| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L1 | Accepted-Finance I |
| 2 | L2₹1.4 Cr+₹80,861 (0.58%)Accepted-Finance 00 KANOONGOPURA NORTH MAHILA DISTRICT HOSPITAL BAHRAICH BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | ₹1.4 Cr+₹80,861 (0.58%) | L2 | Accepted-Finance III |
| 3 | L3₹1.4 Cr+₹98,483 (0.71%)Accepted-Finance CC 1 BOOTH NO 8 JANTA BHAWAN ROAD SIRSA SIRSA HARYANA 125055 | SIRSA | HARYANA | 125055 | ₹1.4 Cr+₹98,483 (0.71%) | L3 | Accepted-Finance II |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
5 Dec 2019, 3:00 pmClosed
Superintending Engineer
SE,EDC,Rudrapur
Replacement of ACSR Conductor by AB Cable area of 33/11KV. Sub Station, Matkota under EDD, Rudrapur.
2019_UPCL3_21025_1
EDC(USN)33/2019-20
Open Tender
Electrical Works
Item Rate
180 days
Rudrapur
Pl refer tender docuements.
3 documents required · 3 mandatory
₹11,800
SE,EDC,Rudrapur.
₹2.8 L
3 Jan 2020
14 Nov 2019
16 Dec 2019
14 Nov 2019
5 Dec 2019
14 Nov 2019
Amount
Supply of P.C.C. Pole ( 8.5 Mtr. Long )
Steel Tubelor Poles SP-33.
M.s. Angle 65x65x6mm(for bracket)@20Kg. Per bracket.
Stay Set 16x1800sq.mm.
Stay Wire 7/10SWG.
Earthing Rod. 20x2500mm.
Earth Wire 7/16 swg.
Cable 4x25sq.mm.( Insulated Lead)
L.T. Arial Bunched Cable 3x120+1x95+1x70sq.mm.
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120sq.mm to 120sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120sq.mm to 25sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )
Supply Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer ( Sintex make or other ISI mark reputed company ) with Panel Lock with key) ( As per drawing attached )
Supply of Dead End Clamps with I Hook. ( As per drawing attached ) & as per UPCL specification.
Supply of Suspension Clamp with I hook. ( As per drawing attached )& as per UPCL specification.
Supply of L.T. Bare Neutral connectors P.G. clamp, made of Aluminium 120sq.mm. to 25 sq.mm double bolt( For line to line) ( As per drawing attached )& as per UPCL specification.
Supply of Aluminium Lugs ‘O’ type size 25mm.( For connecting Cable PVC 4x25)
Supply of M.S.Stay Clamp made of M.S. flate for round pole SP-33 size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrs for Dead End Clamps assemble.painted by primers.
Supply of M.s. Half Clamp made of M.S. flate for P.C.C. Pole size 35x5mm. for Fixing of L.T. Distribution Board with suitable size nut & bolts without cracks & burrs, painted by primers.
Supply of M.s. Half Clamp made of M.S. flate for round pole SP-33 Pole size 35x5mm. for Fixing of L.T. Distribution Board with suitable size nut & bolts without cracks & burrs, painted by primers.
Supply of M.S. Clamp made of M.S. flate for P.C.C. Pole size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrs for Dead End Clamps assemble.painted by primers.
Supply of M.s. Clamps made of M.S. flate size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm) for Suspension Clamps assemble without cracks & burrs. Painted by primers.
Dismantling of old ACSR Conductor( Dog/Weasel)( L.T. Line) including Re- rolling back its conductor, wire, clamp, insulator etc .including stacking and transportation of material to the UPCL stores : 3 phase 4 wire.
Dismantling of old ACSR Conductor( L.T. Line) including Re- rolling back its conductor, wire, clamp, insulator etc .including stacking and transportation of material to the UPCL stores : 2 phase 3 wire.
Dismantling of old ACSR Conductor( L.T. Line) including Re- rolling back its conductor, wire, clamp, insulator etc .including stacking and transportation of material to the UPCL stores : 1 phase 2 wire.
Cartage of Small material including ABC Cable & XLPE Cable & conducor including Loading / Unloading of Small material from store centre at Haldwani approximate distance 05-70 KM.
Cartage of P.C.C. Pole 8.5 Mtr. Long. including Loading / Unloading from store centre at Haldwani approximate distance 05-40 KM.
Cartage of STP, SP-33 including Loading /Unloading from store centre at Haldwani approximate distance 05-40 KM.
Charges for fabrication/cutting of M.S. Angle jfor making bracket.
Laying , Stringing and sagging of AB cable size (3x120+ 1x95+1x16) including fixing of insulated piering connector, Dead end clamps with Eye Hook, Suspension clamp, Holding Clamps, in all complete work.
Erection & grouting of P.C.C. Pole8.5 Mtr. Long ( 180 kg. W/L )for reducing span of LT, ABC line including digging of pits 0.6x0.9x2.15 Mtr.grouting stone pad and making kiciking block in E&B And with fitting of all accessories & back filling with soil & boulder earthing complete work as per RESPO specification & as per direction of Engineer in charge : Single Pole
Erection & grouting of STP SP-33 for reducing span of LT, ABC line including digging of pits 0.6x0.9x2.15 Mtr.grouting stone pad and making kiciking block in E&B And with fitting of all accessories & back filling with soil & boulder earthing complete work as per RESPO specification & as per direction of Engineer in charge : Double Pole
Erection of stay set 16x1800mm. pit size 0.6x0.9x1.2 Mtr. as per specifications including 7/16SWG stay wire, binding, nozzling of stay with bcking filling of pit with CC 1:4:8 in bottom to pit in size 0.60.complete work stay set will be provided by UPCL.
Erection of M.S. Earthing Rod 20x2500 by way of digging of pit size 50x750x990mm deep of earth electrode in to 1000mm. below, found level fixeing and connection Connecting it with support by means of G.I. wire No7/16 SWG with Bolt & Nuts etc ( Earthing Rod & Earth wire will be provided by UPCL)
Laying & Fixing Insulated Cable 4x25 sq.mm. insulated Lead(Cable Supplied by UPCL)
Installation & Fixing of L.T.Distribution Box & Connection of L.T. consumer including all complete work.
Removal of previous connection & Re-connection of single phase L.T. consumer service connection.
Removal of previous connection & Re-connection of Three phase L.T. consumer service connection.
Shakti Enterprises
ASHOK KUMAR AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .