immediately after the shuttering is removed,
taking care to remove the laitance completely without disturbing concrete. The
roughening shall be done by hacking. Before the surface is plastered, it shall be cleaned
and wetted so as to give good bond between concrete and plaster.
(ii) For surface against which backfill or concrete is to be placed, `no’ treatment is
required except tie holes & repair of defective areas shall be patched with cement mortar.
(iii) For surfaces below grade, which will receive waterproofing treatment, the
concrete shall be free of surface irregularities, which would interfere with proper
application of the waterproofing material, which may be specified for use.
(iv) Surfaces which will be exposed when the structure is in service shall receive no
special finish except repair of damaged or defective concrete, removal of fins and abrupt
irregularities, filling of holes left by form ties and rods, and cleanup of loose or adhering
Finishing of exposed concrete surface shall conform to the following.
Smooth form finish:
The form facing material shall produce a smooth, hard, uniform texture on the concrete;
it may be plywood or other approved material capable of producing the desired finish. All
ties, burns and fins are to be removed. Mix one part of Portland cement and one-part fine
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
sand with sufficient water to produce a stiff mortar. The mortar after drying shall match
the rest of the surface in colour. Before application of mortar, concrete surface is to be
dampened. Mortar is to be applied by firm rubber float or trowel, filling all surface voids.
Compressing mortar into voids by using carborundum stone shall be continued till
uniform color and texture is produced. If the mortar surface dries too rapidly to permit
proper compaction and finishing, apply a small amount of water with a sprayer. Quoted
rate of exposed shuttering shall be inclusive of this treatment.
(c) Finish for Unformed Surfaces:
Surfaces which will be exposed to the weather and which would normally be a specified
level, a horizontal surface or shows the slope required, the tops of narrow surfaces, such
as stair treads, walls, curbs and parapets shall be sloped approximately 10mm in 300mm
width, broader surfaces such as walkways, roads, parking areas and platforms shall be
sloped about 1 in 50. Surfaces that will be covered by backfill or concrete, sub-floors to
be covered with concrete topping, terrazzo or quarry tile, and similar surfaces shall be
smooth screened and levelled to produce even surfaces. Surfaces which will not be
covered by backfill, concrete or tile toppings such as outside desks, floors of galleries and
sumps, parapet, gutters, sidewalks and slabs shall be consolidated, screened and flattened.
Flattening may be done with hand and started as soon as the screened has attained a
stiffness to permit finishing operations, and shall be the minimum required to produce
surface uniform in texture and free from screened marks or other imperfections. Joints
and edges shall be tooled as called for on the drawings or as directed by the Engineer.
(d) Protection:
All concrete shall be protected against damage until final acceptance by the Architect or
his representative.
CONCRETING IN HOT WEATHER:
Concreting in extreme hot weather shall be avoided. Special care shall be exercised and
measure undertaken when temperature on site exceeds 105 F or 40 C. Such measures
Provision of a shade for coarse aggregate so that the same do not absorb heat from
the directly indenting rays of sun.
Continuously wetting coarse aggregates to keep their temperature down, fog sprays.
Providing a shade for the mixing machine.
Depositing the concrete from the machine as quickly as possible.
Adjusting water proportions throughout the day to account for water in the wet
aggregate, giving desired strength and workability.
(Covering the deposited concrete by a membrane as soon after the placing as
possible without damaging the fresh concrete.
Wet gunny bags shall be laid immediately after two hours of concreting on the
top surfaces of slab and shall be kept wet for curing period.
Use of retarder (2% of Calcium Chloride).
Use of Zero Heat Portland Cement or even the Portland Pozzolana Cement.
Use of higher water cement ratio.
Keep moist, the formwork continuously for the period of 2 hours at least.
On such days of hot weather, concreting records shall be kept of the atmospheric
temperature and corresponding temperatures of concrete discharged from the mixing
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
CURING OF DIFFERENT ITEMS:
For all the time during construction, curing shall be carried out especially from
AM to 7.00 PM even on holidays with proper manpower, necessary pumps and pipe lines,
connections, etc.
Exposed surfaces of concrete shall be kept continuously in a damp or wet condition by
ponding or by covering with a layer of sacking, canvas, hessian or similar material and
kept constantly wet for at least seven days from the date of placing concrete in case of
OPC and at least 10 days where mineral admixtures or blended cements are used. The
period of curing shall not be less than 10 days for concrete exposed to dry and hot weather
conditions. In the case of concrete where mineral admixtures or blended cements are used
it is recommended that above minimum periods may be extended to 14 days. For the
concretes containing PPC or Portland Slag Cements, period of curing may be increased.
The form work shall conform to the shape, lines and dimensions as shown on the drawings
and be so constructed as to remain sufficiently rigid during the placing and compacting of
the concrete and shall be sufficiently tight to prevent loss of slurry.
(a) All forms shall be checked frequently during the concreting operations and until
removed so that they may be driven up if any settlement occurs.
The design, fabrication and erection of formwork are solely the responsibility of the
Contractor. The formwork should be safe and stable to withstand dead load of concrete,
men etc. Further, the form should yield security to the structure or its members.
The selection of materials suitable for formwork shall be based on economy and
consistency with safety and quality required in the finished work. Formwork shall be of
timber, plywood, steel or any other materials as approved by Architect/Engineer-in-
Charge whose decision in this respect shall be final. Props and shores shall be of steel,
timber posts, bullies or any other material as approved by Architects.
(c) Chamfer strips shall be placed in corner of forms to produce beveled edges on
permanent exposed surface, if specified.
(d) Temporary openings shall be provided at the base of column forms and wall
forms and at other points where necessary to facilitate cleaning and observation
immediately before concrete is placed.
Care should be taken to see that the formwork is perfectly cleaned and two coats of mould
oil or any other approved material is applied before placing the concrete. Such coating
shall be insoluble in water, non-staining and non-injuries to the concrete. It shall not
become flaky or be removed by rain or wash water. Block boards or equivalent shall be
used for shuttering columns, beams, etc. and steel sheets for slab shuttering will be
(f) Chamfers and fillets:
All concrete and angles exposed in the finished structure shall be formed with moldings
to form chamfers of fillets on the finished concrete. The standard dimensions of chamfers
and fillets, unless otherwise specified, shall be 20 mm. Care should be exercised to ensure
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
accurate moldings. The diagonal face of the molding shall be placed or surfaced to the
same textures as the forms to which it is attached.
(g) Vertical construction joint chamfers:
Vertical construction joints on faces, which will be exposed at the completion of the
project, shall be chamfered as above except where not permitted by the Engineer for
structural or other reasons.
(h) Reuse of Forms:
Before reuse, all forms shall be thoroughly scraped, cleaned, joints examined and when
necessary, repaired and the inside retreated to prevent adhesion, to the satisfaction of the
Engineer. The Contractor shall equip himself with enough shuttering to complete the job
in the stipulated time.
(i) The contractor shall record on the drawing or a special register the date upon
which the concrete is placed in each part of the work and the date on which the shuttering
in removed there from. Striking of forms in the case of sides of beams, columns and slabs
can be carried out after 24 hours of concreting. The striking of forms shall be done as para
2.12.4. Striking shall be done with utmost care without shock or vibration by gently easing
the wedges. If, after removing the formwork, it is found that the timber is embedded in the
concrete, it has to be cut out and made good with fine concrete. Due care shall be given
to the provision of correct form work for holes and openings in the slabs, inserts,
grounding cables, conduits and pipe sleeves, foundation or anchor bolts etc. as per
approved drawings or as directed by the Engineer.
CLEANING AND TREATMENT OF FORMS:
The forms shall be carefully examined to see that they are vertical and horizontal and the
joints are properly closed. If forms are to be reused, they should be carefully examined
before such reuse, properly aligned and open joints shall be repaired and coated with crude
oil. The centering planks for columns shall be joined together and provided with threaded
bolts and nuts.
The centering and props for the various members shall be fixed in a workman like manner
to be approved by the Engineer-in-Charge. They shall be of such size as the Engineer-in-
Charge thinks fit and proper. The centering shall be removed only after the permission
has been obtained from the Engineer-in-Charge. Props shall be supported on wedges
placed on planks and the planks shall be 25 mm thick.
All rubbish, particularly chippings, shavings and saw dust shall be removed from the
interior of the forms before the concrete is placed and the form work in contact with the
concrete shall be cleaned and thoroughly wetted or treated with an approved composition.
Care shall be taken that such approved composition is kept out of contact with the
(a) In columns of any forms where access to the interior is not available otherwise,
a sufficient area of one side shall be left loose so that it may be removed for cleaning out
all chips, dirt, sawdust and other extra materials.
(b) Where the shoring bores on the ground, the Contractor shall spread the load
from shores by suitable brick platforms in order to prevent settlement.
ARCHITECTURAL EXPOSED REINFORCED CEMENT CONCRETE:
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Generally, specification for reinforced cement concrete work shall also apply to
this type of work and additional specification set-forth below.
Cement used for such work shall be of a uniform colour and obtained from one
source of manufacture.
a) Fine Aggregates:
Color being an important consideration for exposed concrete, color of sand used shall
also be uniform throughout the entire construction. Preferably total quantity required for
the work shall be collected and well mixed together to a uniform shade.
b) Coarse Aggregate:
The color of the aggregate shall be maintained the same throughout. Unless otherwise
specified, exposed concrete in walls, fences and parapets which are no-load bearing and
are less than 120 mm. in thickness the maximum size of coarse aggregate shall be limited
to 12 mm for which nothing extra shall be admissible. Flat and flaky pieces shall not be
(ii) Reinforcement & Cover of the Concrete:
Correct placing of the reinforcement with proper cover is important in all exposed
work to avoid discoloration by rusting. The minimum cover specified in the Specification
shall be maintained throughout.
Concrete blocks or spacers shall be sparingly used at exposed surfaces. When used, such
blocks shall preferably be cast on vibrating tables or in some other similar manner so that
it may match the concrete surface in texture and color. Cover blocks of materials other
than precast blocks shall not be allowed to be used.
(i) Construction of shuttering:
All centering and framework shall be rigid and of robust construction. All vertical props
shall be cut square at ends and shall rest on double wedges, placed on continuous horizontal
runners on firm natural soil. Resting of props or runners on made up soil shall not be
permitted on any account. All members of the formwork shall be closely fixed without
any gap between them so as to safeguard against any settlement or displacement of
shuttering at the time of concreting.
i) Timber Shuttering:
Formwork for exposed work shall be of seasoned wrought hard wood timber planks free
from loose knots. The planks shall be 50 mm thick, 100 to 125 mm wide with tongue and
groove joints, assembled to a pattern approved by the Architect. The formwork shall be
so constructed, braced, and stayed as to remain absolutely rigid and true during and after
concreting. The boards shall be planed to a suitable thickness in order that the surface
against the concrete shall not be broken at joints between boards. Chamfers, grooves,
drips moldings, beveled edges etc. shall be made in the form itself to the size, profiles and
details called for on the drawings.
ii) Plywood Shuttering:
The contractor shall provide shuttering quality plywood not less than 12 mm thickness as
per IS.4990 (type-I) of approved make or equivalent approved by the Architect in place of
timber plank shuttering mentioned above for such location as called for by the Architects.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The joints in plywood shuttering shall be located as directed by the Architects. Shuttering,
centering and form work for all exposed concrete work like exposed columns, beams,
ribs, slabs, chajjas, facia, walls etc. shall be of such finish and rigidity as to produce all
faces fair and smooth, true to line level and plumb. No rendering or touching shall be
permitted on these faces.
iii) Steel shuttering:
Steel shuttering for exposed concrete work shall be made of shuttering plates of standard
sizes and to suit the pattern of exposed concrete indicated in Architect's drawings. The
shutter plates used will be made of steel sheets strengthened at the edges and in middle
to prevent sagging or any deflection and concrete deformity or dents and should fit with
each other properly without any space or groove being left between adjacent plates to
avoid and leakage of concrete slurry. If any concrete projects out between plates this will
be neatly cut away.
The contractor shall be required to produce details of working showing the general
construction of formwork and panels with details such as nail position and holes for
supports that may be required; nail heads shall be positioned as instructed by the
Architects. Grooves and chamfers shall be formed as shown on the drawings without any
Any holes for the supports, which the contractor may need, shall be permitted only if
approved by the Architects. All such holes shall be subsequently filled in carefully as to
match with the other surface. Walls, columns etc. shall generally be cast to the full height
in one operation and the formwork shall be provided accordingly. If permitted by the
Architects, these may be completed in two or more heights when the formwork shall be
carefully and correctly raised for further height so as to ensure a neat joint without
disturbing the pattern. Any groove desired by the Architect at the joint shall be provided
by the Contractor at no extra cost.
(ii) Coating for shuttering:
Shuttering oil, colorless and emulsifiable in water shall be used for oiling the woodwork,
when only a thin film shall be neatly applied avoiding collection at one place. Any mark
left by the shuttering oil shall be washed clean.
(iii) Measurements and proportioning of concrete materials:
This shall be as laid down generally for R.C.C. work. In no case extra dust or sand or
additional water shall be allowed with the intention of getting better finish, which shall
only be obtained by erecting centering as specified above and proper vibrating of the mix
after placing. In no case, the slump limit, specified in the Specification shall be exceeded.
(iv) Preparation for placing concrete:
Special care is essential to see that all saw dust, chips, nails or any foreign material is
washed out or otherwise removed from the shuttering.
(v) Mechanical vibration:
All concrete for exposed concrete work shall be vibrated, using needle vibrators -
30/32mm. Surface or trough vibrators may be permitted to be used for thin slabs. External
vibrators for walls may be allowed but this shall be done carefully to safeguard the
displacement of the shuttering. Vibrators shall only be operated by skilled labour; over or
under vibration shall not be permitted. Any spillage, or leakage, which is unavoidable,
and which flows down the exposed concrete surfaces, shall be immediately washed away
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
with clean water and brush. Exposed concrete members shall be finished to desired surface
while the concrete is still green.
(vi) Curing and protection of concrete:
Curing will be done with clean water, so as not to discolor the concrete. All exposed
concrete work shall be properly protected by Alkadiene film, gunny bags, wooden boards
etc. so the surfaces and edges are not damaged or discolored till the entire construction is
handed over, at no extra cost. All such damages shall be set right or replaced by the
contractor at his own cost; the contractor is deemed to have considered this in quoting
(i) Removal of shuttering:
Striking and removing of formwork for exposed concrete shall be done very carefully
without damaging the surface or edges. All such damages shall be set right or replaced by
the contractor as his own cost.
(ii) Finishing:
Finishing of exposed concrete surface shall be as specified.
Exposed concrete surface shall on no account be permitted to any sort of repairs or
patching after striking the formwork. In the event of any portion not coming up to
standard, this shall be taken down by the contractor at no extra cost. Decision of the
Architects as to the rejection of such work shall be final and binding on the contractor.
STRIPPING TIME:
In normal circumstances (generally where temperatures are above 20 C) and where
Ordinary Portland Cement is used, forms may generally be removed after expiry of
following periods:
Type of Formwork Minimum Period
Before Striking Formwork
(a) Vertical formwork to columns, walls, beams 16 - 24 h
(b) Soffit formwork to slabs (Props to be refixed immediately 3 days
after removal of formwork
(c) Soffit formwork to beams (props to be refixed immediately 7 days
after removal of formwork
(d) Props to slabs:
Spanning up to 4.5 m. 7 days
Spanning over 4.5 m. 14 days
(e) Props to beams and arches:
Spanning up to 6 m 14 days
Spanning over 6 m 21 days
The number of props left under, their sizes, load and disposition shall be such as to be able
to safely carry the full dead of the slab, beam or arch as the case may be together with live
load likely to occur during curing or further construction.
However, this period may be increased or decreased at the discretion of Architects. In
case when the cube strengths at seven days are found to be low or in the cases when other
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
cements are used, the curing period and stripping time for forms and removal of props
may have to be extended. This shall be decided by the Architect and the contractor shall
not claim any extra costs for such increased periods of curing and stripping of forms etc.
Special care shall be taken while removing the cantering of cantilever slab, canopies,
portal frames, folded plates construction etc. Stripping time for such special structure as
shell roofs etc. shall be determined from tests of stripping cubes taken especially for the
purpose. These cubes shall give strength of 75% of the28 days strength. For rapid
hardening cement 3/7 of the above period will be sufficient in all cases except vertical
sides of slabs, beams and columns, which should be retained for 24 hours.
The props left under shall mean that the form work for slabs and beams soffits at
3days and 7 days respectively can be removed only if the same can be done without
disturbing the props which are required to support the slab or beam completely. In normal
cases this will mean that period for removal of formwork for slabs and beam soffits will
be 7 days and 14 days respectively.
PROCEDURE WHEN REMOVING THE FORMWORK:
All formwork shall be removed without such shock or vibration as would damage
the reinforced concrete. Before the soffit and struts are removed, the concrete surface
shall be exposed, where necessary, in order to ascertain that the concrete has sufficiently
hardened. Proper precautions shall be taken to allow for the decrease in the rate of
hardening that occurs with all cements in the cold weather.
It is generally desirable to give forms an upward camber to ensure that the beams do not
have a sag when they have taken up their deflection, but this should not be done unless
allowed for in the design calculation of the beams.
The Contractor shall, before putting any concrete in any unit, check all dimensions
according to the drawing governing the accuracy of the dimension of all the units and the
necessary formwork shall be approved by the Engineer-in-charge and if any error is found
in dimensions, the Engineer-in-charge will not allow in any case more than the tolerances
specified as below and any unit which does not comply will be liable to rejection at the
discretion the Engineer-in-charge.
The formwork shall be designed and constructed to the shapes, lines and dimensions
shown on the drawings within the tolerances as given below. The tolerances in footings
apply to concrete dimensions only and no to positioning of vertical reinforcing steel or
(a) Deviation from specified dimensions of cross - 6 mm
sections of columns and beams +12 mm
(b) Deviation from dimensions of footings:
Dimensions in plan -12 mm
Eccentricity 0.2 times the width of the footing in the
direction of deviation but not more than
Thickness +0.05 times the specified thickness
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
TRANSPORTING AND PLACING OF CONCRETE:
The concrete shall be mixed in quantities required for immediate use and shall be
deposited on the sub-grade/sub-base to the required depth and width of the pavement
section in successive batches and in continuous operation without the use of intermediate
form between the joints. Care shall be taken to see that no segregation of materials results
whilst the concrete is being transported from the mixer to the place where it is to be
deposited. The spreading shall be as uniform as possible to avoid re-handling of concrete.
Where, however a certain amount of redistribution is necessary, it shall be done with
shovels and not with the rakes.
While being placed the concrete should be rodded with suitable tools so that formation of
voids or honeycomb pockets is prevented. The concrete shall be well placed and tamped
against the forms and along all joints.
COMPACTION OF FLOOR CONCRETE:
The concrete at the side of the forms and between the reinforcements at joints and at
corners to be compacted with internal vibrator (needle vibrators) to avoid honeycombing
and to get perfect compaction at these locations.
The vibrating screed shall rest on side forms, and it shall be lowered vertically on the
concrete surface, (evenly spread to an appropriate level above the base) to provide the
required surcharge for compaction; allowed to remain in position for few seconds until
compaction is completed, then lifted vertically and lowered on to the adjacent strip of
un- compacted concrete. The amplitude of vibration of the screed shall not be less than
1.5 mm and speed of travel not more than 0.60 m per minute. The screed shall again be
taken slowly over the surface, sliding with its axis slightly fitted away from the direction
of sliding and operation repeated until the required dense, close knit textured finish surface
Notes: Precautionary measures to be taken before starting concrete floor.
(a) The working of vibrators shall be regularly checked, and standbys shall always
be maintained for emergency use.
(b) The segregated particles of coarse aggregates which collect in front of the tamper
or screed shall be thrown outside the forms. Under no circumstances shall such segregated
particles be carried forward and pushed on to the base in front of the mass.
CONCRETE FLOOR FINISHING:
Immediately after completing the compaction by screed vibrator and excess water has
disappeared but while the concrete is still plastic, the floor top surface shall be tested for
true-ness with a 3.65 M long straight edge (Aluminum Box Section).
The straight edge shall be held in successive positions parallel to the guide channels in
contact with top surface of floor laid and the whole area gone over from the one side of
the floor to the other. Advance along the floor shall be in successive stages of not more
than one half length of straight edge. Any area of the depressions found shall be scooped
40 to 50 mm filled immediately with freshly mixed concrete, struck, compacted and
refinished. High areas shall be cut down and refinished. The straight edging and re-floating
shall continue until the entire surface is found to be free from observable departures from
straight edge and top surface has the required levelled surface.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The floor top surface shall be re-tested for trueness before the concrete begins to set with
3.60 M long master straight edge (Aluminum Box Patti). Any irregularity in surface to be
PREPARATION OF SURFACE AND USE OF FLOOR HARDNER (FIRST DRY
Following types of floor hardeners are used for increasing strength of concrete floors.
I. Ironize based
II. Silica / Quartz based
III. Carborundum based
The quantity of floor hardener shall be used as specified by the Consultants (or as per
manufacturers specification) and according to light / medium / heavy-duty floor as
Scrap the concrete deposited, if any, on the top of side form during concreting. As soon
as concrete is firm enough to support the weight of workmen and their equipment and no
water is observed on surface; apply first shake of hardener evenly using 2/3 of total mix
e.g. 2/3 of 7.5 Kg. /Smt. Treat areas adjacent to walls and columns first, spread the
materials evenly by sprinkling at right angles in two passes close to floor level. Do not
broadcast (spread) the hardener from a station position but use a wooden scraper to spread
the hardener. Alternatively, a mechanical spreader can be used for better application.
FLOATING: (With Finishing Machine Having DISC)
Power float the shake application promptly, work near wall, columns and door area first.
Avoid excessive floating but ensure that the shake application is completely wetted and
incorporated in to the base slab.
C-4 Form work for “off the form exposed concrete surfaces having board marked
pattern and time texture. “
Relevant specification of form work above (Given in C-5 above) shall be made
Concrete surface, which are to be “form finish shall be cast in an approved form work and
shall be free from honey combined, fine, projections, and air holes. All external angles to
form finish concrete surfaces shall be chaffed if and as directed. All interesting flush
surfaces, surfaces horizontally or vertically between columns and beams of other
structural members shall be separated by grooves if and as directed by the Engineer- in-
The pattern of the form boards, the disposition of construction joints and lifts, and the
incorporation of recessed or raised joints shall be carefully studied by the contractor for
its proper implementation.
The contractor shall submit shuttering drawings and details of pattern and the method of
forming joints in the exposed (form finish) concrete to the Engineer-in-charge. For his
approval and all changes and modification specified by the letter shall be appropriated by
the former and final approval whereof obtained from the Engineer-in- charge.
No work of form finished exposed concrete shall be carried out until the contractor has
produced acceptable sample of shuttering and concrete to the approval of the Engineer-
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Utmost care shall be then be constantly exercised by the contractor in the:
I. Design workmanships and fixing of form work.
II. Control of concrete ingredients, mixing and placing.
III. Adequate technical supervision of all process involved.
IV. Listed below are some form work specifications, for form finished exposed concrete
tube used on site as directed by the Engineer-in-charge.
V. Smooth Board Surfaces:
VI. The smooth board marked surfaces are produced by new dressed tongued and
grooved boards of uniform thickness of not less than 45 mm. These boards should be
brought and dressed on both faces as well as on all side.
VII. Rough Board Surfaces:
VIII. A rough texture is obtained by the use of new sawn boards with dressed square
Steel Mould Surface:
Steel moulds must be rigid enough are perfectly plane and clean. They must be painted
with a protective point and absolutely free from rust or have a special section at their edges
to prevent cement leakage and produce a water tight joint.
This type of form work is to be entrusted to a skilled and specialized manufacture who
has produce satisfactorily similar form work and who must be approved by the Engineer-
In all type of form work to form finished exposed concrete. Only non-staining mould oil
supplied by an approved manufacturer will be used.
The repetitive usages of the same form work to cast form finished exposed concrete shall
be as decided by the Engineer-in-charge and no case form work not guaranteed to produce
the required form finish to the satisfaction of the Engineer-in-charge shall be used.
The exposed concrete shall have uniform finish. The finish of the concrete when
shuttering and form work is removed will generally be without blemish and will be such
as will not require touch up. Slight touch up a small work or two, if necessary, shall
immediately on removal of form work by 1.1 proportions. This shall be carried out expertly on
removal of form work with entire surface.
C-5 Fabricating placing reinforcement in position: Fabrication:
The reinforcement bars shall be out to be required length including necessary bends hooks,
overlaps, etc. as shown on the plan or as directed by the Engineer-in-charge and shall conform to
I.S. 2502-1963 or as revised from time to time. Details of length and bending diagrams shall be
got approved from the Engineer-in-charge.
Placing and Binding:
All reinforcement shall be accurately placed in position with spacing as shown in the drawing
and firmly held so during placing and setting of concrete. The bars shall betide diagonally both
ways, at all inter-sections with M.S. binding wire of 1.22mm or 1.63mm dia (16 or 18 gauge).
Spot welding instead of tying brass by wires will be permitted by the Engineer-in- charge, if
required. Spacing of bars shall be maintained by means of stays, blocks, tiles, spacers, hangers
or other approved supports or devices at sufficiently close intervals.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
All bars protruding from concrete to which other bars are to be spliced and which are likely to be
exposed for indefinite period shall be protected from rusting by thin coat of cement wash.
Welding (instead of overlaps) by gas or electricity will be permitted under suitable conditions
and with suitable safe-guards. In case such permission is granted, relevant Indian Standards for
welding of steel reinforcement bars including carrying out necessary tests shall be followed.
No concrete shall be deposited unless the Engineer-in-charge has inspected the reinforcement
work, recorded measurements, and given permission to place the concrete. After the approval of
the reinforcement by the Engineer-in-charge, it will be the contractor’s responsibility to see that
reinforcement is not disturbed from its position till the concreting is completed.
C-6 Fixing Expansion Joints:
The expansion joints shall be provided in R.C.C. structural members:
a. For the joints between twin internal beams of RCC frame structure, copper strip
of 1.5mm thickness and width and shape as shown in the detailed drawing shall be placed near the
bottom in the first beam such that one Kg. of the specified width is embedded in thebeam and
“U” fold (of 80mm depth unless otherwise specified) will come in the joint.
The “U” shape gap of the copper strip shall be filled with poured bituminous joint filler and
nearly finished on top. Before casting of the jointing member pre-molded bitumen joint filler or
required thickness shall be placed in position as directed and concrete then cast, embedding the
b. The joint between the twin terrace beam shall be prepared in a manner similar
to (1) above except that the raised concrete edge shall be provided and the copper plate shall be
fixed in the raised edge as directed. It shall be covered by lead flushing 1.5mm thick fixed
to one seat with copper screws to the wood blocks embedded in the concrete as shown in the
detailed drawing.
For the joints between twin internal or external columns, white casting the first column, one leg
of each of the copper strips of 1.5mm thickness shall be embedded into the column and “U” fold
will come in the joints nearer the exterior faces of the column. The copper strips shall be fixed
with hold fast of copper rod as shown in the detailed drawing. Before casting the second
column pre-molded bituminous joint filler shall be placed against the face of the first column all
along between the two steps as directed by the Engineer-in-charge.
C-7 Structural steel work
All steel shall be tested and Indian approved manufacturers. One sample would with exact
dimensions of all the members of the truss shall be got approved by the Engineer before erecting
and fixing the same. Welding shall be properly done to the exact length and shall be got approved
by the Engineer and welding shall conform to IS – 816-1956 or as revised from time to time.
This items including providing, supplying, fabricating and erecting the same in proper position.
The entire steel surface shall be made clear and free form rust, scales, dust etc. before painting. All
the steel work shall be painted with one coat of anti-corrosive paint and two coats of approved
enamel paint and shade complete as directed.
There shall be no holes left after welding. The welding shall be carried out by welders, well
experienced in the job and possessing certificate. The cutting should be smooth and the steel
shall be made perfectly straight as required. The bolts, nuts, washers, etc. used shall be of best
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
approved quality. After welding is done the welding surface shall be made clear by removing all
the flux by cheeping hammer wire brush.
The entire steel structure after erection shall be in perfect line and level and plumb and shall
structure after erection shall be in perfect in line and level and plumb and shall be approved by
the Engineer-in-charge before the sheeting work is started.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
DETAILED SPECIFICATION OF THE ITEMS OF WORK TO
Jungle cutting for preliminary survey light jungle cutting (bushes, hedges) in wet condition also,
including demarcation, marking alignments, points supervision etc. complete.
Providing and carrying out light jungle cutting and clearance of bushes, shrubs, hedges, weeds, wild
grass, thorny vegetation, creepers and other minor vegetation along the proposed survey alignment
and designated survey area, including in wet, damp, marshy and waterlogged conditions; including
site inspection, identification and demarcation of proposed alignment, marking of chainage points,
intermediate points, reference points, control points and other important survey locations using
suitable pegs, bamboo stakes, flags, paint or other approved marking materials; providing adequate
visibility and access for survey personnel and equipment; assisting the survey team in identification
and tracking of alignment, measurement and marking of survey points; collection, stacking and
disposal of cut vegetation at locations as directed by the Engineer-in-Charge; deployment of
necessary labour, supervisors, tools, tackles, brush cutters, safety equipment and consumables; taking
all necessary safety and environmental precautions; and completing the entire work under the
supervision and to the satisfaction of the Engineer-in-Charge, including all labour, materials,
equipment, transportation, incidental charges and all other operations necessary for proper
completion of the work, complete in all respects.
Mode of Measurement and Payment:
The work shall be measured in terms of the actual area cleared, in square metres (Sqm), or length of
alignment cleared as specified in the Schedule-B.
Measurement shall be based on the actual work executed and accepted by the Engineer-in-Charge.
The width of clearance shall be as per the approved survey requirements and site instructions.
Dismantling the C.C. lining including disposing off the dismantled materials as directed etc.
complete. (b) 7.5 mm thick
1. Scope of Work
• Execution: Carefully dismantle the existing 7.5 mm thick Cement Concrete (C.C.) lining using
approved tools, plant, and manual labour without damaging any adjoining structures, bed formations, or
slope formations.
• Disposal & Stacking: Collect, stack, load, transport, and dispose of all dismantled rubble, debris,
and unserviceable material to designated disposal sites as instructed by the Engineer-in-Charge.
2. Workmanship & Execution Guidelines
• Methodology: Dismantling shall be executed carefully using manual tools (crowbars, chisels,
hammers) or light mechanical equipment (jackhammers/pneumatic breakers).
• Protection of Surrounding Structure: The contractor must take utmost care to ensure that the
subgrade, adjacent slope/bed, and surrounding intact lining are not disturbed, cracked, or damaged.
Planning & Prior Approval: Dismantling shall always be planned in advance and executed in the reverse
order of construction.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
A detailed dismantling scheme shall be submitted and approved by the Engineer-in-Charge prior to
Note: Approval of the scheme does not absolve the contractor from the responsibility of safe dismantling
and proper execution.
Propping, Shoring & Underpinning: Necessary temporary shoring, propping, and underpinning shall be
provided for the safety of adjoining works, structures, or properties that are to remain intact.
Dust Control & Dust Enclosures: Wherever required, temporary enclosures, partitions, or water sprinkling
shall be provided to keep dust nuisance to a minimum.
Systematic Sequence: Work shall commence in a systematic manner. Materials or components that are
likely to be damaged by falling concrete shall be dismantled carefully first. Materials must not be dropped
haphazardly from height.
3. Ownership & Handling of Dismantled Materials
• Government Property: All materials obtained from dismantling shall remain the property of the
Government/Department unless otherwise specified, and shall be kept in safe custody until handed over
to the Engineer-in-Charge.
• Serviceable Materials: Any serviceable/reusable materials recovered during dismantling shall be
separated, cleaned, and neatly stacked as directed by the Engineer-in-Charge with all lead and lift
• Unserviceable Materials: All unserviceable materials, rubbish, and debris shall be stacked or
loaded, hauled, and disposed of at approved dumping locations specified by the Engineer-in-Charge.
4. Site Clearance
• Final Cleanup: On completion of the work, the site shall be completely cleared of all debris,
rubbish, and surplus materials, and left clean and presentable to the satisfaction of the Engineer-in-
Mode of Measurement and Payment:
The measurement shall be taken on Square meter basis. The rate includes all the cost of machinery,
equipment, labors etc. complete. The payment shall be made as per unit rate of squre meter for completed
Excavation for foundation in all sorts of soil including yellow, sandy, gravelly soil, soft & hard
murrum, etc. dry condition including depositing the excavated stuff in uniform layers in bank
sor as directed etc. complete for lead uo to 1.0 Km and all lifts. (By machinery)
In all soil, sand, gravel, soft murrum and other similar soft or loose material.
The excavation will generally refer to the open excavation for foundation.
(B) Clearing the site: -
The site on which the structure is to be built shall be cleared and all obstructions, loose
stones, materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The
materials so obtained shall be the property of the N.A. GIDC, Panoli and shall be conveyed and
stacked as directed by EIC. After cleaning of site payment shall be proceed.
(C) Setting out: -
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
After clearing the site, the center lines will be given by the EIC. The contractor shall assume
full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractors shall supply labour, materials etc., required for setting out the reference marks and
bench marks and shall maintain them as long as required.
(D) Excavation: -
It shall be all sorts of soil, sand, gravel, soft murrum or other similar soft or loose materials.
The excavation for foundation and for basement shall be carried out in true line and level
and shall have the width and depth as shown in the drawing or as directed by EIC. The contractor
shall do the necessary shoring and strutting or slopes to a safe angle, if necessary, including
bailing and pumping out water when separate provision does not exist for it in tender at his own
cost. The bottom of the excavated area shall be leveled both longitudinally and transversely as
directed by EIC. No earth filling will be allowed to bring it to level if by mistake or any other
reasons excavation is made deeper or wider than shown on the plan or directed by EIC. The
extra depth or width shall be made up with concrete or masonry of the foundation grade as
directed by the EIC and at the cost of the contractor.
(E) Disposal of the excavated stuff: -
The excavated stuff of the selected type shall be used in filling the trenches in layers
including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from site of work
to a place as directed by EIC with all lead and lift.
(F) Width of excavation for different diameters of pipes.
The width of trenches for different diameters of pipes to be given for excavation of
trenches/pit as per line out & direction given by Engineer in charge
(G) Depth of excavation of trenches
The depth for the trenches will be calculated from the ground surface to the bed of pipes and
in case when a layer of concrete or granular bedding and/ or precast blocks are required to be
placed, below the pipeline, the depth to the bottom of the concrete or granular, bedding will be
paid extra depth below collar, special etc shall not measure. Payment shall not be made for
excavation done beyond width mentioned.
(G) Fencing/lighting and watching.
The contractors shall make all proper provisions for protecting the work by fencing and by
watching and lighting at night or otherwise as may be directed by Engineer in charge. The posts
of the fencing shall be of timber securely fixed in the ground. There shall be two rails above the
ground and each shall be from 50 mm to 70 mm in dia and sufficiently long to run from post to
post, to which they shall be bound with strong rope. The method of projecting rails beyond the
posts and tying them together where they meet will not be allowed on any account. All along
the edges of excavated trenches a bank of earth about 1.20 mtr high shall be formed where
required by the Engineer in charge for further protection proper provision shall be made for
lighting at night, and watchman shall be kept to see that this is properly done. In the event of
contractors not fully complying with the provisions of this clause, the engineer may with or
without notice to the contractor put up a fencing or improve a fencing already put up or provided
or improve the lighting or adopt such other measure as he may deem necessary and all the cost
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
of such procedure including penalty damages together with all matters and things resulting for
not providing fending/inadequate fencing as may be decided by the Engineer shall be borne by
the contractor. The contractor shall also provide and display special board painted with
fluorescent paints.
(H) Maintenance of water pipes, GEB lines, Gas pipe and other services line met in
The contractor shall at the rate of item, in this tender excavate all such work as the
engineer may require in order to locate the position of water pipes, drains sewers or any other
work. All water pipes GEB lines, gas pipes, drain sewers or any other work, which may be met
or about any excavation shall be properly maintain by the contractor & by means of shoring,
strutting, planking over padding or otherwise as the engineer may direct shall be protected by
the contractor, from damage during the progress and things resulting from the same, shall be
made good and effectual remedied either by the contractors or by other agency, as the engineer
may decide at contractor’s risk and cost. In the event of the failure on part of the contractor to
carry out to the satisfaction of the Engineer any of the above protective provision or to execute
to his satisfaction such remedial work, adopt such measure as he may deem necessary at the
expenses and risk of the contractor. If, however, the Engineer considers it impracticable for the
contractor, to maintain any such water pipes, gas pipes, drainage sewers or any other work and
that exigencies of the work necessitate the breaking down, removal, or diversification if any
such water pipes, telephone lines, gas pipes drain sewers or other services. Also, at the
permission from other department is required should be obtained by contractor, for that
necessary help may be provided by corporation. While work is in progress, contractor should
inform various department such as a GEB water supply, Telephone, Gas for remain resent at site
of work. If any utility needs to be shifted than expenditure for the same to be borne by the
contractor. No reimbursements will be provided for any utility shifting. The expenditure for
utilities to be paid to the concerned departments.
J) Pumping out water effluent (De watering)
The contractor shall provide pumps, D.G sets, engines and machinery required to keep
to trenches for the sewers, drains of foundations and all other excavations clear of water, whether
sub oil water, storm water, leakage from tanks, wells, drains, sewers or pies so that there may
be no accumulates of such water and that no setting out may be done, no masonry may be laid,
no concrete deposited, no joints made and measurement taken in water. The pumping shall be
continued so long after execution of any portion of the work and repeated then after as the
Engineer may consider necessary. The pumps and power applied must be such as the engineer
may consider necessary to be sufficient at any particular time or he may consider necessary to
be sufficient at any particular time or he may himself supply pumps and power at contractor’s
Also, contractor should carry out the continuous watering from manholes of upstream
and down streams by pumping machinery D.G set, mud pump in such a manner that no
manholes, are over flow & checked up the U/G drainage line of up and down steam after fixing
dummies in RCC/PVC/CI line without any extra cost and provide sufficient pumps for de
watering. Also stand by pumping units to be available and employed in the event of mechanical
failure. The contractor must also arrange for night and day running and operating the pumps
wherever necessary, ensure that at all times the work may proceed.
The contractor shall not allow any accumulations of water either from the discharge of
their watering pumps of their water connection on the site of their work. Also, de watering work
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
made in a way that no water accumulation on roads and adjoining SWD / plots etc but contractor
should discharge the pumping effluent in nearby manholes where drainage line is flowing
smoothly. Also, de watering should be carried out from starting of excavation work till the
completion of job of one pit or as directed by Engineer in charge.
Wherever shoring may be deemed necessary by the Engineer, the contactor shall provide
the same in the best possible manner with the materials and to the satisfaction of the Engineer.
The contractor shall employ such kinds of shoring of the Engineer of agencies may consider for
the work to require and it is to be distinctly understood that the work “Shorting” is to be comprise
all of clause of such work and all appliances and apparatus including poling boards, sheet pilling
and runners (whether the joints be butt, groove and tongue feather, edge and groove, bids mouth
and double apply, revates or otherwise together with welling, strut, props, joins, blank shores,
raking shores, bocks wedges, iron dogs bolts, screws, nails and everything that may be required
for due execution of the work. No extra payment shall be made for the shoring
L) Contractor’s responsibility for secure shoring and or all damages
The contractor will be held responsible for providing secure shoring and for adopting
every other precaution which may be necessary or proper for protecting any building which may
be damaged or be liable to damage by the execution of any trench or otherwise by the execution
of the work in the vicinity of such building. If the Engineer, shall require the adoption of any
special or extra measures or precautions of the contractors forthwith adopt and supply the same,
but this provision is not to be read or understood as in any degree relieving the contractors from
responsibility or from liability of the contractor in respect of any claim made against the
Corporation for loss or damage which may be caused to any such building by the execution of
the work or otherwise, after the work is completed near building or property, the contractors
shall remove any shoring and make good any cutting out or other damage that may have been
M) Liability for timbering
No any work done as the instruction of the Engineers or his representative for the
timbering shall not absolve the contractor from his responsibility and he will be responsible for
making good any damages caused as a result of the timbering failing to give proper support to
the sides of the excavation.
The timbering to the sides of excavation for structure shall be carried out in such as way
that there is no obstruction caused to the filling of form work for the walls. The supporting struts
& walling shall be removed by the contractor in stages to suit progress of concreting pipe laying.
If the Engineer is not satisfied with the standard of timbering for that the sides of the excavations
safe for working, he may on hour after notifying the constriction or his representative in writing,
employ his own men to after the timbering and the cost such workman and materials employed
in including penalty shall be paid by the contractor.
M) Removing shoring
No part of the shoring shall at any time be removed by the contractor without obtaining
permission from the Engineer. While taking out shoring planks the hollows, if any, formed must
simultaneously be filled in with soft earth well rammed with rammers and with water or as
directed by Engineer in charge
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
O) Shoring left in trenches
The Engineer may order portions of shoring to be left in the trenches of such places,
where it is found absolutely necessary to do so as to avoid any damage, which may be caused to
building cables, gas mains, water mains, sewers, telephone cable etc in close proximity of the
excavations, by pulling out the shoring from the excavation. The contractor shall be paid at the
rate provided in this contract and rates only by the orders of Engineer, and they shall not claim
on any reasons, whatsoever, for shoring which may have been left in by them at their own
discretion. Any allowances for shoring not permanently left in the work will not be paid
Contractor should fix the dummies in manholes and various diameter RCC/PVC/CI pipes
in upstream and downstream by means of brick masonry RCC walls, and as directed by Engineer
in charge in such a way that no effluent coming through pipe line at the site of work. After
completion of repairing work at the particular pit/trenches, the dummies shall be removed by
contractor for providing/removing dummies; the contractor shall have to arrange labor, material,
equipment’s, all necessary tools and plant required for complete the job without any extra cost.
The rates are included in the item of excavation. Also, for providing dummies, if de-watering is
necessary, the contractor should have made necessary arrangement for that without any extra
cost. Also, debris of dummies to be removed from manholes and clear the manholes where
dummies are provided after completion of work to the satisfaction of Engineer in charge.
The rates for item No.3 of Schedule-B will be paid in cubic meter basis including
provision for the passage of traffic and for access to premises, arrangement for the continuous
for drainage, water supply or lighting ( if interrupted by the works ) arrangements for the
efficiency protection of the life and properly fencing, lighting, watching, pumping, shaping the
trenches maintenance of water pipes GEB lines, telephone cable, gas pipes, drains and other
work met with in or about the excavation watering and ramming foundations, temporary
refilling, consolidation and subsequent re-excavation, on account of rains, holiday or special
occasions, incl de-watering providing and removing dummies & clearing the site as per
instruction of Engineer in charge.
The rate shall be for a unit of one cubic meter.
Mode of Measurement:
The rate shall be for a unit of one cubic meter.
Dewatering the foundation trenches during excavation of canals, drains, foundation tranches,
concrete, masonry etc. till completion and diversion of surface and sub surface water by using
pumps of suitable capacity either diesel or electrical driven including cost oflabour, pipelines
etc. For delivery distance beyond 50 meters.
1. Scope of Work
The work encompasses continuous dewatering and removal of all accumulated surface water, sub-surface
water, seepage, subsoil water, rain, or sewage from foundation trenches, canal excavations, drain
alignments, and active construction zones (including masonry and concrete work) from the
commencement of excavation or construction until the final completion/backfilling of the works. It
includes the diversion of water streams, supply, installation, operation, and
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
maintenance of pumps of adequate capacity (diesel or electrically driven), laying and shifting of
delivery pipelines, hoses, accessories, and all associated labor and operational costs for a delivery
distance exceeding 50 meters.
2. Equipment and Plant Requirements
• Pumps: Pumping units of suitable types and capacities (such as centrifugal, submersible, or
sludge/trash pumps) driven by reliable diesel engines or electric motors shall be deployed. Standby pumps
of adequate capacity must be kept ready on-site to handle sudden surges, heavy rain, or emergency
• Power Source: Uninterrupted power supply or adequate diesel generator (DG) sets along with fuel
storage must be maintained on-site to ensure continuous dewatering operation, particularly during power
• Pipelines and Conduits: Heavy-duty delivery hoses, rigid or flexible discharge pipes of sufficient
diameter to minimize friction head loss, clamps, valves, and necessary fittings capable of handling a
delivery length greater than 50 meters without leakage or bursting.
• Diversion Channels & Bunds: Sandbags, earth bunds, temporary diversion drains, channels,
sumps, and filter beds as necessary to channelize and divert surface runoff away from the excavation
3. Execution Methodology
A. General Principles
• The contractor shall keep all excavations, foundation pits, trenches, canal beds, and structural
works free from standing water, mud, and slurry at all times during excavation, laying of blinding
concrete, masonry work, CC/RCC lining, and until concrete/mortar has achieved initial setting strength
and structural stability against hydrostatic uplift.
• Under no circumstances shall fresh concrete or newly laid masonry be allowed to be submerged
in water or subjected to flowing water currents during placement and curing.
B. Sump Construction and Drainage Systems
• Peripheral drainage channels and collecting sumps of adequate depth and size shall be excavated
outside the neat lines of foundations or canal profiles to pool seepage water.
• Pumping shall generally be carried out from sumps so that the concrete mix or mortar ingredients
are not washed away or disturbed. Direct pumping from structural foundation pits where concrete is being
placed is strictly prohibited unless adequate protective formwork or filter sumps are used.
C. Diversion of Surface and Sub-Surface Water
• Prior to commencing major excavations in canals or drains, appropriate temporary diversion
works (such as bunds, diversion cuts, flumes, or channels) shall be constructed to divert upstream surface
flows around or safely past the active construction reach.
• Sub-surface seepage shall be intercepted using graded gravel filters or peripheral relief drains
leading to pumping sumps to prevent boiling or softening of the formation bed.
D. Log-Distance Discharge Management
• Water pumped out from the excavations shall be conveyed through delivery pipes or channels for
a distance exceeding 50 meters away from the work site to natural watercourses, municipal storm drains,
or approved disposal points so that it does not flow back into the excavation or cause stagnation, erosion,
or public inconvenience.
• Proper erosion-control measures (such as splash pads, rip-rap, or silt traps) shall be provided at
the discharge end of the pipeline to prevent scouring of adjacent lands.
4. Safety, Environmental, and Statutory Compliance
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
• Electrical Safety: All electrical installations, cables, starter panels, and pumps used in damp or
wet environments must be properly grounded, weather-protected, and equipped with earth-leakage circuit
breakers (ELCB) in compliance with relevant electrical safety regulations.
• Environmental Protection: Discharged water heavily laden with silt or suspended solids must be
passed through settling basins, temporary sediment tanks, or filter bags before being released into natural
streams or public drainage systems to prevent siltation and environmental pollution.
• Continuous Operations: Dewatering operations shall run round-the-clock (24/7) where required
by hydrogeological conditions, seasonal heavy rains, or tidal influences.
5. Measurement and Payment
Unit of Measurement: Dewatering is typically measured as an itemized unit within the BoQ as specified
in the contract framework.
Rate Inclusions: The quoted rate shall include the cost of all labor, skilled operators, supply, installation,
positioning, and relocation of diesel/electric pumps, fuel/lubricants or electric power charges, laying,
joining, dismantling, and maintenance of delivery pipelines and hoses for a delivery distance beyond
meters, construction and maintenance of sumps and temporary diversion bunds, silt management, standby
arrangements, and all incidental operations required to keep the site completely dry until official
completion of the respective phase of work.
Providing and laying dry rubble pitching of various thickness to required grade including trimming
of earthwork, hand packing the interstices with spauls, filling earthin interstices panneling complete
for all leads and lifts. 9a) 300 mm thick
1. Workmanship: -
The dry rubble pitching material shall consist of the most durable rock fragments of approved quality
selected for the purpose. The stones shall be used from the approved quarries and shall be subject to the
inspection and approval by the Engineer-in-charge. The quality of individual stones shall be hard, dense,
sound and resistant to abrasion. They shall be free from cracks, seams, shale particles, conglomerate bends
and other defects that lead to the increased susceptibility to destruction by water and weathering action.
The shape of the individual stone shall be angular. Stones having thickness less than 50% of their
maximum dimensions shall not be used for pitching. Rubble when immersed in water for 24 hours shall
not absorb water by more than 5 percent of the dry weight when tested in accordance with IS : 1125-
1974*. The length of rubble shall not exceed three times its height and thickness in any case not less than
15 cms. Minimum crushing strength of rubble shall not be less than 105 kg/cm².
2. SIZE OF RUBBLE / STONE
No stone / rubble shall be of size less than 0.021 m³. At least 15% of stones to be used for pitching shall
have depth equal to the thickness of pitching i.e. 30 cm. No stone shall have a dimension less than 20 cm.
3. Slope Cutting
The compacted embankment, or the old surface of the slope which is to be protected with stone pitching,
shall be trimmed to the lines as prescribed on the drawings or as directed by the Engineer-in-charge from
time to time. The earth obtained from this trimming shall be laid on top of the embankment if required or
disposed of as directed by the Engineer-in-charge. Slope should be cut to the true profile after clearing
the old surface from vegetation or other unwanted materials.
4. Thickness of Pitching
The thickness of pitching shall be as directed on the drawings. The thickness shall be measured normal
to the slope of the embankment.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
5. Method of Placing
(a)Before laying the pitching on sides of the banks, the receiving surface shall be trimmed to the required
slopes and profiles. Depressions shall be filled up and thoroughly compacted. Pitching shall be started
from the end and built in courses upwards. The larger stones shall be placed in the bottom course and for
use as headers for subsequent courses.
(b)All interstices between adjacent stones shall be filled with spauls of proper sizes and wedged in with
hammer to ensure tight packing.
(c) Testing of rubble shall be done as per specification of materials as described in M-4.
The joints shall not be more than 35 mm thick but shall be sufficiently thick to prevent stone to stone
contact and shall be completely filled with sand and murrum.
6. Measurement and Payment
Measurement for payments shall be made on the basis of square meter of the completed works. The unit
rate is inclusive of trimming the earth to required profile, slope, grade paneling and preparing level strips
at suitable intervals as directed to have uniform base, etc. as per the above specifications.
Providing and laying plain/reinforced Nominal Mix cement concrete of various grade with
cement, sand and coarse aggregates including centering, shuttering, batching, mixing,
transporting, placing, vibrating, smooth finishing, curing etc. complete for all lead and lift.
(Manually With Conventional Mixer, Excluding dewatering)
Concrete shall be composed of cement, fine aggregate (Natural and /or crushed sand), coarse aggregates
(crushed or natural or otherwise where specifically mentioned in the item in the schedule B of the tender)
and water, well mixed in specified proportion
Water shall confirm to M-1 of specification of material.
Cement shall confirm to M-3 of specification of material.
Sand shall confirm to M-6 of specification of material.
Coarse aggregate shall confirm to M-10 of specification of material.
TMT Steel shall confirm to M-14 & M-15 of specification of material.
Concrete mix shall be "DESIGN MIX" only and is to be design by preliminary tests in the laboratory.
The proportions for ingredients shall be by mass only except for water. The grade of concrete shall be M-
15, M-20 & M-25 with maximum size of aggregate is 20 mm.
4. PROPORTIONING CONCRETE
(a) Concrete mix shall be designed on the basis of preliminary tests. The proportion of ingredients shall
be such that concrete has adequate workability for conditions prevailing on the work in question and
can be properly compacted with the means available.
(b) Except it can be shown to the satisfaction of the Engineer-in-charge that supply of properly graded
aggregate of uniform quality can be maintained till the completion of work. grading of aggregate shall be
controlled by obtaining the coarse aggregate in different sizes and blending them in the right proportions
as required Different sizes however shall be stacked in separate stock piles Required quantity of material
shall be stock piled several hours preferably a day before use. In proportioning concrete, the quantity of
both cement and aggregate shall be determined by weight water shall either be measured by volume.
(d) The cement level for various grades of controlled concrete shall be considered as under as described
in general technical specification for cement concrete works
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Sr. No Grade of concrete Cement level required
in Kg per cubic meter
(e) Actual cement level required for the aggregate to be used shall have to be determined by laboratory
tests. The mix proportions shall be selected to ensure that the workability of the fresh concrete is suitable
for the conditions of handling and placing so that after compaction it surrounds all reinforcements and
completely fills the form work. When concrete is hardened, it shall have the required strength, durability
and surface finish As described in general technical specifications for cement concrete works described
above in condition no iii) In case for starting new works the mix design obtained from National council
for cement and building material laboratory can be used for starting of work until the mix design of the
corresponding work is available , so the necessary delay in starting the work due to want of mix design is
However, the materials from the work site should be immediately sent to laboratory for mix design
(f) A mix shall be designed to produce the grade of concrete having the required workability and
characteristic strength not less than that stipulated in tender specification. However, due to change in
design mix, if it becomes obligatory to use less or more cement per cubic meter of concrete the Contractor
shall do the same without claiming any extra cost for handling of extra cement, however due to change
in design mix it is obligatory to use less/more cement per cu.mt. of concrete. Contractor shall do same
without claiming extra cost for using cement. In case actual cement use being less then cement level
specified in table here in above, the department will deduct the cost of cement from the bill at the base
price of star rate and rate analysis per ton of cement at work site for reduce consumption of cement. In
case actual use of cement being more than specified above no extra payment for additional cement level
shall be made and contractor shall have to bear addition cost. Design mix and actual cement level required
shall be communicated to the Contractor in writing by the Engineer-in-charge
(g) The quantity of water shall be just sufficient to produce a dense concrete of required workability and
strength for the job. An accurate and strict control shall be kept on the quantity of water.
(h) In the case of reinforced concrete work, workability shall be such that the concrete surrounds and
properly grips all reinforcement. The degree of consistency, which shall depend upon the nature of work
and methods of vibration of concrete, shall be determined by regular slump tests at work site, Slumps
shall be adopted for different types of works by considering medium type degree of workability as per
I.S.456-2000 and value for the same is as under.
Type of Work Slumps allowed
Retaining wall/structure 50-100 mm at site
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
5. DESIGN MIX CONCRETE
The design mix shall be design to produce the grade of concrete having the required workability and a
characteristic strength and target mean strength as per IS-456-2000.
The design mix shall be carried out in Govt. laboratory (GERI) as per IS-10262. / OR Govt. approved
laboratory, Government college.
6. Strength Requirement of Concrete
The compressive strength requirements for the various mixes by concrete shall be as follows:
Type of concrete. Minimum Compressive strength in N/mm² of 150 mm cubes.
Grade of concrete 7 Days 28 Days
M10 2/3 of 28 Days Strength 10 N/mm²
M15 2/3 of 28 Days Strength 15 N/mm²
M20 2/3 of 28 Days Strength 20 N/mm²
6.1 Quantity of Water
(a) The quantity of water shall be just sufficient to produce a dense concrete with required workability.
(b) The workability shall be such that the concrete gives values of slumps as specified in pera 4-(h).
6.2 PRODUCTION OF CONCRETE
(a) Concrete Must be mixed in a Batching Plant or on Wheel Batching Plant and shall be as dense as
possible, plastic enough to consolidate well and stiff enough to stay in place on the slopes.
(b) Mixing shall be continuous until there is uniform distribution of the materials and the concrete is
uniform in cool and consistency.
The quantity of water to be used in the concrete shall be determined from time to time during the course
of concreting work in order to secure concrete of proper consistency and also adjust for any variation in
the moisture content or grading of the aggregates as they enter the mixer.
Addition of water to compensate the stiffening of the concrete resulting from over mixing or objectionable
drying before placing shall not be permitted. Uniformity in concrete consistency from batch to batch shall
be ensured by taking slump test. Concrete shall be laid from the bottom to the top of the slope, for which
consistency shall be such that the concrete will just stay in place on the slope.
7 Transporting Concrete
(a) Concrete shall be transported from the mixer to the placing position as rapidly as practicable by
methods that will prevent segregation or loss of ingredients or the loss of slumps in excess of 25 mm
before the concrete is placed in position.
(b) Chutes used for conveying concrete shall be of such size and shape as to ensure a steady uniform flow
of concrete in a compact mass without separation or loss of ingredients and shall be protected from wind
and sun wherever necessary to prevent loss of slump by evaporation, and shall be furnished with a
discharge hopper. Free fall or drop of concrete shall be limited to 150 cm. Chute sections shall be made
of or lined with metal and all runs shall have approximately the same slopes not flatter than 1 vertical to
2½ horizontal. The required consistency of concrete shall not be changed in order to facilitate chuting.
Wherever there is a free fall within the conveying system, suitable baffle plates, splash boards or down
spouts shall be provided to prevent segregation, splashing or loss of ingredients. Whenever it is necessary
to hold the discharge end of a chute more than 3 meters above the level of the fresh concrete, a flexible
down spout shall be used to break the fall and to confine the flow. The lower end of the spout shall be
held close to the place of deposit. Wherever depositing is intermittent, a discharge hopper shall be
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
provided. All chutes shall be thoroughly cleaned before and after each run. All wash water and debris
shall be disposed of outside the forms.
8 PREPERATION FOR PLACING CONCRETE
8.1 General Requirement
(a) No concrete shall be deposited until the foundation has been inspected and approved and until all form
work required is completed, embedded parts if any installed and checked and surfaces prepared for
(b) All surfaces of forms and embedded materials that have become encrusted with dried mortar or grout
from concrete previously placed shall be cleaned off all such mortar or grout fresh concrete is placed.
8.2 Foundation Surfaces
(a) Immediately before placing concrete, all soft or loose stuff shall be removed. For foundation over soil,
the surface shall be moistened to depth of about 15 cm to prevent the sub grade from absorbing water
from the fresh concrete. Just before placing the concrete, the surface of the earth shall be tamped or
otherwise consolidated sufficiently to prevent contamination of concrete during placing. If subsoil water
is met with the foundation, it shall be dewatered. The dewatering shall be continued till the placing and
the setting of concrete is completed.
(b) Foundation of porous or free draining material shall be thoroughly wetted and compacted by
tamping or rolling if necessary. The finished foundation surface shall then be blanketed with a layer
of a tar paper or a closely woven burlap, carefully lapped and fastened down along the seams. This
shall be done to prevent the loss of ingredients including water from the concrete.
8.3 Surface of Construction and Contraction Joints
(a) The surface of construction/ contraction joints shall be clean, rough and damp but free from standing
pools of water at the time of receiving the next lift. Cleaning up shall comprise removal of all loose or
uncompacted materials surface coating, and other foreign materials, through by scrapping, chipping,
water jetting or other suitable means.
(b) The method used in disposing off waste water employed in cutting, washing and rinsing of
concrete surface shall be, such that the waste water does not stain, discolor or affect exposed surfaces
of the structures. Methods of disposal of waste water shall be subject to approval.
9 Placing and Compacting Concrete.
(a) As far as it is possible, concrete shall be placed directly in its final position and shall not be caused to
flow in a manner to permit or cause segregation. Methods and equipment employed in placing concrete
shall ensure that aggregate is not separated from the concrete mass.
(b) Manual concrete placing by head basket shall be permitted. The concrete shall be used within
minutes of mixing. Re-tampering of concrete shall not be permitted. Any concrete which has become so
stiff that proper placing without re-tampering cannot be ensured, shall be wasted.
(c) In form work, structural concrete placement shall generally be started with an over-sanded mix
containing 20 mm maximum size aggregate and 10% extra cement with a slump of about 125 mm placed
several centimeters deep on the joints at the bottom of the form. Concrete placement shall commence
immediately thereafter.
(d) Concrete shall be compacted to the maximum practicable density, in such a manner that it is free from
pockets of coarse aggregate and is in intimate contact with surface of forms and embedded materials.
Unless otherwise permitted, all concrete shall be compacted by mechanical vibrator.
(e) Compaction of concrete shall whenever practicable be carried out by the use of immersion type
vibrators. Vibrators having vibrating heads less than 100 mm in diameter shall be operated at speed of at
least 7,000 revolutions per minute in the concrete. Normally formwork shall be designed to provide for
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
the insertion and operation of mechanical vibrators in the placed concrete. Form vibrators shall be used
wherever internal vibration is not possible or would be inadequate.
(f) In compacting each layer of concrete, the vibrator shall be operated in almost vertical position and the
vibrating head shall be allowed to penetrate and re-vibrate the concrete in the upper portion of the under
laying layer. In the area where freshly placed concrete in each layer joints with previously placed concrete,
more vibration than usual shall be performed with the vibrators penetrating deeply at close intervals along
these contacts. Layers of concrete shall not be placed until layers previously placed have been vibrated
thoroughly as specified. Contacts of the vibrating head with surface of the forms shall be avoided.
(g) During placing and until curing is completed, the concrete shall be protected against the harmful
effect of exposure to sunlight, wind and rain as directed.
(a) Forms shall be used wherever necessary to confine the concrete and shape it to the required lines, or
to ensure against contamination of the concrete by material caving in or sloughing from adjacent surface
left by excavation or other features of the work. All exposed concrete surface left by excavation or other
features of the work and all exposed concrete surfaces having slope steeper than that of two horizontals
to one vertical shall be formed.
(b) Form work shall be of timber, or steel, form work shall be substantially and rigidly constructed
to the shapes, lines and dimensions required, efficiently propped and braced to prevent deformation
due to placing, vibrating and compacting concrete, other incidental loads or the effect of weather.
(c) The surfaces of form work shall be made such as to produce the surface finishes as specified. The
form work joints shall be tight enough to prevent loss of liquid from concrete. Joints between the form
work and existing concrete structures shall also be "grout tight". Form work shall be arranged to facilitate
easing and removing of the various parts in correct sequence, without jarring or damaging the concrete.
Fixing block bolts or similar devices may be embedded in the concrete, provided they do not reduce the
strength or effective cover of any part of the structures below the required standard but the use of through
bolts shall be avoided whenever possible. Temporary openings shall be provided at all points necessary
in the forms to facilitate cleaning and inspection immediately before placing of the concrete.
(d) Forms shall overlap the hardened concrete in the lift previously placed by not more than 75 mm and
shall be tightened strongly against the hardened concrete so that when concrete placement is resumed, the
forms will not spread and allow offset or loss of mortar at construction joints. Additional bolts or form
ties shall be used as necessary to hold forms tight against hardened concrete. Particular attention shall be
paid in setting and tightening the forms for construction joints so as to get a smooth joint free from sharp
deviations or projections.
(e) Molding strips shall be placed in the corners of forms so as to produce chamfered edges as required
on permanently exposed concrete surface.
10.2 Form, Centering and Temporary Works
(a) All centering, form work and temporary works shall be constructed according to the approved
drawings and specifications.
(b) As soon as practicable, after the acceptance of the tender, the Contractor shall submit a scheme
showing the order of procedure and method by which he proposes to carry out the work, together with
such details as are necessary to demonstrate the adequacy, stability and safety of the methods.
(c) The approval to the general scheme of centering as well as design criteria and loading shall be obtained
in good time to facilitate all preparatory works. Any delay on this account shall be the responsibility of
the Contractor.
(d) After approval of the general scheme, the contractor shall prepare detailed designs and drawings for
execution of the form work, centering and temporary works. These shall be forwarded to the Engineer-
in-charge for approval. No work shall be carried out without prior approval of the Engineer-in-charge.
(e) The approval of the Engineer-in-charge is specified with a view to reasonably ensure that the form
work in general, is adequately designed. Notwithstanding the approval given to the design criteria and
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
loading and the general scheme for the centering, the entire responsibility for the satisfactory execution
of the centering and all temporary works shall rest with the Contractor and he shall be liable to pay all
claims and compensation arising from any loss or damage to life and property due to any deficiency,
failure or malfunctioning of the centering or the temporary works.
(f) Forms required to be used more than once shall be maintained in serviceable condition and shall be
thoroughly cleaned and repaired before reuse. Where metal sheets are used for lining forms, the sheets
shall be placed and maintained in the forms without humps or other imperfections. All forms shall be
checked for shape and strength before reuse.
10.3 Cleaning and Treatment of Forms
At the time the Concrete is placed in the forms, the surface of the forms shall be free from encrustations
of mortar, grout or other foreign material. Before the concrete is placed, the surface of the forms shall be
oiled with a commercial form oil, that will effectively prevent sticking and will not stain the concrete
surface. For timber forms, form oil shall consist of pure refined pale paraffin mineral oil or other approved
form oil. For steel forms, form oil shall consist of refine mineral oil suitably compounded with one or
more ingredients which are appropriate for the purpose. Care shall be taken to keep form oil out of contact
with reinforcement.
10.4 Removal of Forms
(a) Except as otherwise provided in this sub-clause, forms shall be removed as soon as the concrete has
hardened sufficiently, for earliest practicable repair of surface imperfections.
(b) Forms on upper sloping surfaces of concrete, such as forms on the water sides of warped transition,
shall be removed as soon as the concrete has attained sufficient stiffness so as to prevent sagging. Any
needed repair or treatment required on such slopping surface shall be performed at once and be followed
immediately by specified curing.
(c) In order to avoid excessive stresses in the concrete that might result from swelling of the forms, timber
forms for wall openings shall be loosened as soon as this can be accomplished without damage to the
(d) Subject to the approval, forms on concrete surface close to the excavated rock surface may be left in
place provided that the distance between the concrete surface and the rock is less than 400 mm and that
the forms are not exposed to view after completion of the works.
(e) Forms shall be removed with care so as to avoid damage to the concrete. Damage if any due to form
removal shall be repaired immediately.
(f) For ordinary Portland cement concrete the following minimum intervals of time as per
specifications in IS : 456-2000 shall generally be allowed between placing the concrete and striking
the formwork. The period shall be modified if required, in case of wet weather etc. as per direction
of the Engineer-in-charge.
11 Finish and Repairs to Concrete
(a) All exposed concrete surfaces shall be finished true to line and level, either manually or by mechanical
contrivances. It shall be cleaned off impurities, lumps of mortar or grout and unsightly stains. The finished
surface shall be even, smooth and free from pockets and equivalent to that obtainable by the effective use
of a long-handled steel trowel. Where the surface produced meets the specified requirements, no further
finishing operation shall be required.
(b) The surface of concrete finished against form shall be smooth and shall be free from projections,
honeycombing and other objectionable defects. Immediately on removal of the forms, all unsightly ridges
or lips shall be removed and undesirable local bulging on exposed surface shall be removed by tooling
(c) Repairs to concrete surface and additions where required shall be made by cutting regular
openings into the concrete and placing fresh concrete to the required lines. Chipped openings shall
be sharp and shall not be less than 75 mm in depth.
12 Curing of Concrete
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
All equipment, material etc. needed for curing and protection of concrete shall be kept handy and ready
for installing before actual concreting begins. Detailed plans, methods and procedures whereby the
various phases of curing and protection shall be firmly established, shall be settled and got approved from
the Engineer-in-charge sufficiently in advance of the actual concreting.
12.2 Watering/ Curing
(a) Uniform top surfaces of walls, piers etc. shall be moistened by covering with water saturated material
or by other effective means as soon as the concrete has hardened sufficiently to prevent damage by water.
These surfaces and steeply slopping and vertical formed surfaces shall be kept completely and
continuously moist, prior to and during form removal, by water applied on the unformed top surfaces and
allowed to pass down between the forms and the formed concrete faces. This procedure shall be followed
by the specified water curing.
(b) Concrete cured with water shall be kept wet for at least 14 days immediately following placement
of the concrete or until covered with fresh concrete by covering with water saturated material or any
other suitable method, which will keep all surfaces continuously (not periodically) wet.
13.4 Construction Joints
(a) Concreting shall be carried out continuously up to the construction joints, the position and details of
which shall be as shown on approved drawings or as directed by the Engineer-in-charge.
(b) For vertical construction joints stopping boards shall be fixed previously at a predetermined position
and shall be properly stayed for sufficient lateral rigidity to prevent its displacement or bulging when
concrete is placed against it. Concreting shall be continued right up to the board. The board shall not be
removed before expiry of the specified period of removal of vertical forms.
(c) Before resuming work at any construction joint when concrete has not yet fully hardened, all laitance
shall be removed thoroughly, care being taken to avoid dislodgement of coarse aggregates.
(d) When work has to be resumed on a surface which has hardened, it shall be thoroughly racked, swept,
clean, wetted and covered with a layer of neat cement grout, just prior to the placement of the concrete.
(e) In all cases, the position and detailed arrangement of all construction joints shall be predetermined
and got approved by the Engineer-in-charge.
15 Steel Reinforcement
Steel shall confirm to para-M-14, M-15 & M-16 of specification of material of steel.
16 Centering and Scaffolding
(a) The scaffolding must take account of all construction loads as well as speed of erection. Scaffolding
may be bolted on the sleeves embedded in the concrete wall (initially used for fixing shuttering). After
concreting, the scaffolding will have to remain in position near stressing points till all the stressing is
completed. Complete drawings of false work, accompanied where necessary by calculations shall be
submitted for the approval of the Engineer-in-charge, 3 months prior to commencement of erection.
(b) Any modification that the Engineer-in-charge may require shall be made by the Contractor.
Notwithstanding the approval of or alternation suggested by the Engineer-in-charge in the submitted
design for any of the temporary works, etc. the contractor shall remain wholly and entirely responsible
until the final acceptance of works, for the efficiency, security and maintenance and for all obligation and
risks in regard to such work specified or implied in the contract. He shall reinstate the work at his own
cost, should any mishap or accident occur causing damage or injury thereto, subject, however, to such
provisions of the conditions of contract as may be applicable in the case of such damage or injury.
(c) Scaffolding may be released as per the convenience of the work. Centering shall be lowered only with
the approval of the Engineer-in-charge and in a manner which shall not damage the work. Scaffolding
shall rest on wedges or sand boxes or on screw jacks in order to permit controlled de-shuttering. After
initial lowering, centering shall be kept in place till all finishing, repairing work is completed on the
underside of the structure.
A suitable designed flight of stairs giving temporary access to the top shall be provided by the Contractor
at his own cost as a part of the false work scheme.
17 Measurement and Payment
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The prices entered in the Schedule-B for the incorporation of the various classes of concrete, plain and
reinforced required by this section shall be inclusive of mobilizing, demobilizing, supplying all
equipment’s, forms, materials, labour, supervision and all incidental work except for any item specifically
exempted there from and for which, in addition, a specific item for payment has been included in the
(a) Except or otherwise especially for in the specifications, measurement of concrete for payment shall
be made on the basis of the volume of concrete calculated as being contained within the concrete outlines
shown on the relevant drawings.
(b) Measurement, for payments, for the concrete laid in pockets in the foundation shall be made on the
basis of the volume of the pockets filled.
(c) No payments shall be made for the concrete backfill beyond the minimum lines of excavation shown
on the drawings except where such payment is specifically authorized. Measurement of concrete shall be
made after deducting the volume of all recesses, passageways, chambers, openings, cavities and
depressions, but without deductions for round or beveled edges or space occupied by electrical conduits
and reinforcement.
(d) Concrete shall be measured on the basis of volume of concrete calculated as being contained within
the concrete outlines shown on the relevant drawings.
(e) The unit rate for concrete shall include the cost of all materials, labour, tools and plant required for
mixing, placing in position, vibrating and compacting, finishing as per direction of the Engineer-in-
charge, curing and all other incidental expenses for producing concrete of specified strength to complete
the structure or its components as shown in the drawings and according to these specifications. The rate
shall also include the cost of providing, fixing and removing of all centering and formwork required for
the work unless otherwise specified in the contract.
(f) The unit rate also includes the cost of dewatering, diversion and protection work as may be necessary
during and after concreting work.
(g) All expenses likely to be incurred by the Contractor in transporting materials supplied to him to the
site of work, the expenses incurred in improving the quality of materials to acceptable levels (such as
screening, washing etc) and the expenses incurred in proper storage of materials as directed by the
Engineer-in-charge etc. are deemed to be included in the unit rate.
(h) Payment for the various classes of concrete shall be made on the basis of unit rate per cubic meter
quoted for relevant items in schedule-B.
Mode of Measurement: -
The concrete work shall be measured in length, breadth and depth as specified in drawing or as directed.
The rates shall be paid for a unit of one cubic meter.
Providing & Supplying ISI standard RCC Pipe in standard length of following class & diameter
suitable for collar OR rubber ring joints incl all taxes. Loading, unloading, stacking etc all
The proportion of cement and sand in mortar shall be as specified in item by volume and shall be measured
by volumetric boxes of suitable size.
The mortar shall be used within 30 minutes after addition of water. Any mortar remain unused after the
period of 30 minutes shall not be allowed to be used and shall be removed from site.
The cement mortar shall be machine mixed. While mixing, the water shall be gradually added and
thoroughly mixed to form a stiff plastic mass of uniform color so that each particle of sand shall be
completely covered with film of wet cement. The water cement ratio may be adopted as per requirement
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
or as directed. However, if hand mixing is required to be done due to working difficulties or small quantity
10% extra cement shall be used without any extra cost by the contractor. It shall be done on water tight
platform of suitable edging with straps, fasteners along sides to prevent materials being washed off during
mixing. The cement, sand shall be thoroughly mixed at least three times in dry state before water is added.
The mixture should have the color of cement uniformly distributed and be of the consistency specified.
Pipe shall be supplied by the contractor to the site of work at his own cost. The collars shall first be slipped
over the rear end of the pipe. The ends of the pipes shall then be filled with sufficient section of jute bags
dipped in bitumen or cement slushy of stiff consistency. The pipe shall then be brought forward until the
plastering in the recess of the first pipe, gets in the recess on the second pipe. The process shall be repeated
for two or three times which shall be jacked before and during it should be seen that they are not at the
joint. The collar shall then be set in proper position taking care to have even caulking space all round.
The mixture of cement and sand in proportion 1:1 shall then be filled into the caulking space as well as
at the edge of either side of the collars in the mixture of cement and sand shall be just sufficient to form
clod when compressed wet hard for joints. The caulking of each collar should be so firm that it will be
difficult to drive the point of knife. Before the jacks are removed the sides shall be filled with rammed
earth or required materials as per drawing to prevent all chances
of subsequent movement. This is of great importance and for this the trench shall be back filled around
the joints as it is sufficiently set to stand it. The joint shall be kept thoroughly wet for 3 to 4 days at least.
The sand for caulking shall be fairly well grade from 1\16 downwards.
Filling of the trench by earth shall be properly rammed and watered up to the road level, if necessary,
earth set down and any depression formed, the contractor shall have to refill it any time till the surface
shall be carried out as directed by the department. No extra claim for this shall be granted.
The contractor has to produce Test Results from manufacturer.
MODE OF MEASUREMENT AND PAYMENT:
The rates of items include the cost of materials and labors for providing the pipes including collar, filling
and caulking the joints, finishing, curing etc.
Payment shall be made for item at the rates for completed items of work tendered therefore in Schedule-
B on Rmt basis of actual work done.
Providing and placing in position reinforcement bars including cutting, bending welding, joints
where necessary, hooking etc. complete as per drawing for all lead and lifts.
Providing TMT Bar fe 500D reinforcement for RCC work including bending, binding and
placing in position complete up to floor two level
MATERIALS: T.M.T (Thermo Mechanically Treated) bars shall be of approved make (List
of approved make attached with Technical Bid) and shall conform to M-15 of Specification of
Materials attached herewith.
Mild steel binding wire shall conform to M-16 of Specification of Materials attached
1. WORKMANSHIP:
Fabrication and placing of Mild steel reinforcement in position shall conform to C-7 of Code of
practice attached herewith &&IS: 2502 -
The work shall be executed in accordance with best modern practices.
2. MODE OF MEASUREMENT & PAYMENT:
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
The length of bars as shown on the drawing or as directed by the Engineer-in-charge shall
be measured correct up to two decimals in meters and the weight payable will be worked out at
the rate mentioned in M-15 of Specification of Materials attached herewith as specified in I.S.
1200-Part-VIII of 1974 or latest edition so far applicable.
The contract rate shall be for a unit of one Qtl.
Lowering, laying & Jointing ISI standard RCC Pipe in standard length of following class &
diameter in Proper position, Grade, and alignment at all level as directed by engineer in charge
incl. all etc all complete
Installation of Factory made RCC Pipe units with Lid Covert in proper line level and alignment
completed as direct by EIC or any concern authorities. The rate is included Unloading and Installation
with joining of elements with proper techniques and standards of MFG, Machineries, Taxation,
material and labour charges.
Unloading of material & Installation on specific location at site in line, level, gradient and plumb,
with proper jointing etc (With removing of existing pipe) as per instruction of EIC
MODE OF MEASUREMENT & PAYMENT:
The rate shall include the cost of materials and labour involved in all the operation described above.
The contract rate shall be for a unit of one Running Meter.
Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including
watering, ramming and consolidating etc. complete.
1. Scope of Work
The work shall consist of providing, spreading and dressing hard murrum or soft murrum on the canal
service road to the required grade, level and camber as directed by the Engineer-in-Charge. The work
shall include carriage of murrum to the site, spreading, leveling, dressing and finishing to obtain a smooth
and uniform road surface.
The murrum used shall be approved quality hard murrum or soft murrum obtained from approved borrow
areas or quarries. The material shall be free from organic matter, roots, clay lumps, stones larger than the
specified size and other deleterious materials.
The murrum shall be of good binding quality and suitable for forming a stable service road surface.
3. Preparation of Surface
Before spreading the murrum, the existing surface of the service road shall be cleared of loose earth,
vegetation and other foreign materials. The surface shall be properly shaped to the required alignment
Any depressions or irregularities shall be corrected before laying the murrum layer.
4. Spreading of Murrum
The murrum shall be spread evenly over the prepared surface to the required thickness as directed by the
Engineer-in-Charge. The material shall be uniformly distributed over the entire width of the service road.
Care shall be taken to avoid segregation of coarse and fine materials during spreading.
5. Dressing and Finishing
After spreading, the murrum layer shall be dressed and leveled to the required grade and camber using
suitable tools and equipment. The surface shall be properly compacted by traffic movement or light rolling
where required so as to obtain a smooth, even and stable surface.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
All depressions or irregularities noticed during dressing shall be corrected by adding additional murrum
and re-dressing.
6. Inspection and Approval
The finished surface shall be true to the required alignment, level and camber and shall be subject to
inspection and approval by the Engineer-in-Charge before acceptance.
Measurement shall be made in cubic meters (m³) of murrum provided and spread on the canal service
road as per the finished dimensions. The rate shall include providing hard or soft murrum from approved
sources loading; transportation to site with all leads and lifts Spreading, leveling and dressing to required
grade and camber Labour, tools, equipment and incidental charges all royalties, duties, taxes and fees
necessary for completing the work as specified.
Providing and laying plain/reinforced cement concrete lining of M-15 grade in bed, side slopes
and curvature including batching, mixing, transporting, placing, smooth finishing, curing
including dewatering where enquired. (machinary based without Paver). (b) 10.0 Cm thick lining
Description as per item no
MODE OF MEASUREMENT AND PAYMENT: -
Payment shall be made at the rates for completed items of work tendered therefore in schedule-B on
square meter basis of actual work done. The rates shall include all expenditure on labour, materials,
equipment’s required for carrying out satisfactory work. The rate of items includes the cost of
transporting, dewatering, smooth finishing, curing, etc. complete.
Excavation of canal/drains in all sort soft soils (including wet and slushy condition of soil)
including depositing the excavated stuffing uniform layers in canal bank Sorin spoil banks or a
sand were directed including dressing the canal section up to lead of 50meter and all lift
including clearing the site etc. complete (By machinery for canal/drain maintenance) (up to
cumecs capacity of canal/drain)
Description as per item no
MODE OF MEASUREMENT AND PAYMENT:-
Payment shall be made at the rates for completed items of work tendered therefore in schedule-B on
cubic meter basis of actual work done. The rates shall include all expenditure on labour, materials,
equipment’s required for carrying out satisfactory work.
Providing & fixing in position sign board of standard size of 1.20mx0.90 m with M.S. angle
40mmx40mmx6mm with 3mm thick iron plate including fixing in 1:5:10 prop. Concrete block
size40cmx40cmx75 cm including painting existing data on the board etc. complete as directed.
1. Sign board shall be of good quality as approved by Engineer in Charge or concern authority.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
2. Sign board shall be 1.20 mt x 0.90 mt in size and finishing smooth surface on one side.
3. Engraving and painting of figures shall be done as per instruction it engineer-in-charge size of
letter and mater to be display shall be directed by engineer-in-charge.
4. Sign board shall be fix at appropriate place as directed by engineer-in-charge contractor shall bear
all cost of materials, labour & fixing plate in position.
MEASUREMENTS AND PAYMENTS
The measurement and payment shall be paid No. basis.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Name Constructing Protection wall & Providing, Supplying, fixing in position 1600 mm dia
of RCC NP3 Pipe for Storm Water Drainage at NA Panoli GIDC-(Chainage-43040 Nr.
work Bajaj Healthcare Ltd.)
QTY. ITEM RATE UNIT AMOUNT
Jungle cutting for preliminary survey light jungle
cutting (bushes, hedges) in wet condition also,
including demarcation, marking alignments,
points supervision etc. complete.
Dismantling the C.C. lining including disposing
131.64 off the dismantled materials as directed etc. 87.00 Sq.mt
complete.: 7.5 mm thick
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft & hard
marram, etc. dry condition including depositing
the excavated stuff in uniform layers in bank sor
as directed etc. complete for lead of to 1.0 Km and
all lifts. (By machinery)
Dewatering the foundation trenches during
excavation of canals, drains, foundation tranches,
concrete, masonry etc. till completion and
diversion of surface and sub surface water by
using pumps of suitable capacity either diesel or
electrical driven including cost of labour,
pipelines etc. For delivery distance beyond
Providing and laying dry rubble pitching of
various thickness to required grade including
trimming of earthwork, hand packing the
interstices with spauls, filling earthing interstices
paneling complete for all leads and lifts. (a)
Providing and laying plain/reinforced Nominal
Mix cement concrete of various grade with
cement, sand and coarse aggregates including
centering, shuttering, batching, mixing,
transporting, placing, vibrating, smooth finishing,
curing etc. complete for all lead and lift.
(Manually With Conventional Mixer, Excluding
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
6(A) Raft, Bottom slab of Barel, footing of columns,
54.00 piers, abutment and bottom slab of sump etc. (i) M-15 4559.30 Cum
6 (B): Piers, abutment, wing walls, headwall, return
11.00 wall etc.(i) M-20 grade. (1:1.5:3) 5146.50 Cum
Providing & Supplying ISI standard RCC Pipe in
standard length of following class & diameter
suitable for collar OR rubber ring joints incl all
taxes. Loading, unloading, stacking etc. all
Class NP3 Test Pressure 0.7 Kg/ Sm - 1600 mm
Providing and placing in position reinforcement
bars including cutting, bending welding, joints
where necessary, hooking etc. complete as per
drawing for all lead and lifts.
Lowering, laying & Jointing ISI standard RCC
Pipe in standard length of following class &
diameter in Proper position, Grade, and alignment
at all level as directed by engineer in charge incl.
all etc. all complete
Class NP3 Test Pressure 0.7 Kg/ Sm - 1600 mm
Filling in foundation and plinth with marram or
selected soil in layers of 20cm. thickness
including watering, ramming and consolidating
Providing and laying plain/reinforced cement
concrete lining of M-15 grade in bed, side slopes
and curvature including batching, mixing,
131.64 transporting glancing, smooth finishing, curing 478.20 Sm
including dewatering where enquired. (machinery
based without Paver). (b) 10.0 Cm thick lining in
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Excavation of canal/drains Nall sorts of soils
(including wet and slushy condition of soil)
including depositing the excavated stuffing
uniform layers in canal bank soring spoil banks or
8460.00 a sand were directed including dressing the canal 82.40 Cum
section up to lead of 50meter Andal lift including
clearing these etc. complete (By machinery for
canal/drain maintenance) (up to 1.5 cumecs
capacity of canal/drain)
Providing & fixing in position sign board of
standard size of 1.20mx0.90 m with M. Single
40mmx40mmx6mm with 3mm thick iron plate
1.00 including fixing in 1:5:10prop. Concrete block 3011.30 No
size40cmx40cmx75 cm including painting
existing data on the board etc. complete as
Add 1% for LWC Rs.
I/ We agree to carry out the above works at_____% above the estimated cost put to tender.
I/ We agree to carry out the above works at _____% below the estimated cost put to tender.
An amount of my tender work out as under
Amount put to tender Amount put to tender
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Important Note:
The rates offered shall be inclusive of all applicable taxes (1% LWC, ESIC, PF, packing,
1. forwarding, insurance, loading, unloading, shifting & transportation at store/ site of work at
Panoli Notified Area.)
The bidder is required to offer their bids at the rate Excluding of GST.
2. I/We have read the conditions mentioned in this tender & agree to abide by the same.
3. Please note that the agency in whose favor the tender is finalized by the competent authority
shall have to submit the document like insurance of the staff engaged RPFC No. Labour license
etc. and documents for vehicle.
4. Work is rquired to be completed within 01 Months. Liquidated damages shall be recovered as
per the provison of Agreement, for the delay in completion of work.
Defect liability of the part-B of schedule-B work is 24 Months from the actual date of
completion. Contractor has to repair/rectify the work within defect liability period at his own
5. The successful bidder in whose favor the tender is finalize by the competent authority has to
enter in to an agreement with Notified Area office in B-1 agreement form, the conditions &
clauses of the agreement shall be binding to the agency. If the bidder desires to study the same,
the same is available in the office of the Notified Area Officer, GIDC, and Panoli during office
hours of the working days
6. 1% labour welfare cess on the bill amount will be deducted from each RA bill as per Govt.
7. Agency has to pay ESI / Professional Tax/PF etc. as per Govt. norms. Agency has to submit
the photocopy of challan of ESI and PF paid at every month. If the same is not submitted by
the agency, ESI /Professional Tax/PF deducted from the RA Bill by the NAO. Payable amount.
Sign of Contractor Chief Officer
N.A, GIDC, Panoli
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
B1 Agreement - Part 01.pdf
B1 Agreement - Part 02.pdf
Tender-DTP.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .