Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,396.95Accepted-AOC | ₹84,396.95 | L1 | Accepted-AOC Lowest rate and hence the work is awarded to the Contractor vide Resolution No. /Order No.3(1) Dtd 17/02/2026 of PothukalluGrama Panchayat |
| 2 | L2₹97,055.94Rejected-Finance 1507 SUB TREASURY NILAMBUR | KANNUR | KERALA | 670612 | ₹97,055.94 | L2 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | SAMSON M JOHN L2 | SHAIJU A S L1 |
|---|---|---|---|---|---|
| 1.00HAND RAIL FOR BRIDGE | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.33 | cum | 3,878.61 ₹1,264.43 | 3,372.7 ₹1,099.50 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.92 | cum | 10,524.86 ₹9,714.45 | 9,152.05 ₹8,447.34 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17.7 | sqm | 407.89 ₹7,219.65 | 354.69 ₹6,278.01 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 200 | kilogram | 118.75 ₹23,750 | 103.26 ₹20,652 |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 21.51 | sqm | 390.57 ₹8,401.16 | 339.63 ₹7,305.44 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 21.51 | sqm | 85.4 ₹1,836.95 | 74.26 ₹1,597.33 |
| 1.01 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 21.51 | sqm | 182.61 ₹3,927.94 | 158.79 ₹3,415.57 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 197.8 | kg | 188.47 ₹37,279.37 | 163.89 ₹32,417.44 |
| 1.01 | 13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture . | 14.44 | sqm | 253.53 ₹3,661.99 | 220.46 ₹3,184.32 |
Tender Value
₹84,397
EMD Value
₹2,110
Closing Date
10 Feb 2026, 10:00 amClosed
ASSISTANT ENGINEER
AE OFFICE LID EW POTHKALLU
Annual plan 2025-26, Handrail Work on Vellimuttam Idimukk Bridge, Pr.No 150/2025-26 Pothukal GP-
2026_LSGD_831989_15
03/AE/LID EW/PKL/2025-26
Open Tender
Civil Works - Bridges
180 days
AE OFFICE POTHKALLU GP
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹2,110
Yes
5 Mar 2026
31 Jan 2026
12 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
HAND RAIL FOR BRIDGE
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1398661.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_1398661.xls
BOQ • 0.30 MB
150.rar
Tender Documents • 2.72 MB
Download all tender documents and submit your bid