Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC KERALA KL | L1 | Accepted-AOC 1ST BIDDER | |
| 2 | L2₹10.8 L+₹41,147.79 (3.94%)Rejected-AOC CHOLAKKAPARAMBAN | KOTTAYAM | KERALA | 686102 | L2 | Rejected-AOC 2ND BIDDER | |
| 3 | L3₹11.9 L+₹1.5 L (14.0%)Rejected-AOC | L3 | Rejected-AOC 3RD BIDDER |
Tender Value
₹11.5 L
EMD Value
₹28,812
Closing Date
20 Jan 2024, 12:00 pmClosed
Reethu Gracious
OFFICE OF THE ASSISTANT ENGINEER, LID EW SECTION, OTTAPALAM MUNICIPALITY
Annual Plan--OTPMC 2023-24 PROJECT NO 423-COMPOUND WALL CONSTRUCTION AT MUNICIPALITY PARK -SECOND PHASE-General Civil Work
2024_LSGD_641217_33
TENDER ET-08/2023-24/AE/LSGD/OT
Open Tender
Civil Works - Others
Item Rate
180 days
OTTAPALAM MUNICIPALITY
.
7 documents required · 7 mandatory
₹2,760
Yes
₹28,812
Yes
21 Feb 2024
8 Jan 2024
22 Jan 2024
8 Jan 2024
20 Jan 2024
8 Jan 2024
Amount
CHILDRENS PARK
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD323864/2023-2024:Details of cost for 10 cum. Average output of Hydraulic Excavator per hour = 30cum
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
UNNIKRISHNAN K
SETHUMADHAVAN
Bidder Name
prasad
SETHUMADHAVAN
UNNIKRISHNAN K
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_978482.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .