Improvement, Strengthing and Resurfacing B.M Road in Various Areas at Tharad Nagarpalika . Dist : Vav-Tharad SJMMSVY-UDP-88- 2023-24 Saving and 2024-25
334698
Tender Notice 2026-27
Open
Civil - All
Works
Banaskantha
3 documents required · 3 mandatory
₹2,832
Chief officer Nagarpalika Tharad
₹94,100
12 Aug 2026
12 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
No. But may be estimated
more or less In Figure in Words quantities
Scarifying gravelled macadam or bitumen macadam surface 6cm to 10cm
Rupees FourtyOne Paise Sixty
1.0 6790.00 depth including stacking useful materials on road side and disposing off 41.6 Sq.Mt
reremaining stuff
Preparing surface by Brushing with wire brushes for removing caked mud
etc. sweeping with brooms and finally fanning the cleaned surface with Rupees Seventeen Paise
gunney bags to remove all loose dirt etc.(ii) Black top surface. EightyEight Only
Box cutting the road surface to proper slope and camber for making
a base of road work including removing the excavated stuff and Rupees Two Hundred Fifteen
depositing on the road side slope as directed up to 50mts. Lead Paise SixtyTwo Only
Providing and laying W.B.M of B.T.M.C metal of size 45mm to 63mm size
Rupees Two Thousand
including 20% Gritt (Stone scrinning) & stone dust as filler including
4.0 103.00 2087.67 EightySeven Paise SixtySeven Cu.M
spreading watering & consolidation by vibratory roller 80KN to 100KN
static weight.
Providing,laying,spreading and compacting graded stone aggregate to
wet mix macadam spcification including premixing the Material with water
Rupees One Thousand Six
at OMC in mechanical mix plant carriage of mixed Material by tipper to
5.0 103.00 1642.11 Hundred FourtyTwo Paise Cu.M
side laying in uniform layers with paver in sub base / base course on well
Eleven Only
prepared surface and comacting with vibratory roller to achieve the desired
Providing and laying 50 mm thick bituminous macadam with B.T.
Aggregates as per M.O.R.T.& H gradation and Asphalt @ 2.50 Kg / 10 Sq
mt for tack coat on BT surfae, asphalt grade VG-30 {60/70} for mixing @
34.00 Kg. / M.T. i.e. 3.40% by total weight including heating the
Rupees Four Thousand Seven
aggregates and asphalt by continuous batching of drum mix plant and
6.0 860.00 4737.53 Hundred ThirtySeven Paise M.T
spreading the same by paver finisher and consolidation with vibratory
FiftyThree Only
roller 80 to 100 KN static weight including providing all materials,
equipments, tools and plant, oil, kerosene, firewood, labour charges etc.
comp. using contractor's own machineries, drum mix plant and paver
finisher etc. complete.
Quantity Total Amount
Quantity Total Amount
Estimated Rate
It. Estimated according to
Description of Item (in Rs.) Unit
No. But may be estimated
more or less In Figure in Words quantities
Providing and laying 25 mm thick (Compacted) Semi -dence Bituminous
concrete on exiting bitumious surface and using specified graded black
trapped amchine crushed aggregates with 5% Bitumen VG-30 grade
bitumen buy Wt of total mix as per MORTH specification including heating
and mixing of asphalt with B.T Chips in continuous bach mix plant and
Rupees Six Thousand Sixty
7.0 391.00 transfporting same at site and speading by sensor paver finisher and 6060.93 M.T
Paise NinetyThree Only
consolidation the same with pair of 8 tonnes to 10 tonnes vibratory roller
to achive desire density and including flusing the stone dust @
Cu.M/10 Sq.Mt including cost of required tolls plants, all machineries,
equipment fire wood oil, kerosene, charges etc complete
Providing and laying Painting on B.T surface with bitumen grade VG-30 at
the rate of 5.00 kg/10 Sq.Mt by mechanical spreyar and spreading the
Rupees FiftyFive Paise
8.0 6790.00 stone dust on prepared surface at the rate of 0.03 Cu.M /10 Sq.Mt and 55.55 Sq.Mt
FiftyFive Only
rolling with smooth wheeled and penumatic roller and brushing etc
Renovation of manhole by increasing the height at top including cost of
excavation, refitting of C. I. manhole frame and cover curing etc. complete
incl. all carting and providing of materials which is required for the purpose Rupees Three Thousand
9.0 29.00 (except manhole frame and cover) For all type manhole by providing RCC 3374 Three Hundred SeventyFour No.
1:2:4 Partition walls with required reinforcement 25 cm thick and circular Only
opening with 500mm clear dia and 0.40 mt. av. ht. With precast slab in
two parts 15 mm
RCC precast M.H. Frame & Cover Manufacture, supply & Delivery
at store or at site of work precast RCC M.200 Frame & cover
10.0 0.00 suitable to drainage M.H. and as per type design & Drawing 0
including cost of reinforcement M.S. Angles or Flate, curring mold
work etc. Heavy Duty 35 (perforated)
Frame suitable for 50cm opening of MH Rupees One Thousand One
Hundred TwentyOne Only
Cover suitable for 50cm opening of MH Rupees One Thousand One
Hundred SeventyThree Only
Demolition including stacking of serviceable materials and disposal Rupees One Thousand
11.0 123.00 of unserviceable materials with all lead and lift 1. R.C.C. work and lift 1082.35 EightyTwo Paise ThirtyFive Cu.M
Quantity Total Amount
Quantity Total Amount
Estimated Rate
It. Estimated according to
Description of Item (in Rs.) Unit
No. But may be estimated
more or less In Figure in Words quantities
“Providing and laying heavy duty NP-3 class RCC pipes of approved
diameter for utility/storm water road crossings including excavation in all
types of strata, dressing, sand/CC bedding, lowering, laying, jointing, Rupees Four Thousand Seven
12.0 20.00 haunching, refilling, compaction, disposal of surplus earth, necessary 4710.64 Hundred Ten Paise SixtyFour Rmt
cutting/restoration of road surface and allied civil works complete as per Only
actual site conditions and as directed by Engineer-in-Charge.”
Providing and laying cement concrete 1:2:4 1:Cement 2: coarse sand 4:
Rupees Three Thousand Six
graded stone aggregates 20mm nominal size ) and curing complete
13.0 12.00 3638.79 Hundred ThirtyEight Paise Cu.M
excluding cost of form work in (a) Fundation and Plinth
SeventyNine Only
Providing and fixing M.S. grills of required pattern to wooden frames of
windows etc. with M.S. flats at required spacings and frame alround,
Rupees One Hundred Eleven
14.0 1875.00 square or round bars with round headed bolts and nuts or by screws 111.35 Rmt
Paise ThirtyFive Only
Including one coat primer & two coat of paint etc as directed (A) Plain Grill.
Road Marking with Hot Applied Thermoplastic Compound with
Reflectorising Glass Beads on Bituminous Surface (providing and laying
of hot applied thermoplastic compound 2.5 mm thick including
reflectorising glass beads @250 gmspersqmarea, thickness of 2.5 mm is Rupees Three Hundred
15.0 398.00 exclusive of surface applied glass beads as per IRC:35. The finished 367.73 SixtySeven Paise Sq.Mt
surface to be level, uniform and free from streak sandholes), including SeventyThree Only
providing and painting zebra crossing, speedbreakers, rumbles trips,
arrows, dash, any other signor laters etc. as per direction of Engineer In-
Providing and laying cast in situ controlled cement concrete M-200 grade
kerb block/divider kerb of size 0.15 m × 0.45 m including centering, Rupees Four Hundred
16.0 2100.00 shuttering, compacting, curing, finishing, joint filling in C.M. 1:3 and 447.97 FourtySeven Paise Rmt
painting with approved road marking paint complete as directed. NinetySeven Only
Rupees Two Hundred
17.0 190.00 20cm. thickness includingwatering, ramming and consolidating 282.08 Cu.M
EightyTwo Paise Eight Only
etc.complete.
In Words Rupees NinetyFour Lakh Five Thousand Nine Hundred FiftyFive Paise NinetyNine Only
I/We am/are willing to carry out the work at ………………………………………………………………………% above/below
Percent (should be written in figures and words ) of the estimated rates mentioned above. Amount of my/our tender works out as under:-
* Estimated amount * Estimated amount
Quantity Total Amount
Quantity Total Amount
Estimated Rate
It. Estimated according to
Description of Item (in Rs.) Unit
No. But may be estimated
more or less In Figure in Words quantities
Put to tender................................... Rs. ………………….. Put to tender......................................... Rs. …………………..
Deduct : ............................% below Rs. ………………….. Add ……............................... % above Rs. …………………
Net.................................................. Rs. ………………….. Total ...................................................... Rs. …………………
In words …………………………………………............................................................. In words …………………………………………........................................................................
* (Please strike out whicheve is not applicable).
Note 1- All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note 2- All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Note 3- Rates quoted include clearance of site (prior commencement of work and at itscolose) in all respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4- To be continued on additional sheets, if found necessary.
Note 5- GST at 18% will be charged on the bill generated.
Chief Officer
Nagarpalika Tharad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1-Notificatin UDP-2023-24 2024-25.pdf
2- SBD Book -UDP-2023-24 2024-25.pdf
3. Schedule B UDP-2023-24 2024-25.pdf
5.B.M Specification-2026-27.pdf
7. Govt GR.pdf
8. Sharato.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].