Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.9 L+₹4.9 L (17.0%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹35.0 L+₹6.0 L (20.6%)Rejected-AOC KERALA INDIA 682030 | ERNAKULAM | KERALA | 682030 | L3 | Rejected-AOC L3 | |
| 4 | L4₹49.6 L+₹20.6 L (71.1%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹32.1 L
EMD Value
₹50,000
Closing Date
13 Mar 2020, 5:00 pmClosed
CHIEF EXECUTIVE OFFICER
Park Centre Technopark Campus Kariyavattom PO Trivandrum
Roofing Work for Covered Parking in Technopark Phase 1 Campus
2020_ETPK_347007_1
ETPK/PH1/T36/2019-20
Open Tender
Civil Works - Others
Item Rate
45 days
Technopark
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
online
₹50,000
16 Jun 2020
28 Feb 2020
16 Mar 2020
28 Feb 2020
13 Mar 2020
28 Feb 2020
28 Feb 2020 - 4 Mar 2020
Amount
Roofing Work for Parking
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Structural steel work riveted, bolted or welded in built up sections, base plate, Gusset plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing & fixing 16mm "J" type foundation bolt of length 450mm (NS Item) The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Supplying, Fabricating and fixing TATA 0.45mm trafod sheet with necessary nuts and bolts to fixing the sheet, including all labour and material costs, hire and labour for scaffolding, for vertical/ curved surface fixed with polymer coated J, L hooks or bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead or self reveting screw ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required etc. complete as per the drawing or the technical specification in the tender or as directed by the engineer in charge. The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Extra for bending 50mm dia 14 gauge pipe (NS Item) The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: Gutter (600 mm over all girth) The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing and fixing PVC 6" square pathy for rain water collection including material, labour charge for fixing and carrage of material etc. complete as per direction of Engineer in Charge. The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing and fixing PVC 6" square pathy drop for rain water collection including material, labour charge for fixing and carrage of material etc. complete as per direction of Engineer in Charge. The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2 The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
Cement plaster of mix: 1:6 (1 cement : 6 fine sand) with 12mm thick. The rate inclusive of all material charge, labour, transportation scaffolding (If needed) loading/Unloading at the work space etc complete as per the direction of engineer in charge.
U.R.RAJEEV
R. Sajikumar
TVK CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_486207.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .