Tender Value
₹78.0 L
EMD Value
₹78,000
Closing Date
21 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Devbhoomi Dwarka (R&B) Division, Khambhalia
Construction of Compound/Boundry Wall Around ITI Building (Wire Fencing Gate and Cattle Trap ETC) At.Dwarka Dist Devbhoomi Dwarka
353032
16 of 2026-27
Open
Civil - All
Works
Devbhumi Dwarka
4 documents required · 4 mandatory
₹2,400
Executive Engineer, Devbhoomi Dwarka R&B Division, Khambhalia
₹78,000
7 Oct 2026
7 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
It. No. Quantity Unit Rate Amount
book of specifications)
In figures In words
1 Demolition of Brick work and stone masonry In Cement Mortar. 586.00 Cum. 562.89 Rupees Five Hundred Sixty
including stacking of serviceable materilas and disposal of Two And Paise Eighty Nine
unserviceable materials with all lead and lift. Only
2 Demolition of Cement concrete.and disposal of unserviceable 74.00 Cum. 623.01 Rupees Six Hundred Twenty
materials with all lead and lift. Three And Paise One Only
3 Dismentling steel work including distempering and stacking the 3036.00 Kgs. 3.84 Rupees Three And Paise
materials with all lead and lift. Eighty Four Only
4 Dismentaling of G.I. sheet roofing including ridges, Hips, Valleys, 465.00 Sqm. 49.11 Rupees Forty Nine And
Gutters etc. stacking of serviceable materilas and disposal of Paise Eleven Only
unserviceable materials with all lead and lift.
5 Removing and scraping of old deteriorated plaster of any thickness 120.00 Sqm. 19.88 Rupees Nineteen And Paise
fromm wall / R.C.C member including stacking of serviceable Eighty Eight Only
material and disposal of unserviceable from site of work with all lead
6 Conveyance of building debris out side nagarpalika limit, transporting 546.00 Cum. 335.93 Rupees Three Hundred
with contractor's own venicle. Thirty Five And Paise Ninety
Three Only
7 Excavation for foundation in Hard Murrum including sorting out and 51.00 Cum. 267.08 Rupees Two Hundred Sixty
stacking of useful materials and disposing of the excavated stuff Seven And Paise Eight Only
with all lead and lift.
8 Excavation for foundation in Soft rock not requiring Blasting including 154.00 Cum. 278.06 Rupees Two Hundred
sorting out and stacking of useful materials and disposing off the Seventy Eight And Paise Six
excavated stuff with all lead and lift. Only
1 DTP Compound wall~BOQ SBD
9 Providing and laying cement concrete work 1:3:6 (1-Cement : 3- 74.00 Cum. 3639.03 Rupees Three Thousand Six
Coarse sand : 6-graded stone aggregates 20 mm nominal size) and Hundred Thirty Nine And
curing complete excluding cost of formwork and reinforcement for Paise Three Only
reinforced concrete work in Foundation and Plinth .
10 Providing and laying ordinary cement concrete 1:1.5:3 (1-Cement : 4.00 Cum. 4909.61 Rupees Four Thousand Nine
1.5-Coarse sand : 3-Graded stone aggregates) and curing complete Hundred Nine And Paise
including the cost of formwork but excluding the reinforcement for Sixty One Only
reinforced concrete work in Foundations, footings, Base of columns
and Mass concrete.
11 Providing and laying ordinary cement concrete 1:1.5:3 (1-Cement : 5.00 Cum. 9128.38 Rupees Nine Thousand One
1.5-Coarse sand : 3-Graded stone aggregates) and curing complete Hundred Twenty Eight And
including the cost of formwork but excluding the cost of Paise Thirty Eight Only
reinforcement for reinforced concrete work in Columns for Ground
12 Providing and laying ordinary cement concrete 1:1.5:3 (1-Cement : 1.00 Cum. 7013.44 Rupees Seven Thousand
1.5-Coarse sand : 3-Graded stone aggregates) and curing complete Thirteen And Paise Forty
including the cost of formwork but excluding the cost of Four Only
reinforcement for reinforced concrete work in FLOOR BEAM for G
13 Providing and laying ordinary cement concrete 1:1.5:3 (1-Cement : 1.00 0.00 7889.11 Rupees Seven Thousand
1.5-Coarse sand : 3-Graded stone aggregates and curing complete Eight Hundred Eighty Nine
including the cost of formwork but excluding the cost of And Paise Eleven Only
reinforcement for reinforced concrete work in SLAB for G F.
14 White Stone Bela mesonry block in course in foundation and plinth 345.00 Cum. 6157.98 Rupees Six Thousand One
with stone of approved quality in Cement Mortar 1:5 (1-Cement :5- Hundred Fifty Seven And
course sand) including packing the joints etc. complete. Paise Ninety Eight Only
15 White Stone Bela mesonry block in course in superstructure with 235.00 Cum. 6507.94 Rupees Six Thousand Five
stone of approved quality in Cement Mortar 1:5 (1- Cement :5- Hundred Seven And Paise
course sand) including packing the joints etc. complete. Ninety Four Only
2 DTP Compound wall~BOQ SBD
16 Providing and laying ordinary cement concrete 1:1.5:3 (1-Cement : 62.00 Cum. 4998.49 Rupees Four Thousand Nine
1.5-Coarse sand : 3-Graded stone aggregates and curing complete Hundred Ninety Eight And
including the cost of formwork but excluding the cost of Paise Forty Nine Only
reinforcement for reinforced concrete work in Wall caps/Coping
17 Providing TMT Bar FE 500D reinforcement for R.C.C. work including 7660.00 Kg. 77.28 Rupees Seventy Seven And
bending, binding and placing in position complete for ground floor. Paise Twenty Eight Only
18 Providing and fixing 100mm thick precast cement concrete jali or grill 61.00 Sqm. 850.42 Rupees Eight Hundred Fifty
1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate And Paise Forty Two Only
6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire
including roughening,cleaning, fixing and finishing in cement mortar
1:3 and curing complete.
19 20mm thick sand faced cement plaster on walls upto all Hight above 2952.00 Sqm. 315.68 Rupees Three Hundred
ground level consisting of 12mm thick backing coat of C.M. 1:3 (1- Fifteen And Paise Sixty Eight
cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement Only
: 1-sand) etc. complete.
20 Making decorative groove or border of any thickness and width for 2855.00 Rmt. 43.04 Rupees Forty Three And
design in plaster as directed by engineer in charge. Paise Four Only
21 Providing and laying decorative manglore tiles roofing over 20 MM 8.00 Sqm. 663.57 Rupees Six Hundred Sixty
thick average base of cement mortar 1 : 3 ( 1 cement : 3 Fine Three And Paise Fifty Seven
sand)laid over and jointed with colour cement slurry including Only
finishing and painting with weather proof exterior emulsion paint etc
22 Providing and fixing M.S. iron ornamented gate of required Patten 670.00 kgs 175.74 Rupees One Hundred
with M.S. Frame and Cast Iron Design including providing and fixing Seventy Five And Paise
hold fasts, hinges, roovas, Guard rail including one coat of primer Seventy Four Only
and two coats of oil painting etc. complete.
3 DTP Compound wall~BOQ SBD
23 Providing and fixing cattle trap of required size and design by 11.00 Sqm. 7745.69 Rupees Seven Thousand
providing GI pipes 80 mm dia at 14 cm c/c including providing “C" Seven Hundred Forty Five
channels 100x50x6 mm size including necessary excavation 15 CM And Paise Sixty Nine Only
thick CC 1:3:6 for foundation complete CC wall of CC 1:2:4 with
cement plaster 15mm thick in CM 1:3 etc. complete as directed by
Engineer – in – Charge.
24 Providing and fixing concertina coil fencing with punched tape 565.00 Rmt. 321.18 Rupees Three Hundred
concertina coil 600 mm dia 10 metre openable length ( total length Twenty One And Paise
90 m), having 50 nos rounds per 6 metre length, upto 3 m height of Eighteen Only
wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart
and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with
G.I. staples and G.I. clips to retain horizontal, including necessary
bolts or G.I. barbed wire tied to angle iron, all complete as per
direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) /
Spring core (2.5mm thick) wire of high tensile strength of 165 kg/
sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost
of M.S. angle, C.C. blocks shall be paid separately)
25 Providing Galvanised mild Steel work, welded in built up sections 3467.00 Kg. 102.01 Rupees One Hundred Two
framed work including cutting, hoisting, fixing in position and And Paise One Only
applying a priming coat of red lead paint. (A)In beams and joists,
channels angles Tees, flats, with connecting plates or angle cleats
as in main and cross beams. Hip and jack rafters, purlins conneted
to common rafters and the like
26 Finishing Wall with Weather Proof Exterior Emulsion Paint on Wall 2952.00 Sqm. 120.26 Rupees One Hundred
Surface (Two Coats) to give an required shape even shade after Twenty And Paise Twenty
thoroguhly brushing the surface to remove all dirt, and remains of loose Six Only
powdered materials etc. complete
27 Finishing with Epoxy paint Two coats) at all prepared and applied as per 159.00 Sqm. 206.91 Rupees Two Hundred Six
manufacturer's specifications including appropriate priming coat, And Paise Ninety One Only
preparation of surface, atc. Complete.
TOTAL OF CIVIL Work Rs.
4 DTP Compound wall~BOQ SBD
Rupees in words: Rupees Seventy Seven Lakh(s) Ninety Five Thousand Eight Hundred
Forty Eight And Paise Thirty Seven Only
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in figures and words) of the estimated rate mentioned
above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct……………..…% below….......................................................... Add………………….% Above….....................................................
In words In words
Signature of Contractor Deputy Executive Engineer Executive Engineer
R & B Sub-Division Devbhoomi Dwarka R & B Division
Dwarka Khambhaliya
BOQ NOTES:-
1 All works shall be carried out as per latest MORTH Specification Booklet and other specification of Division as directed.
2 All Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site
moisture, weather etc.
3 Bidders are advised to visit the site & make himself / themself aware of the scope & specification of the work to be done & of conditions and other factors bearing on the
execution of the work before on line submission of his / their bids. Once the bid is finalized, under no circumstances arguments for crust deficiency / additional / altered
works will be heard until & unless Engineer in charge deem so. Engineer in charge shall have right to reject & decision of Engineer in charge shall be final & binding.
4 1.00 % of Construction cost shall be deducted form Bill. Amount of Contract as per the Building and other Construction worker's welfare cess Act - 1996 (Labour &
Employment Department Letter No. CWA - 2004 - 1831 - M (3). Dt. 9-12-05, Notification of Labour & Employment Department Dtd. 03-01-05 and Labour &
Employment Department letter No. CWA / 2004-841-M(3), Dt. 14-12-05).
5 Testing of material shall be done as per statement attached with specification. The material should be tested in GERI or Private laboratory approved by Govt. of
Gujarat. Bill for testing charges should be paid by Executive Engineer and computed after deducting the cost of materials to be supplied by the Govt. and shall be
recovered from the contractor's running bill as per Govt., R&B Department No. TNC-1085/(4)/C dtd 20-12-91.
5 DTP Compound wall~BOQ SBD
6 For Tender cost more than Rs. 2.50 lacs, 2% (percent) Tax deduction at source shall be made (which includes 1% (one percent) for GST & 1% (one percent) for
CGST) as per Govt. of Gujarat, Finance Deptt.'s Circular No. : GST/1017/ 1097/GST Cell, Dtd. 15/09/2018 & above Circular details to follows.
7 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate mentioned in all the tender.
8 The contractor shall exhibit a board as per Government Circular No. Vernacular TNC/1090/ 24/S dated 05.03.2011 with details specifications and details
of works and amount involved at site at his own cost as directed by Engineer-in-charge.
9 GST will be paid extra as per Govt. Emendment.
10 GST and Income tax will be deducted at source while making payment of bills.
Signature of Contractor Deputy Executive Engineer Executive Engineer
R & B Sub-Division Devbhoomi Dwarka R & B Division
Dwarka Khambhaliya
6 DTP Compound wall~BOQ SBD
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GR.pdf
nivida no 16 (2).pdf
1) SBD Book Compound wall ITI Dwarka.pdf
3) Test Sch. Compound wall ITI Dwarka.pdf
4) Spec. Compound wall ITI Dwarka.pdf
5) BOQ Compound wall ITI Dwarka.pdf
6) DWG COMPOUND WALL - ITI DWARKA.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .