Loading…
Loading…
Tender Value
₹5.8 L
EMD Value
₹11,576
Closing Date
7 Sept 2026, 3:00 pm
The Executive Engineer-III (Works), SVPMC
The Executive Engineer-III (Works), SVPMC, Shadipur, Sri Vijaya Puram- 744106
Renovation of CC Footpath from Hotel Sunrise to, Shri. Adaikalam House at Bathubasthi in Ward No.24.
2026_PMBC_24391_1
16/NIT/EE-III/W/MC/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Bathubasthi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,576
22 Aug 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Centering and shuttering including strutting, propping etc. and removal of form work for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | 685.85 | - |
| 2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 13,138.7 | - |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 14,590.8 | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 125.3 | - |
| 5 | 12 mm cement plaster of mix
1:4 (1 cement: 4 fine sand) | - | Sqm | 441.65 | - |
| 6 | Extra for making chequers of approved pattern on cement concrete floors, steps, landings, pavements etc. | - | Sqm | 72.55 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
TenderDocument.pdf
Tender Documents • 1.40 MB
BOQ_25828.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].