Tender Value
₹4.6 L
EMD Value
₹4,650
Closing Date
19 Aug 2026, 12:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, NADIAD ELECTRICAL SUB DIVISION, NADIAD
All in Comprehensive Maintenance of Split type A.C.Machine installed at Non residential Building under Kheda Section of Nadiad Electrical Sub Division, Nadiad.(Kheda section)
331697
15/11 OF 2026/2027
Open
Electrical and Maintenance Works
Works
Nadiad
9 documents required · 9 mandatory
₹600
Executive Engineer, Ahmedabad Electrical Dn No 2 Ahmedabad
₹4,650
5 Aug 2026
5 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
Name of work :- All in Comprehensive Maintenance of Split type A.C.Machine installed at Non residential Building
under Kheda Section of Nadiad Electrical Sub Division, Nadiad.(Kheda section)
Fund Head:- 4059 Budgeted
Item Quantity Particulars Issue Rate Amount
Signature of Contractor Deputy Executive Engineer
Nadiad R & B Electrical Sub Division
Name of Work :- All in Comprehensive Maintenance of Split type A.C.Machine installed at Non residential Building under Kheda Section of Nadiad
Electrical Sub Division, Nadiad.(Kheda section)
Item Qty. Unit Item of work Net Rate in Net Rate in words. Per Amount
1A 76.00 Nos. All inclusive comprehensive maintenance cost for the period of one year 1233.21 Rupees One Thousand Ea.
for the Split type Air-conditioning Unit of following Capacity.(B) 1.5 ton Two Hundred Thirty
capacity.Note: (1) The All inclusive comprehensive maintenance cost Three And Paise
covers the yearly maintenance cost of the electrical machineries with Twenty One Only
material & Labour cost including preventive maintenance. The cost
covers entire installation from outlet of main switch to electrical
machine.(2) All inclusive comprehensive maintenance cost of Split type
Air conditioners & Water coolers covers the yearly maintenance &
preventive maintenance with all required painting materials & labours.
including sheet metal work, refrigerant gas , compressor & all the
contains parts. The cost covers entire installation from outlet of main
switch to the Unit. (A) Charges for breakdown Maintenance as per
requirement throughout the year.
1B 76.00 Nos. (B) Charges for 1st Routine Maintenance of Dry Services between date 144.43 Rupees One Hundred Ea.
of commencement to 3rd Months from date of issue of work order. Forty Four And Paise
Forty Three Only
1C 76.00 Nos. (C) Charges for 2nd Routine Maintenance of wet Services with water or 267.65 Rupees Two Hundred Ea.
Chemical as per site requirement Services between 3rd months to 6th Sixty Seven And Paise
Months from date of issue of work order. Sixty Five Only
1D 76.00 Nos. (D) Charges for 3rd Routine Maintenance of Dry Services between 6th 144.43 Rupees One Hundred Ea.
months to 9th Months from date of issue of work order. Forty Four And Paise
Forty Three Only
1E 76.00 Nos. (E) Charges for 4th Routine Maintenance of wet Services with water or 267.65 Rupees Two Hundred Ea.
Chemical as per site requirement Services between 9th months to 12th Sixty Seven And Paise
Months from date of issue of work order. . Sixty Five Only
Item Qty. Unit Item of work Net Rate in Net Rate in words. Per Amount
2A 25.00 Nos. All inclusive comprehensive maintenance cost for the period of one year 2282.60 Rupees Two Thousand Ea.
for the Inverter Based Split type Air-conditioning Unit of following Two Hundred Eighty
Capacity.(B) 1.5 ton capacity.Note: (1) The All inclusive comprehensive Two And Paise Sixty
maintenance cost covers the yearly maintenance cost of the electrical Only
machineries with material & Labour cost including preventive
maintenance. The cost covers entire installation from outlet of main
switch to electrical machine.(2) All inclusive comprehensive maintenance
cost of Split type Air conditioners & Water coolers covers the yearly
maintenance & preventive maintenance with all required painting
materials & labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers entire installation
from outlet of main switch to the Unit. (A) Charges for breakdown
Maintenance as per requirement throughout the year.
2B 25.00 Nos. (B) Charges for 1st Routine Maintenance of Dry Services between date 267.65 Rupees Two Hundred Ea.
of commencement to 3rd Months from date of issue of work order. Sixty Seven And Paise
Sixty Five Only
2C 25.00 Nos. (C) Charges for 2nd Routine Maintenance of wet Services with water or 494.90 Rupees Four Hundred Ea.
Chemical as per site requirement Services between 3rd months to 6th Ninety Four And Paise
Months from date of issue of work order. Ninety Only
2D 25.00 Nos. (D) Charges for 3rd Routine Maintenance of Dry Services between 6th 267.65 Rupees Two Hundred Ea.
months to 9th Months from date of issue of work order. Sixty Seven And Paise
Sixty Five Only
2E 25.00 Nos. (E) Charges for 4th Routine Maintenance of wet Services with water or 494.90 Rupees Four Hundred Ea.
Chemical as per site requirement Services between 9th months to 12th Ninety Four And Paise
Months from date of issue of work order. . Ninety Only
Item Qty. Unit Item of work Net Rate in Net Rate in words. Per Amount
3A 32.00 Nos. All inclusive comprehensive maintenance cost for the period of one year 2829.01 Rupees Two Thousand Ea.
for the Inverter Based Split type Air-conditioning Unit of following Eight Hundred Twenty
Capacity (C) 1.7 to 2.0 ton capacity.Note: (1) The All inclusive Nine And Paise One
comprehensive maintenance cost covers the yearly maintenance cost of Only
the electrical machineries with material & Labour cost including
preventive maintenance. The cost covers entire installation from outlet
of main switch to electrical machine.(2) All inclusive comprehensive
maintenance cost of Split type Air conditioners & Water coolers covers
the yearly maintenance & preventive maintenance with all required
painting materials & labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers entire installation
from outlet of main switch to the Unit. (A) Charges for breakdown
Maintenance as per requirement throughout the year.
3B 32.00 Nos. (B) Charges for 1st Routine Maintenance of Dry Services between date 330.27 Rupees Three Ea.
of commencement to 3rd Months from date of issue of work order. Hundred Thirty And
Paise Twenty Seven
3C 32.00 Nos. (C) Charges for 2nd Routine Maintenance of wet Services with water or 612.06 Rupees Six Hundred Ea.
Chemical as per site requirement Services between 3rd months to 6th Twelve And Paise Six
Months from date of issue of work order. Only
3D 32.00 Nos. (D) Charges for 3rd Routine Maintenance of Dry Services between 6th 330.27 Rupees Three Ea.
months to 9th Months from date of issue of work order. Hundred Thirty And
Paise Twenty Seven
3E 32.00 Nos. (E) Charges for 4th Routine Maintenance of wet Services with water or 612.06 Rupees Six Hundred Ea.
Chemical as per site requirement Services between 9th months to 12th Twelve And Paise Six
Months from date of issue of work order. . Only
4 10.00 Nos. Shifting of Split A.C. The Scope includes dismantling, shifting, re- 1969.50 Rupees One Thousand Ea.
installing & re-commissioning of the units including topping up of Nine Hundred Sixty
Refrigerant gas, minor civil work wiring existing piping M S Stand Nine And Paise Fifty
electrical cabling with PVC drown piping for 1.00, 1.5 & 2.0 TR capacity. Only
5 5.00 Nos. Supplying & installing MS standard type stand mounting for outdoor unit 746.39 Rupees Seven Ea.
of Split A.C. upto 4 TR capacity erected with necessary hardware Hundred Forty Six And
materials as directed. Paise Thirty Nine Only
Item Qty. Unit Item of work Net Rate in Net Rate in words. Per Amount
6 30.00 Rmtr. Supplying and erecting insulated pair of soft copper tubing open or 1158.47 Rupees One Thousand Rmtr.
concealed including power and control cable,necessary PVC drain pipes One Hundred Fifty
for Split AC machine up to 4 TR capacity Eight And Paise Forty
Amount Put to tender Rs.
Rupees Four Lakh(s) Sixty Thousand Five Hundred Seventy One And Paise Eleven Only
I/ We am/are willing to carry out the work at_________% above / below percent (should be written in figure & words) of the estimated mentioned above. Amount of my / our tender works out as under.
Estimated amount put to Estimated amount put to
(a) I/we hereby declare that we have visited the site and fully exquisite myself/ourselves with the Local situation regarding materials labour and other factors pertaining to work before submitting Tender.
(b) I/we hereby declare that we have carefully studies the conditions of contracts. Detailed Specification and other tender document of this work and agree to execute the same accordingly.
1 The Rates are inclusive of all taxes, transport charges, storage charges and other taxes excluding GST as applicable from time to time.
2 All works shall be carried out as per public works Department hand book and other Specification.
3 Rates are inclusive of 1% Labour cess in tender amount so 1% of total amount of bill will be deducted from the bill.
3 Rates are inclusive of 1% Labour cess in tender amount so 1% of total amount of bill will be deducted from the bill.
4 The material to be used in this work must be as per instruction by under liason of Engg. In charge.The agency will have to agree to carried out the work as per brand/make demand of concern deptt.
5 Contractor must have registration in "E2" & above class registered under elect. (R & B) division .
6 If required and found necessary material to be used for this work & brought at site will hae to sent to Govt. approved laboratory. Necessary testing cost to be beared by agency/manufacturer of the
particular product.
Deputy Executive Engineer
Nadiad R & B Electrical Sub Division
Signature of contractor Nadiad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
AMC Condition.pdf
G S T LTR.pdf
GR.pdf
online jaher nivida-15 of 2026-27.pdf
PQ.pdf
SCHEDULE A AND B AC Kheda.pdf
STANDARD BIDDING DOCUMENTS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .