Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | ₹9.8 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | Kraftek Industrial Trading Co. L1 |
|---|---|---|---|---|
| 1.00SERVICES | ||||
| 1.01 | DM00004 of weight management system valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 29,150 ₹58,300 Lowest |
| 1.02 | BQ00001 Stbd inner valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 31,280 ₹62,560 Lowest |
| 1.03 | DM00005 valve of weigh management system open indication not avaliable on IPMS. Suspect limit switch faulty. RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 29,150 ₹58,300 Lowest |
| 1.04 | BQ00004 exhaust flap shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 35,350 ₹70,700 Lowest |
| 1.05 | External Hydraulic system primary pressure generator not avaliable in Remote. Suspect limit switch of electro distributor malfunctioning.
RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 32,350 ₹64,700 Lowest |
| 1.06 | BQ00004 port disel snort exhaust flap shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 35,350 ₹70,700 Lowest |
| 1.07 | BQ00003 Stbd disel Exhaust flap continous indication avaliable. Suspect limit switch and cable betyween OJB and IJB faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 35,350 ₹70,700 Lowest |
| 1.08 | EN00011 outlet valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 30,350 ₹60,700 Lowest |
| 1.09 | EN00013 outlet valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves:
(a) Removal of limit switch
(b) Repair of limit switch
(c) Replacement of limit switch | 2 | NOS | 31,750 ₹63,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹27,907
Closing Date
30 Apr 2025, 11:00 amClosed
THE ADMIRAL SUPERINTENDENT
NAVAL SHIP REPAIR YARD NAVAL BASE KARWAR 581308
UNDERTAKING DEFECT RECTIFICATION AND OVERHAULING OF LIMIT SWITCHES ONBOARD NAVAL VESSEL
2025_NAVY_704984_1
REG-1141-CONTROLS-LIMIT-SWITCH
Open Tender
Marine Services
Item Rate
90 days
NAVAL SHIP REPAIR YARD NAVAL BASE KARWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹27,907
Yes
29 Aug 2025
24 Apr 2025
1 May 2025
24 Apr 2025
30 Apr 2025
25 Apr 2025
Amount
SERVICES
DM00004 of weight management system valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
BQ00001 Stbd inner valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
DM00005 valve of weigh management system open indication not avaliable on IPMS. Suspect limit switch faulty. RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
BQ00004 exhaust flap shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
External Hydraulic system primary pressure generator not avaliable in Remote. Suspect limit switch of electro distributor malfunctioning. RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
BQ00004 port disel snort exhaust flap shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
BQ00003 Stbd disel Exhaust flap continous indication avaliable. Suspect limit switch and cable betyween OJB and IJB faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
EN00011 outlet valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
EN00013 outlet valve shut indication not avaliable on IPMS. Suspect limit switch faulty.RA for overhauling of the limit switch. Scope of work involves: (a) Removal of limit switch (b) Repair of limit switch (c) Replacement of limit switch
Trim management system flow not avaliable on IPMS. Suspect flowmeter malfunctioning.RA for overhauling the flow meter. Scope of work involves: (a) Removal of flow meter (b) Repair of flow meter (c) Replacement of flow meter
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .