Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-Finance 5 A WEST REST CAMP DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.8 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.8 Cr+₹1.5 L (0.86%)Accepted-Finance 250 SARTHI VIHAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.8 Cr+₹1.5 L (0.86%) | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | M/S HimalayanConstruction L2 | doon associates L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 3,842.8 | Cum | 385 ₹14,79,478 Lowest | 385 ₹14,79,478 Lowest |
| 2.00 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 338 | Cum | 4,800 ₹16,22,400 | 4,770 ₹16,12,260 Lowest |
| 3.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) | 187.5 | Cum | 6,350 ₹11,90,625 | 6,293 ₹11,79,937.5 Lowest |
| 4.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | 2,063.81 | Cum | 4,200 ₹86,68,002 | 4,156 ₹85,77,194.36 Lowest |
| 5.00 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11 | 1,090 | Rmt. | 435 ₹4,74,150 | 432 ₹4,70,880 Lowest |
| 6.00 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 1,182 | Sqm | 79 ₹93,378 | 78 ₹92,196 Lowest |
| 7.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 905.3 | Cum | 1,020 ₹9,23,406 | 1,010 ₹9,14,353 Lowest |
| 8.00 | Providing concrete for plain/ reinforced concrete Nominal mix 1:3:6 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 580.5 | Cum | 5,770 ₹33,49,485 | 5,724 ₹33,22,782 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹4.2 L
Closing Date
27 Apr 2026, 4:00 pmClosed
SE PROJECT CIRCLE DEHRADUN
OFFICE OF SUPERINTENDING ENGINEER PROJECT CIRCLE DEHRADUN
Construction of protection walls and execution of flood protection works including CC blocks at various locations on Nalapani Rao Aamwala Rao Rispana River Dulhani River Kiduwala in Raipur underCMAnnNo 740/ 2021 SDMF JOB2 Aamwala Rao and NalapaniRao
2026_IRDCE_93890_8
27/SE/2025-26 Dated 23.03.2026
Open Tender
Civil Works
Item Rate
90 days
Dehradun
AS PER STANDARD BIDDING DOCUMENT
2 documents required · 2 mandatory
₹5,900
EE INVESTIGATION AND PLANNING DIVISION DEHRADUN
₹4.2 L
OFFICE OF SE PROJECT CIRCLE DEHRADUN
27 May 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - |
| - | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | - | Cum | - | - |
| - | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) | - | Cum | - | - |
| - | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | - | Cum | - | - |
| - | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11 | - | Rmt. | - | - |
| - | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | - | Sqm | - | - |
| 7 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | Cum | - | - |
| 8 | Providing concrete for plain/ reinforced concrete Nominal mix 1:3:6 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
jobeightsbd.pdf
Tender Documents • 2.25 MB
BOQ_111140.xls
BOQ • 0.39 MB
cori.pdf
PDF • 0.30 MB
Tendernoticen27.pdf
PDF • 0.25 MB
corriflood.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .