| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.5 CrAdmitted-Finance | -6.09% | ₹11.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.8 CrAdmitted-Finance E 44 GROUND FLOOR SECTOR 36 GREATER NOIDA G B NAGAR UP | -3.17% | ₹11.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹11.8 CrAdmitted-Finance 7 GADHI DADRI G B NAGAR U P | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | -2.98% | ₹11.8 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 112 FIRST FLOOR NAVAYUG MARKET GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
₹12.2 Cr
EMD Value
₹24.4 L
Closing Date
21 Apr 2026, 5:00 pmClosed
GENERAL MANAGER CIVIL
SEC 6 NOIDA
M/o Drain (C/o RCC Drain AND Covering of Hollow Core Slab From Spectrum Mall Phase-I to Sichai Vibhag Main Drain Along Sector-76 on 75 Mtr Road) Noida.
2026_NOIDA_1133908_1
80/NOIDA/GM/SM-WC-03/2025-26
Open Tender
Civil Works - Others
360 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,260
NOIDA
₹24.4 L
2 Jun 2026
6 Apr 2026
22 Apr 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge | - | Cum | - | - |
| 2 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar ,DSR-2018/Item no. 15.7.4 | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) DSR 18/I.No. 4.1.8/P- | - | Cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo Mechanically Treated bars of grade Fo_500D or more. Iten No.-5.22.6 | - | Kg | - | - |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form work for. Foundation, footings, bases of Columns etc for mass concrete. | - | Sqm | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | Sqm | - | - |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level | - | Cum | - | - |
| 8 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | cum | - | - |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. | - | Cum | - | - |
| 10 | Filling avilable excavated earth (excluding rock) in trenches, plinth, side of foundation etc, in layers not exceeding 20 cmm depth, consolidating each deposited layer by ramming and watering, lead up to 50 and lift upto 1.5 m. Item N.2.25 | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_2116597.xls
BOQ • 0.25 MB
C.xls
Additional Documents • 0.05 MB
TD.pdf
Tender Documents • 5.41 MB