| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | ₹12.1 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹12.1 L+₹605.35 (0.05%)Rejected-AOC | ₹12.1 L+₹605.35 (0.05%) | L2 | Rejected-AOC Highest Rate |
Tender Value
₹14.3 L
EMD Value
₹29,000
Closing Date
6 May 2026, 12:00 pmClosed
E.E. R.E.D. Division Azamgarh
R.E.D. Department Viakas Bhawan Azamgarh
Interlocking work from Dilip Maurya house to Pramod Singh tubewell in Gram Sabha Zamin Dashav of Atraulia development block-50
2026_REDUP_1142965_1
2172/RED/Tender/ST/2025-26 Dt 28.03.2026
Open Tender
Civil Works
Fixed-rate
90 days
AZAMGARH
Please Refer Tender Document
3 documents required · 3 mandatory
₹1,106
₹29,000
22 Jul 2026
29 Apr 2026
6 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
29 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Cutting or in embankment in ordinary soil excation to be in the form of regular pits not exceeding 0.5m in depth etc As per SINo- 253 | 365.08 | CuM | 163.02 | ₹59,515.34 |
| 2 | Excavation for foundation in ordinary soil including normal lead and lift with al completion of work and including disposal upto three chain minimum As Per SINo- 251 Schedule Rate | 85.67 | CuM | 104.5 | ₹8,952.52 |
| 3 | Concrete with 40mm gauge brick ballast/ stone ballast, f/sand & cement inproportion of 12:6:1 in foundation and under floors including supply of all materials, labour and T & P etc. required for proper completion of the work As Per SINo- 273 | 42.51 | CuM | 2,992.5 | ₹1,27,211.17 |
| 4 | First class b/w in 1:4 in cement and fine sand mortar in foundation and plinth including supply of all materials labour and T& P etc required for proper completion of work as Per SINo- 305 (b) | 62.72 | CuM | 6,540.75 | ₹4,10,235.84 |
| 5 | 25MM thick CC 1:2:4 cement coarse sand and stone grit I/c all completion as per SINo- 279 (b) | 118.8 | SqM | 261.25 | ₹31,036.5 |
| 6 | 80 MM thick Zig Zagged shaped mechanically shaped interlocking I/C all completion as per UP PWD SOR | 668.8 | CuM | 774.25 | ₹5,17,818.4 |
| 7 | 12mm thick cement plaster in 1:4 cement and sand loltar including supply of all material, labour and T &p etc. required for proper completion of work as per SINo- 584A Schedule Rate for fine sand | 62.9 | SqM | 137.75 | ₹8,664.48 |
| 8 | Supply and fixing of 110 mm dai PVC Pipe (I.S.I) Mark for cross drainage including all matterial labour etc at site | 3 | R/M | 209.95 | ₹629.85 |
| 9 | R.C.C. Work with cement aproved coarse sand and 20mm gauge aproved stone grit in the proportion of 1:2:4 in slab excluding supply of reinforcement and its bending but I/C its fixing and binding the same with 248 W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material labour and TP etc. required for proper being included in the item as per SINo- 284 | 0.34 | CuM | 7,695 | ₹2,616.3 |
| 10 | Mild steel or Iron plain work of small and section Such as holding down bolts hold fast tie rods grating etc (when not included in over all rates ) wrought torequired from including supply of steels and its wastage including all completion work as Per SINo- 502 | 0.29 | Qtl | 5,082.5 | ₹1,473.93 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_2134722.xls
BOQ • 0.36 MB
T1.pdf
Tender Documents • 1.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .