| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.5 Cr+₹2.6 Cr (66.2%)Admitted-Finance 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹6.5 Cr+₹2.6 Cr (66.2%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per approved TBOO |
| 4 | Rejected-Technical DEVELOPMENT OF A SITE RO AT RAVI UDGIR DEGLOOR STRETCH DIST NANDED UNDER MAHARASHTRA STATE OFFICE | - | - | Rejected-Technical As per approved TBOO |
| Sl No | Description | Qty | Unit | GARG & GARG CO L2 | Messrs Tama Fabrication Works L1 |
|---|---|---|---|---|---|
| 1.00DESIGN AND CONSTRUCTION OF RAISING OF HEIGHT OF EXISTING DEPARTMENTALLY CONSTRUCTED ABUTMENT FROM RL 1266.653 TO 1269.200 AND 40.00 MTR SPAN STEEL SUPERSTRUCTURE (THROUGH TYPE) MAJOR PMT BRIDGE OVER DOYA NALLAH AT KM 31.100 ON ETALIN-MALINYE ROAD UNDER 1446 BCC UNDER 752 BRTF UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE | |||||
| 1.01 | DESIGN AND CONSTRUCTION FOR RAISING HEIGHT OF ABUTMENT AS PER GAD INCLUDING NECESSARY ALTERATION OF DEPARTMENTALLY CONSTRUCTED ABUTMENT, CONSTRUCTION OF ABUTMENT CAP AND INCLUSIVE OF ALL WORKS AS REQUIRED. | 1 | Nos | 70,00,000 ₹70,00,000 | 50,00,000 ₹50,00,000 Lowest |
| 1.02 | DESIGN AND CONSTRUCTION OF STEEL SUPERSTRUCTURE(THROUGH TYPE) OF MAJOR PMT BRIDGE OF 40 MTR SPAN OVER DOYA NALLAH AT KM 31.10 ON ETALYNE-MALINE ROAD WITH FOOTPATH INSIDE MAIN GIRDER IMNCLUDING LOAD TESTING OF SUPERSTRUCTURE AS SPECIFIED INCLUDING ALL PREPATORY WORKS, PROCUREMENT AND FIXING OF BEARINGS WITH PEDESTAL, DESIGN AND CONSTRUCTION OF STAGING WORKS (AS REQUIRED), SUPERSTRUCTURE INCLUDING LAUNCHING/ERECTION IF REQUIRED, WEARING COAT HAVING NON SKID SURFACE,STRIP SEAL EXPANSION JOINT, RCC CRASH BARRIERS,RAILING,GUARD POST,DRAINAGE ARRANGEMENTSOVER CARRIAGEWAY,PAINTING OF ALL EXPOSED STEEL SURFACE AND RCC SURFACE,PROTECTIVE WORKS,TEMPORARY RIVER TRAINING WOPRKS AND DIVERSION AND ALL OTHER ITEMS OF WORK REQUIRED AND NECESSARU TO COMPLETE CONSTRUCTION OF BRIDGE | 1 | Nos | 5,80,00,000 ₹5,80,00,000 | 3,41,00,000 ₹3,41,00,000 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹3.5 L
Closing Date
6 Oct 2023, 12:00 pmClosed
The Chief Engineer, Project Udayak
HQ CE (P) Udayak, C/O 99 APO, PIN 931715
Design and constr of raising of height of existing Dptly constructed abutment from RL1266.653 to 1269.2 and 40 mtr sss through type maj pmt br over Doya Nallah at km 31.1 on Etalin Malinye rd under 752 BRTF under Project Udayak
2023_BRO_618610_1
CE (P) Udayak/12/2023-24
Open Tender
Civil Works
Lump-sum
330 days
At Km 31.100 on Rd Etalin-Malinye Road
As per Tender Documents
6 documents required · 6 mandatory
₹0
₹3.5 L
Yes
HQ CE (P) Udayak, C/O 99 APO, PIN 931715
16 Nov 2023
14 Sept 2023
7 Oct 2023
14 Sept 2023
6 Oct 2023
27 Sept 2023
15 Sept 2023 - 25 Sept 2023
26 Sept 2023
Amount
DESIGN AND CONSTRUCTION OF RAISING OF HEIGHT OF EXISTING DEPARTMENTALLY CONSTRUCTED ABUTMENT FROM RL 1266.653 TO 1269.200 AND 40.00 MTR SPAN STEEL SUPERSTRUCTURE (THROUGH TYPE) MAJOR PMT BRIDGE OVER DOYA NALLAH AT KM 31.100 ON ETALIN-MALINYE ROAD UNDER 1446 BCC UNDER 752 BRTF UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE
DESIGN AND CONSTRUCTION FOR RAISING HEIGHT OF ABUTMENT AS PER GAD INCLUDING NECESSARY ALTERATION OF DEPARTMENTALLY CONSTRUCTED ABUTMENT, CONSTRUCTION OF ABUTMENT CAP AND INCLUSIVE OF ALL WORKS AS REQUIRED.
DESIGN AND CONSTRUCTION OF STEEL SUPERSTRUCTURE(THROUGH TYPE) OF MAJOR PMT BRIDGE OF 40 MTR SPAN OVER DOYA NALLAH AT KM 31.10 ON ETALYNE-MALINE ROAD WITH FOOTPATH INSIDE MAIN GIRDER IMNCLUDING LOAD TESTING OF SUPERSTRUCTURE AS SPECIFIED INCLUDING ALL PREPATORY WORKS, PROCUREMENT AND FIXING OF BEARINGS WITH PEDESTAL, DESIGN AND CONSTRUCTION OF STAGING WORKS (AS REQUIRED), SUPERSTRUCTURE INCLUDING LAUNCHING/ERECTION IF REQUIRED, WEARING COAT HAVING NON SKID SURFACE,STRIP SEAL EXPANSION JOINT, RCC CRASH BARRIERS,RAILING,GUARD POST,DRAINAGE ARRANGEMENTSOVER CARRIAGEWAY,PAINTING OF ALL EXPOSED STEEL SURFACE AND RCC SURFACE,PROTECTIVE WORKS,TEMPORARY RIVER TRAINING WOPRKS AND DIVERSION AND ALL OTHER ITEMS OF WORK REQUIRED AND NECESSARU TO COMPLETE CONSTRUCTION OF BRIDGE
GARG & GARG CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.88 MB
TDRDOYABR.pdf
Tender Documents • 1.19 MB
BOQ_692646.xls
BOQ • 0.28 MB
BRDrawing.pdf
Additional Documents • 29.71 MB
GADDoyaBridge.pdf
Additional Documents • 4.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .