| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.1 LAccepted-Finance | ₹80.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹91.3 L+₹11.2 L (14.0%)Accepted-Finance | ₹91.3 L+₹11.2 L (14.0%) | L2 | Accepted-Finance L2 |
| 3 | L3₹93.0 L+₹12.9 L (16.2%)Accepted-Finance | ₹93.0 L+₹12.9 L (16.2%) | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | K.T. DEVASIA L1 | shabeer L2 | M MOHAMMADKUNHI L3 |
|---|---|---|---|---|---|---|
| 1.00Rectification of cut and cover at ch. 2/250km in Azheekkal branch canal | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 300 | sqm | 8.2 ₹2,460 Lowest | 9.35 ₹2,805 | 9.53 ₹2,859 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2,280.76 | cum | 227.7 ₹5,19,328.14 Lowest | 259.69 ₹5,92,289.53 | 264.5 ₹6,03,259.96 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 215.25 | cum | 3,245.46 ₹6,98,585.27 Lowest | 3,701.27 ₹7,96,698.37 | 3,769.81 ₹8,11,451.6 |
| 1.00 | OD39856/2025-2026:Removing and cleaning the deposited silt from the tunnel by mechanical means/ manual means including providing safety measures like oxygen mask lighting arrangement, exhaust fan, generator etc and getting out the excavated silt and other debris within a distance of 50m and including all labour charges, rent of genrator, lights and exhaust etc complete as per the direction of departmental officers at site for all kinds of soil. | 83.36 | cum | 405.34 ₹33,790.36 Lowest | 462.27 ₹38,536.21 | 470.83 ₹39,249.8 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 4,991.6 | cum | 115.79 ₹5,77,977.48 Lowest | 132.06 ₹6,59,190.83 | 134.51 ₹6,71,420.25 |
| 1.01 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 29.16 | cum | 2,224.62 ₹64,869.92 Lowest | 2,537.06 ₹73,980.67 | 2,584.04 ₹75,350.61 |
| 1.01 | 26.28.2:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge50mm average thickness | 67.5 | sqm | 234.51 ₹15,829.43 Lowest | 267.45 ₹18,052.88 | 272.4 ₹18,387 |
| 1.01 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 67.5 | sqm | 432.76 ₹29,211.3 Lowest | 493.55 ₹33,314.63 | 502.69 ₹33,931.58 |
| 1.01 | OD39858/2025-2026:Applying two component (liquid polymer part and powder part) high build polymer modified cementitious reinstatement repair mortar, Rendroc HB2 / approved equivalent make preferable with a gloved hand or trowel using wet on wet technique to make sure that high strength polymer mix covers the reinforcing bar on all sides . Before applying Rendroc HB2 / approved equivalent make, the reinforcing steel should be primed and SBR should be tacky. For one bag of 18kg Rendroc HB2 / approved equivalent make, place about 2.75litres of drinking quality water in the mixer and add the supplied liquid polymer part, mix well in the mixer machine in operation, add Rendroc HB2 / approved equivalent make powder and mix for 2 to 3 minutes. Depending on the ambient temperature and the desired consistency, a small additional amount of water may be added up to a maximum total water content of 3.25 litres. Measurement is made for whole exposed area Including cost of materials, labour charges, conveyance of materials to site, hire charges of tools and mixer machine etc complete. | 67.5 | sqm | 1,609.83 ₹1,08,663.53 Lowest | 1,835.99 ₹1,23,929.33 | 1,869.92 ₹1,26,219.6 |
Tender Value
₹84.6 L
EMD Value
₹50,000
Closing Date
18 Aug 2026, 6:00 pmClosed
Executive Engineer pazhassi Project Division No
Office of the Executive Engineer pazhassi Project Division No 2 Kannur
PyIP_Rectification and reformation of Azheekkal branch canal near ch 2_250km and near ch 6_100km in Munderi Gramapanchayath General Civil Work
2026_Irrig_864536_1
IRR/PI/TR/6202/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
365 days
MUNDERI
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
2 Sept 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
18 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rectification of cut and cover at ch. 2/250km in Azheekkal branch canal | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.4 | cum | - | - |
| 1.003 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.004 | OD39856/2025-2026:Removing and cleaning the deposited silt from the tunnel by mechanical means/ manual means including providing safety measures like oxygen mask lighting arrangement, exhaust fan, generator etc and getting out the excavated silt and other debris within a distance of 50m and including all labour charges, rent of genrator, lights and exhaust etc complete as per the direction of departmental officers at site for all kinds of soil. | 0.2 | cum | - | - |
| 1.005 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.4 | cum | - | - |
| 1.006 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.007 | 26.28.2:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge50mm average thickness | - | sqm | - | - |
| 1.008 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | - | sqm | - | - |
| 1.009 | OD39858/2025-2026:Applying two component (liquid polymer part and powder part) high build polymer modified cementitious reinstatement repair mortar, Rendroc HB2 / approved equivalent make preferable with a gloved hand or trowel using wet on wet technique to make sure that high strength polymer mix covers the reinforcing bar on all sides . Before applying Rendroc HB2 / approved equivalent make, the reinforcing steel should be primed and SBR should be tacky. For one bag of 18kg Rendroc HB2 / approved equivalent make, place about 2.75litres of drinking quality water in the mixer and add the supplied liquid polymer part, mix well in the mixer machine in operation, add Rendroc HB2 / approved equivalent make powder and mix for 2 to 3 minutes. Depending on the ambient temperature and the desired consistency, a small additional amount of water may be added up to a maximum total water content of 3.25 litres. Measurement is made for whole exposed area Including cost of materials, labour charges, conveyance of materials to site, hire charges of tools and mixer machine etc complete. | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1462814.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1462814.xls
BOQ • 0.32 MB
1.pdf
Tender Documents • 1.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .