Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC Lowest quoted bidder L1 |
| 2 | L2₹1.7 LRejected-AOC | ₹1.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹1.9 LRejected-AOC | ₹1.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹2.0 LRejected-AOC | ₹2.0 L | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-incompletely filled forms and no signature in integrity pact |
| Sl No | Description | Qty | Unit | J PALLIKUNHI L3 | KHALANDER SHAFI B L2 | MOHAMMED HANEEF L4 | P.MOHAMMED HANIEF L1 |
|---|---|---|---|---|---|---|---|
| 1.00APPENDIX A: CLOSING VENTS FOR THE YEAR 2025-2026 | |||||||
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 3.84 | sqm | 104.15 ₹399.94 | 91 ₹349.44 | 105.36 ₹404.58 | 88.37 ₹339.34 |
| 1.00 | OD12131/2025-2026:Engaging Man mazdoor for removal of rubbish, grass, brush wood, trees and saplings etc from the structures up to a distance of 50 m outside the thodu, conveying the shutter planks from the store shed and fixing in position and making ready for filling dry mud, lowering the mechanical shutters, removing the waste and rubbish from the canal during water distribution etc. complete | 80 | each | 839.89 ₹67,191.20 | 810 ₹64,800 | 849.66 ₹67,972.80 | 712.64 ₹57,011.20 |
| 1.00 | OD12130/2025-2026:Supplying and laying polythene sheets(400G) for making the bund water tight including cost,conveyance labour charges etc. complete | 147.84 | sqm | 25.93 ₹3,833.49 | 22 ₹3,252.48 | 26.23 ₹3,877.84 | 22 ₹3,252.48 |
| 1.00 | OD12132/2025-2026:Supplying and filling dry mud in between shutter planks already fixed including all cost etc. complete | 76.18 | cum | 528.05 ₹40,225.26 | 300 ₹22,853.10 | 534.19 ₹40,692.99 | 448.04 ₹34,130.34 |
| 2.00APPENDIX B: OPENING VENTS FOR THE YEAR 2026 | |||||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 76.18 | cum | 199.95 ₹15,231.59 | 165 ₹12,569.21 | 202.27 ₹15,408.32 | 169.65 ₹12,923.43 |
| 2.00 | OD12133/2025-2026:Tarring with best coal tar one coat to old wood work including all cost ,conveyance, labour charges etc. complete | 359.23 | sqm | 25 ₹8,980.75 | 22.05 ₹7,921.02 | 26.38 ₹9,476.49 | 22.13 ₹7,949.76 |
| 2.00 | OD12457/2025-2026: Engaging Man mazdoor for removing shutter planks from the cross bar, clearing and conveying carefully and stacking in store shed at places pointed out by the departmental officers at site | 70 | each | 839.89 ₹58,792.30 | 820 ₹57,400 | 849.66 ₹59,476.20 | 712.64 ₹49,884.80 |
Tender Value
₹2.4 L
EMD Value
₹5,910
Closing Date
15 Oct 2025, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Minor Irrigation Subdivision, Manjeshwar - 671323
GENERAL-AM 2025-26-Annual maintenance of Uppala Anicut in Meenja village of Meenja Panchayath for the year 2025-2026-General Civil Work
2025_Irrig_804696_1
IRR/IA/TR/3878/2025_5_1_1/1
Open Tender
Civil Works - Others
365 days
Uppala
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,910
Yes
22 Dec 2025
3 Oct 2025
17 Oct 2025
3 Oct 2025
15 Oct 2025
3 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1339026.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid