Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
10 May 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Barrackpore Division
HINDUSTAN AERONAUTICS LIMITED Barrackpore Division Barrackpore Post Parganas (N) , Dist. 24 W. Bengal - 700 120 Phone : 2592-0157/2592-0163 Fax No : 91-033-2592-2379
FABRICATION OF LIGHTING PANELS -2 TYPES
7101
HAL/BKP/SC/2024-25/98461421/2
Works
Helicopter Complex -Barrackpore Divn
₹0
Exempted
10 May 2024
26 Apr 2024
26 Apr 2024
10 May 2024
Fabrication of items to be done on Raw Material supplied by HAL Barrackpore Division as per drawing and process sheet. All Machining operation to be carried out as per drawing & process sheet by vendor except processes like welding, plating, Heat treatment etc.
Sub-contractor has to certify that they have used same raw material which was supplied by HAL for fabricating that particular item.
Sub-contractor has to declare that they will be held responsible if any failure/discrepancy occurs due to mismatch of raw material in future and HAL will have full authority to take any appropriate action against them.
Sub-contractor should submit the MPS duly filled, to HAL along with supplies.
Delivery of first off sample (FOS) is required within 3 months from receipt of Purchase Order or issuance of raw material whichever is later. The remaining lot (in one or multiple batches) to be delivered within 3 months from the date of acceptance of FOS subject to issuance of raw material. Batch size may vary depending upon HAL production plan.
First article inspection (FAI) requirement is to be met as per AFQMS/AS9100 /CQAG 9002/AS9102 with applicable latest version. Vendor must fulfil FAI requirements and the same need to be confirmed by them during submission of quotation. The requirements are as follows: • First article inspection shall be carried out by the subcontractor on the first production run of a new part to verify that the production processes, production documentation and tooling are capable of producing parts that meet requirements. The process shall be repeated when changes occur that invalidate the original results (e.g. engineering changes, manufacturing process changes, change of location. • The subcontractor shall maintain a first article inspection file for each part manufactured and the file shall contain the following: (i) Balloon marked identification (KPI) for each characteristics specified in the drawing. (ii) Dimensional inspection report as per Annexure – VII of CQAG 9002.
NOTES :
Non-compliance of above terms and conditions, quotation will not be evaluated further.
Each inventory part no. is having suffix -E which signifies external operation to be carried out as per Drawing & MPS provided by HAL, Barrackpore.
ANNEXURE I
PRICE BID
Name of the Sub-contractor:
Enquiry No. :
Quote Ref. :
TOTAL VALUE (in Rs.)
Total value in Words (Rs):
Packing & Forwarding if any (%)
GSTIN Number
HSN/SAC code as applicable
GST as applicable (%)
Others (to be specified below) (%)
BANK DETAILS (Name & address of the Bank, Account No., IFSC code & type of A/c) Sub-contractor to send a bank details duly verified by bank. If it is submitted earlier, then only bank details to be mentioned.
ADDITIONAL CLAUSE (If any)
Note: 1. In case additional conditions are required, the same will be enclosed separately. 2. Price Bid is to be uploaded strictly in the Price Bid format as per the above EXCEL SHEET. 3. Sub-contractors are required to fill the fields in Yellow colour only in the Price Bid format. Columns containing SL. NO., PART NO, PART DESCRIPTION, REMARKS and QTY. (In Nos.) of Price Bid format are not to be altered/corrected.
ANNEXURE II
ACCEPTANCE OF TERMS & CONDITIONS
Name Of the Sub-contractor:
Tender No.:
Price
b) Sub-contractor has to quote for complete machining & bending operations mentioned in the Master process sheet except Welding, NDT, protective finishing process like plating, painting, Stenciling etc. if any. Finishing operations like CAD plating, Anodising, painting, stenciling etc. and Welding if mentioned in the MPS will be carried out at HAL-BKP. The quotation submitted should be considering any special tooling cost and the value of scrap generated during fabrication/machining. The Scrap need not to return to HAL Barrackpore.
c) Prices are firm and fixed till the delivery of all items as per the order. Prices quoted should be inclusive of all taxes/GST and statuary duties. Taxes/GST, Duties OR any other Government/statutory levies should be clearly indicated separately. We do not issue Form ‘C’ / Form ‘D’ / Form 37. Bidder should invariably indicate the rate at which these are payable otherwise price quoted shall be considered to be inclusive of all the above elements. Any claim on the above by bidder subsequent to placement of order will not be entertained. If these elements appear in the quotation and there is revision in the applicabletaxes/GST rates, Duties or any other Government/statutory levies as per norms, the same will be honored as per prevaling rates at the time of delivery with respect to accepted & acknowledged delivery schedule.
d) Fabrication of items to be done with Raw Material supplied by HAL Barrackpore Division as per drawing and Master Process Sheets (MPS). Processes under external work centre (ES) except welding , plating, heat treatment etc. are under vendor scope.
Delivery Schedule
Payment term
Validity of offer
Issue of material
Packing, Forwarding and Transportation
b) All the transportation from sub-contractor to Barrackpore Division of these parts (finished/semifinished) has to be borne by the sub-contractor. Whereas Transportation from HAL Barrackpore Division to sub-contractor will be born by HAL, which includes, receiving Raw materials from Barrackpore Divison stores, intermediate movement of semifinished parts etc. as applicable.
Tooling
Technical requirements & process approval
b) All parts are to be manufactured exactly as per the HAL supplied controlled drawing and approved Process Sheets/Plan.These process sheets/plan to fabricate the part/component assembly are to be prepared by Sub-contractor and submitted to HAL-Methods Engineering department for approval before actual manufacturing of these part.
c) Any alternate technology / methodology can be used for manufacturing of these parts only after prior approval of HAL Process Planning/Methods. Any minor amendment / notifications in the detail parts as issued by HAL Process Planning / Design Departments at later date will be incorporated by Sub-contractor at no additional cost.
d) Each Inventory part no. is having suffix -E which signifies external operations to be carried out as per Drawings & MPS provided by HAL, Barrackpore
Undertaking with supplies
b) Vendor has to declare that they will be held responsible if any failure/discrepancy occurs due to mismatch of raw material in future and HAL will have full authority to take any appropriate action against them.
c) In the view of above, Supplier has to submit a undertaking for material consumption along with all supplies stating that "Item Part No ............, Part Name ................, Qty......... Nos. fabricated from the raw material supplied by HAL Barrackpore division vide DA No ........... Dated ............... and having material batch no ................ . If any failure/discrepancy occurs due to mismatch of raw material in future, we will be fully responsible for that and HAL will have full discretion/authority to take any appropriate action against us".
Preservation of Raw Material & drawings
b) The party has to protect the machined surfaces with inhibition oil immeditely after completion of machining of the concerned item/ spare and ensure that the machined surfaces are duly protected before despatch of the items to HAL Barrackpore.
c) HAL supplied raw material,drawings and other documents are sole property of Barrackpore Division and needs to be preserved till the completion of purchase order and to be returned to HAL Barrackpore Division after completion of order.
Quality / Inspection
b) HAL Quality Assurance will examine and certify the First Article Inspection at HAL, and give their acceptance. Production batch to be started only after acceptance of first off components by HAL.
c) Sub-contractor shall carry out detailed self inspection along with profile projector/CMM report for critical dimensions wherever neccessary on all these parts and record 100% dimension for each item and offer to HAL inspection for clearance and acceptance. However, if necessary HAL will depute an inspector and accept the components at Sub-contractor's premises. The decision of HAL inspector will be final.
d) Sub-contractor shall inform if any non- conformance noticed during the manufacturing/after dispatch of products to HAL.
e) Vendor should submit the MPS duly filled and signed, to HAL along with each supplies. The Process sheet has to be prepared in accordance with HAL provided MPS by the Sub-contractor and approved by HAL-Methods Engineering department .
f) Pre-dispatch inspection will be done by HAL QA inside Sub-contractor's premises if required. The report furnished by HAL Barrackpore Division Inspector will be final and binding on Sub-contractor. The Sub-contractor shall provide inspection facilities free of charge. The intimation regarding readiness of items should be given by the Sub-contractor in writing seven days in advance in order to enable HAL Barrackpore Division to depute inspector to carry out inspection. Final inspection & acceptance of components will be carried out in HAL’s premises.
g) Authorized representatives of HAL/our customer and Regulatory authorities like DGAQA and DGCA have the right to acess the facilities and applicable records during the execution of contract.
Rejection allowance / rework
Liquidated damages
Bank guarantee, Indemnity Bond and Insurance
b) Indemnity Bond equivalent to the cost of raw materials lying at any point of time at Sub-contractor’s premises need to be submitted within 30 days after receipt of Order. The indemnity bond shall be provided in stamp paper. The format may please be collected from Barrackpore division in the event of placement of order.
c) Sub-contractors shall submit Burglary and Fire Insurance coverage towards safety of the Raw Materials supplied by HAL within 30 days after receipt of Order. The insurance value shall be equivalent to the cost of the materials to be indicated by HAL. The insurance policy should be assigned to HAL.
Risk purchase
Confidentiality agreement
b) The models/tools modified/developed by the Sub-contractor on HAL’s instructions/technical inputs will be the property of HAL and supplied back to HAL on completion of the order.
Parallel agreement / contract
Termination of contract
Jurisdiction
Counter terms and conditions
Sub-contracting / Sub-letting
Modification & Improvements/ Drawing changes
b) Sub-contractor should notify HAL, incase of chage in product and/or process definition and, where required shall obtain approval from HAL.
Warranty
Appropriation
Applicable Law
Arbitration
Work & Payment During Arbitration
Fall Clause
b) If at any time during the said period, the Seller reduces the sales price, sells or offer to sell such stores to any person(s) organization including the purchaser or any department of Govt. of India or State Govt. and any statutory undertaking of the Govt. of India / State Govt. as the case may be, at a price lower than the price chargeable in the order, Seller shall henceforth notify such reduction / sales or offer to sale to Hindustan Aeronautics Ltd., and the price payable in the order for the stores supplies after date of coming into force such reduction or sale or offer to sale shall stand correspondingly reduced.
Response/Regret
Applicability of terms & conditions
Despatch Documents
b) The vendor has to mandatorily indicate the applicable GST rate seperately in the invoice at the time of delivery. Also the vendor has to indicate the HSN/SAC (Service Accounting Code) as applicable in their invoices. Seprate invoices to be submitted against each delivery challan (DC) at the time of delivery. There shall be a separte DC for each part loaded against HAL material gate passs (MGP)/Despatch advice (DA). Work Order No., Batch No. of raw material, HSN/SAC code, Quantity, MGP/DC No., P.O. No. to be mentioned in the documents wherever applicable. Quantity on documents shall match with delivered quantity. Vendor may please adhere to the above guidelines while preparing the dispatch documents.
In the event the values in figures and in words do not match, the values in words would be considered as final.
HAL, Barrackpore Division reserves the right to reject, partially or fully, offers received. HAL, Barrackpore Division also reserves the right to modify (by adding or deleting)/relax any of the tender condition/give some time for compliance after opening of Technical bid if feel necessary for competitative offer or for smoothness of execution of order without asserting any reason to any contractor.
Late / Delayed Offers Will Not Be Considered.
If purchase order is not placed on you, you should positively return back the drawings/technical specifications provided to you by HAL Barrackpore division.
The participating MSEs in a tender, quoting price within the band of L1 + 15% may also be allowed to supply a portion of the requirement by bringing down their price to the L1 price, in a situation where L1 price from someone other than MSE. Such MSEs may be allowed to supply upto 20% of the total tendered value. In case of more than one such eligible MSE, the supply will be shared equally.
Please mention about the status of your firm or company whether: (A) MSE (B) Small Scale Industries (SSI) (C) Ancillary Unit (D) Large / Small (E) Agent (F) Stockiest (G) General order Sub-contractor (Please indicate your Registration Number).
In case of MSME vendors, please mention whether they are SC/ST unit or not? If yes, suitable certificate to be enclosed.
Sub-contractor to send bank details duly verified by bank. If it is submitted earlier, then only bank details to be mentioned here.
All other general terms and conditions as per Annexure-III are acceptable. However, terms & conditions mentioned in Annexure-II will supersede the same mentioned in Annexure-III.
PLACE :
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
RFQ98461421_2.pdf
TENDER_DOCUMENT • 0.25 MB
AnnexureIVRAWMATERIALCOST98461421_2.pdf
TENDER_DOCUMENT • 0.04 MB
DRAWINGS_98461421_2.pdf
TENDER_DOCUMENT • 2.35 MB
MPS_98461421_2.pdf
TENDER_DOCUMENT • 0.51 MB
AnnexureIIIFINALGeneralTC98461421_2.pdf
TENDER_DOCUMENT • 0.10 MB
AnnexureA98461421_TechnicalTC_2.xlsm
TENDER_DOCUMENT • 0.01 MB
AnnexureI98461421_PRICEBID_2.xlsm
TENDER_DOCUMENT • 0.01 MB
AnnexureII98461421_2.xlsm
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .