Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC Agreement02/EE/2022-23 | |
| 2 | L2₹9.8 L+₹54,705.16 (5.91%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹9.9 L+₹64,940.94 (7.02%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical 2ND FLOOR SHAGUN PLAZA SHYAMPUR RISHIKESH DEHRADUN UTTARAKHAND | RISHIKESH | DEHRADUN | UTTARAKHAND | 249204 | - | Rejected-Technical check list pont no 14,15 is not submit |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
28 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
MGCCD-3 AMROHA
LOT 20 Construction Of V.R.B at km 0.856 of Hussainpur Minor OF M.G.C STAGE-II
2021_UPIDC_661701_20
03/EE/2021-22
Open Tender
Civil Works - Canal
Item Rate
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,000
1 Sept 2022
22 Dec 2021
29 Dec 2021
22 Dec 2021
28 Dec 2021
22 Dec 2021
90 days
Amount
Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete.
Shuttering for P.C.C. including all cost of material, labour and T&P etc complete.
Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete.
M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete.
Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete.
R.C.C.(M–20) in 1:1.5:3 including all cost of material, labour and T&Petc complete.
Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete
P.C.C1:6:12 in back filling of abutment mortar including all cost of material labour and T&P etc complete
Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete.
S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete.
S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete.
S/Laying Tarfelt in 2- layers for Bearing slab. i/c all cost of material, labour and T&P etc complete.
Earth work in filling for making ramp in all type soil with all lead & lead i/c all cost of labours t&p etc. complete.
Providing & Laying 1st class Brick on edge soling 110 mm thick on Diversion & Ramp i/c all cost of material, labour and T&P etc complete.
R.C.C.(M – 20) in 1:1.5:3 wearing coat including all cost of material, labour and T&Petc complete.
universal enterprises
PRISTINE SOLUTIONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .