Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹2.4 L
EMD Value
₹4,731
Closing Date
6 Mar 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Prodhan Saptibari - I GP
Saptibari Maynaguri
INSTALLATION OF DRINKING WATER UNIT AT UPENER BARI ICDS CENTRE UNDER SAPTIBARI-I
2026_ZPHD_1015959_7
003/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Saptibari- I GP area
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
5721101000146 CNRB0005721
₹4,731
22 May 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
PWD S & P Schedule, Page No. 49, Item No. 1(d) Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia. (i) 50 mm dia. boring etc.
(ii) 100 mm dia. boring etc. top enlargement.
PWD S & P Schedule, Page No. 52, Item No. 6 Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications. (i) 50 mm dia.
(ii) 100 mm dia.
PWD S & P Schedule, Page No. 13,14, Item No. 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (A)i) PVC Pipes (Dia) 50 mm
(A)ii) PVC Pipes (Dia) 100 mm
PWD S & P Schedule, Page No. 54, Item No. 17(i) Supplying, fitting and fixing heavy type bell mouth reducing socket. 50 mm X 100 mm
PWD S & P Schedule, Page No-55/Item No. 24 Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea size washed gravel of approved quality having size from 2 mm to 5 mm or the size approved by the Engineer-incharge including cost of all materials labour and equipment complete.
PWD S & P Schedule, Page No. 55, Item No. 27 Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and plants and scaffolding as required.
PWD S & P Schedule, Page No-55/Item No. 23 Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction.
PWD S & P Schedule,Page - 37/Item No. -6 Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer. 1000 litre capacity
PWD S & P Schedule, Page No.-37/Item No. 10 Labour for hoisting plastic water storage tank. Upto 1500 litre capacity. Upto 1st story from G.L.
PWD S & P Schedule, Page No-38/Item No. 13 Labour for punching hole in plastic water storage tank upto 50 mm dia.
PWD S & P Schedule,Page - 29 / Item No. -20 Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. For Exposed Work CPVC Pipes Class-2,SDR-13.5 From Storage Tank to Stand Post. 25 mm (dia) for supply connection
PWD S & P Schedule, Page - 7 / Item No. -7. f(ii) Supplying, fitting and fixing bib cock or stop cock. Polythene Bib Cock / Stop Cock with plastic inlet (EMCO / ATLAS or equivalent) 15mm.
PWD S&P SCHEDULE, Page- 13 / Item No.- 19(II) Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials ,jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.) PVC Pipes :: (Dia) 32 mm for riser pipe
PWD S & P Schedule, Page No. 53, Item No. 12(vi) Supplying, fitting and fixing check valve (horizontal) G.M. tested to 21 kg per sq. cm. 50 mm
PWD S & P Schedule, Page No. 56, Item No. 27 Supplying, fitting and fixing 300 mm M.S. housing clamp of approved quality.
PWD Building SCHEDULE, Page - 1 / Item No. -2 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The Item No. includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1.500 mm.
PWD Building SCHEDULE, Page - 35 / Item No. -22. II) (3rd Corrigenda) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor 1:3:6 proportion.
PWD Building SCHEDULE,Page - 26 / Item No. -10. ii) (3rd Corrigenda) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree
PWD Building SCHEDULE,Page - 42-43 / Item No. -36. Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation.
PWD Building SCHEDULE,Page - 43 / Item No. -40. (10th Corrigenda) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m. Tor steel/Mild Steel, III. OTHER MANUFACTURERS NOT SPECIFIED.
PWD Building SCHEDULE, Page - 7 / Item No. - 15) iv) (3rd Corrigenda) Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
PWD Building SCHEDULE, Page - 189 / Item No. - 1) iv) (3rd Corrigenda) Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] With 1:6 cement mortar 15 mm thick plaster.
PWD Building SCHEDULE, Page - 192 / Item No. - 15) Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cu.m per100 sq.m.
PWD Building SCHEDULE, Page - 64 / Item No. - 35) iv) (3rd Corrigenda) Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall : With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative.
PWD Building SCHEDULE, Page - 101 / Item No. - 2A (3rd Corrigenda) M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For roof truss works. a) Span up to 12 Mtr
PWD Building SCHEDULE,Page - 200/Item No. -1. a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. On steel or other metal surface : With super gloss (hi-gloss) - Two coats (with any shade except white)
PWD Building SCHEDULE,Page - 200 / Item No. - 2. b) iv) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface : With super gloss (hi-gloss) - Two coats (with any shade except white)
Local Market LS Rate : Construction of soak pit by 900mm dia x300mm height precast concrete ring 3 nos with 900mm dia RCC cover with necessary connection earth work all complete.
WRI &DD SCHEDULE, Chapter-12.00, Page - 1 / Item - 1(a) Solar Module : Supply, transport , installation and commissioning of ISI marked Solar Modules as per following specification 1. Cell : Indigenous mono crystalline silicon SPV cells. 2. Solar Modules: Monocrystalline cell with PERC technology / module with bifacial cell. 3. Standards: ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710. 4. Modules must qualify to IS 170210(Part 1) 5. Min Efficiancy: 19.5% 6. Fill Factor: More than 75% 7. Modules wattage mismatch in the SPV array: within (+/-)3% 8. Wattage output warranty: Should not be less than 90% at the end of 10 years and 80% at the end of 25 years. 9. The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificate also to be supplied. For details information please see Cl. no. 2.1 of technical specification. a) For 1 HP Off-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/ bifacial SPV modules- 900-1200 Wp.
WRI &DD SCHEDULE, Chapter-12.00, Page - 1 / Item - 2 Module Mounting Structure ( For 1 HP, 2HP, 3HP, 5HP and 10HP Solar Water Pumping System) : Supply, transportation & installation of G.I. manual tracking / Fixed structure made of MS hollow sections, pipes, plates, angles, etc as per IS: 4923, IS: 1161/1239, IS: 1079/2062, to hold min 300Wp SPV Module as per drawing and technical specification. The steel structure is to be protected with minimum 80 micron galvanisation (hot dip) and provided with fixed arrangement or dual axis manual tracking arrangement for three times in a day and seasonal tilting to face the sund optimally. The approximate weight of the Module Mouning Structure given in Clause no. 5.1 should be followed.
WRDD SCHEDULE,Page - 114 / Item - 2(i) Supplying , fitting and fixing of Sand Filter - Manual as per IS:14606 Sand Filter :: 10 m³/ hr-M Single
WRDD SCHEDULE,Page - 77 / Item – 18 Supplying 1 m × 0.6 m × 24 swg MS board containing list of spout wise water users by making numbers of spout as directed by EIC. The board should have base colour - Black and words - White to be fitted and fixed on the wall of the pump house. (Signboard regarding Work details)
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_2495870.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .