Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11 LAccepted-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹11 L | L1 | Accepted-Finance L1 |
| 2 | L2₹11.5 L+₹50,000 (4.55%)Rejected-Finance | ₹11.5 L+₹50,000 (4.55%) | L2 | Rejected-Finance L2 |
| 3 | L3₹12.0 L+₹99,000 (9.00%)Rejected-Finance | ₹12.0 L+₹99,000 (9.00%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT Conditions |
| Sl No | Description | Qty | Unit | Manoj Kumar L1 | Dharam Pal L3 | Rajinder Kumar Thakur L2 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Suin Surhar whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 11,00,000 ₹11,00,000 Lowest | 11,99,000 ₹11,99,000 | 11,50,000 ₹11,50,000 |
| 2.00 | Description of main components of the scheme is as under:-
Civil Works: 2 Nos Pump House, Sump well, Perculation well.
Rising main:LWSS Suin Surhar
Booster Stage 80mm dia=40rmt,1st Scheme: 1st stage 80mm dia 2170 Rmt. 2nd stage 65mm dia= 630 Rmt.
Pumping Machinery:
LWSS Suin Surhar
1st Scheme: Booster stage 1x2HP=2 HP, 1st stage 2x40=80 HP,2nd Stage2x25=50 HP
.Approximate length of distribution system: = 26.70 Km
No of storage tanks=4 Nos , Nos of habitation= 10 Nos, Total working hours 37.30 hours - through 6 Nos. of person (PO=2 Nos. and Beldar/Helper=3 Nos and Chowkidar= 1 No)
Indicators to be monitored
(i) No of cmplaints recevied through different mode such as C.M sanklap, E. samadhan, complaint register etc.
(ii). Quantity of water lifted per day.
(iii). No of pumping hours per day and energy consumtpion per day | - | - | - | - | - |
Tender Value
₹10.4 L
EMD Value
₹20,890
Closing Date
29 Jul 2026, 5:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH Deployment of manpower Operation of pumping machinery and distribution system of water supply for sector storage tank to different habitation for one year)
2026_HPIPH_139433_1
NIT 5122-5221 dt 18.07.2026
Open Tender
Repair and Maintenance Works
Item Rate
365 days
Jukhala
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
₹20,890
Yes
6 Aug 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Suin Surhar whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 100 | ₹100 |
| 2 | Description of main components of the scheme is as under:-
Civil Works: 2 Nos Pump House, Sump well, Perculation well.
Rising main:LWSS Suin Surhar
Booster Stage 80mm dia=40rmt,1st Scheme: 1st stage 80mm dia 2170 Rmt. 2nd stage 65mm dia= 630 Rmt.
Pumping Machinery:
LWSS Suin Surhar
1st Scheme: Booster stage 1x2HP=2 HP, 1st stage 2x40=80 HP,2nd Stage2x25=50 HP
.Approximate length of distribution system: = 26.70 Km
No of storage tanks=4 Nos , Nos of habitation= 10 Nos, Total working hours 37.30 hours - through 6 Nos. of person (PO=2 Nos. and Beldar/Helper=3 Nos and Chowkidar= 1 No)
Indicators to be monitored
(i) No of cmplaints recevied through different mode such as C.M sanklap, E. samadhan, complaint register etc.
(ii). Quantity of water lifted per day.
(iii). No of pumping hours per day and energy consumtpion per day | - | - | 100 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
PWD6.pdf
Tender Documents • 0.68 MB
PWD8.pdf
Tender Documents • 1.42 MB
TC6.pdf
Additional Documents • 0.53 MB
BOQ_206665.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .