| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 LRejected-AOC C O PRODIP NARZARI NATUN HAPAGAON P O GORAIBARI P S DIST UDALGURI BTC ASSAM PIN 784509 | GORAIBARI | UDALGURI | ASSAM | 784509 | ₹7.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.1 LRejected-AOC C O NAGESWAR BRAHMA PURANI GARAIBARI P O P S UDALGURI DIST UDALGURI BTC ASSAM PIN 784509 | UDALGURI | UDALGURI | ASSAM | 784509 | ₹7.1 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | RATUL BRAHMA L3 | KHAULA DAIMARI L1 | ANNAI NARZARI L2 |
|---|---|---|---|---|---|---|
| 1.00 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil | 59.57 | cum | 305.5 ₹18,199.55 | 305 ₹18,169.77 | 305.5 ₹18,199.55 |
| 2.00 | 16.12 Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 41.46 | sqm | 646.67 ₹26,812.23 | 620 ₹25,706.44 | 646.67 ₹26,812.23 |
| 3.00 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size | 3.11 | cum | 7,278.01 ₹22,634.61 | 7,303 ₹22,712.33 | 7,278.01 ₹22,634.61 |
| 4.00 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.1 Mild steel and Medium Tensile steel bars | 947.1 | kg | 93.55 ₹88,600.74 | 97 ₹91,868.22 | 100 ₹94,709.50 |
| 5.00 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.1 Mild steel and Medium Tensile steel bars | 595.9 | kg | 94.73 ₹56,449.51 | 97 ₹57,802.20 | 94.73 ₹56,449.51 |
| 6.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass
concrete | 103.94 | sqm | 327.97 ₹34,090.51 | 327 ₹33,989.69 | 327.97 ₹34,090.51 |
| 7.00 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 49.98 | sqm | 647.89 ₹32,379.60 | 627 ₹31,335.58 | 647.89 ₹32,379.60 |
| 8.00 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.86 | cum | 8,462.12 ₹1.3 L | 8,125 ₹1.2 L | 8,462.12 ₹1.3 L |
| 9.00 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.03 | cum | 10,847.08 ₹54,571.66 | 12,546 ₹63,118.93 | 10,847.08 ₹54,571.66 |
| 10.00 | 6.13 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
6.13.2 Cement mortar 1:4 (1 cement :4 coarse sand) | 99.95 | sqm | 1,084.22 ₹1.1 L | 1,121 ₹1.1 L | 1,084.22 ₹1.1 L |
Tender Value
₹7.0 L
EMD Value
₹14,000
Closing Date
4 Mar 2026, 12:30 pmClosed
Sri J.M. Basumatary
O/o the Addl. Chief Engineer-cum-Director, PWD, BTC, Kokrajhar.
Construction of Boundary Wall at Rowta Station Dharamsala under SOPD Bodoland Welfare Department, 2025-26. TN_111_45
2026_BTC_51204_1
No.ACE-133/PWD/G.79/2025-26/69
Open Tender
Civil Works - Building
180 days
Kokrajhar
Refer to SBD
4 documents required · 4 mandatory
₹500
₹14,000
Yes
25 May 2026
16 Feb 2026
5 Mar 2026
16 Feb 2026
4 Mar 2026
16 Feb 2026
16 Feb 2026 - 4 Mar 2026
2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil
16.12 Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : 16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size
5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild steel and Medium Tensile steel bars
5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.1 Mild steel and Medium Tensile steel bars
5.9 Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
6.13 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. 6.13.2 Cement mortar 1:4 (1 cement :4 coarse sand)
13.4 12 mm cement plaster of mix : 13.4.2 1:6 (1 cement: 6 coarse sand)
13.5 15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.2 1:6 (1 cement: 6 coarse sand)
13.43 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 13.43.1 Water thinnable cement primer
13.44 Finishing walls with water proofing cement paint of required shade : 13.44.1 New work (Two or more coats applied @ 3.84 kg/10 sqm)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.42 MB
BOQ_81392.xls
BOQ • 0.25 MB
FOB111.pdf
Additional Documents • 0.25 MB
SBD111.pdf
Tender Documents • 3.20 MB
Download all tender documents and submit your bid