| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC WARD NO 07 MURTI PARA P O KOREA COLLIERY DISTT MCB C G PIN 497559 | KOREA | CHHATTISGARH | 497559 | L1 | Accepted-AOC As being L1 and qualifies eligibility criteria | |
| 2 | Rejected-Technical SARUBERA RAMGARH 829134 | SARUBERA | RAMGARH | JHARKHAND | 829134 | - | Rejected-Technical Not taken for technical evaluation as not being L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not taken for technical evaluation as not being L1 |
Tender Value
₹2.1 L
EMD Value
₹2,600
Closing Date
11 Nov 2023, 5:00 pmClosed
Staff Officer (E and M), Chirimiri Area
Office of the General Manager, SECL Chirimiri Area , P.O. West Chirimiri Distt. MCB (C.G.) 497773
Transportation and laying of 6 inch dia. (GI/MS) pipe approx. 950 mtrs. (158 pipes) for Kurasia UG Mine.
2023_SECL_292191_1
SECL/GM/CHRM/EM/e-Tender/ 23-24/16 dtd. 27.10.2023
Open Tender
Miscellaneous Works
Item Rate
30 days
Kurasia UG Mine, Chirimiri Area
As per NIT
3 documents required · 3 mandatory
₹2,600
12 Mar 2024
28 Oct 2023
13 Nov 2023
28 Oct 2023
11 Nov 2023
28 Oct 2023
28 Oct 2023 - 4 Nov 2023
Amount
Loading the pipe in to trolley at surface/old working , tightening and pushing the loaded trolley up to incline mouth/haulage, transportation of pipe upto end of track, includes following points:- (i) Loading the pipe into trolley on surface/ old working (ii) Tightening the pipe on trolley (iii) Pushing the loaded trolley up to incline mouth /haulage facility on surface / old working (iv) Transportation of pipe upto end of track line for laying of pipe from Ganga Incline to main sump (9N/8E) 9N/8E to 13N/8E = 100 mtrs. 8E/13N to 21E/13N = 340 mtrs. 21E/13N to Ganga Incline Mouth = 510 mtrs. Total = 950 mtrs.
Transportation of pipe from the track end, laying & installation of pipe at about 100m lead from the track, including following points:- (i) Transportation of pipe from track end to site of installation at about 100m lead (ii) Laying of pipe (iii) Joining the pipe for laying of pipe from Ganga Incline to main sump (9N/8E) 9N/8E to 13N/8E = 100 mtrs. 8E/13N to 21E/13N = 340 mtrs. 21E/13N to Ganga Incline Mouth = 510 mtrs. Total = 950 mtrs.
Total impact of GST for the purpose of CTC
RNB BUILDCON (OPC) PRIVATE LIMITED
MANISH KUMAR SINGH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_302658.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .