| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹7.2 L (5.65%)Rejected-Finance | ₹1.3 Cr+₹7.2 L (5.65%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L8 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | Unnikishnan Nair L6 | rejith L4 | MANOHARAN D L8 | Renjumon L7 | SASIDHARAN NAIR V L2 | SHAJAHAN L3 | Simon TJ L1 | A AJI L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Part I - Labour charge | |||||||||||
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 151.05 | cum | 329.59 ₹49,784.57 | - | 392.47 ₹59,282.59 | 361.2 ₹54,559.26 | 334 ₹50,450.7 | 320 ₹48,336 | 282.75 ₹42,709.39 Lowest | 400.23 ₹60,454.74 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | 203.25 | cum | 1,174.25 ₹2,38,666.31 | 1,588.97 ₹3,22,958.15 | 1,398.29 ₹2,84,202.44 | 1,287 ₹2,61,582.75 | 1,192 ₹2,42,274 | 1,050 ₹2,13,412.5 | 1,007.12 ₹2,04,697.14 Lowest | 1,088.54 ₹2,21,245.76 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 3,645.7 | cum | 512.32 ₹18,67,765.02 | - | 610.07 ₹22,24,132.2 | 568 ₹20,70,757.6 | 520 ₹18,95,764 | 450 ₹16,40,565 | 439.2 ₹16,01,191.44 | 400 ₹14,58,280 Lowest |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 2,600 | metre | 24.19 ₹62,894 | - | 28.81 ₹74,906 | 23.5 ₹61,100 | 25 ₹65,000 | 20 ₹52,000 Lowest | 20.75 ₹53,950 | 28.98 ₹75,348 |
| 1.00 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 6,100 | metre | 78.8 ₹4,80,680 | 106.63 ₹6,50,443 | 93.83 ₹5,72,363 | 76.7 ₹4,67,870 | 80 ₹4,88,000 | 70 ₹4,27,000 | 67.6 ₹4,12,360 | 50.87 ₹3,10,307 Lowest |
| 1.01 | 100.9.5:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 50 mm nominal outside diameter pipes. | 1,000 | metre | 42.88 ₹42,880 | 58.03 ₹58,030 | 51.07 ₹51,070 | 30 ₹30,000 Lowest | 44 ₹44,000 | 40 ₹40,000 | 36.79 ₹36,790 | 48.65 ₹48,650 |
| 1.01 | 100.9.3:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 32 mm nominal outside diameter pipes. | 2,000 | metre | 37.62 ₹75,240 | 50.91 ₹1,01,820 | 44.8 ₹89,600 | 36.6 ₹73,200 | 38 ₹76,000 | 30 ₹60,000 | 32.27 ₹64,540 | 10.87 ₹21,740 Lowest |
| 1.01 | OD169188/2023-2024::Alteration/ Making re connection(Specify with consumer number) with the existing water connection /SF connectionAlteration using 20mm Indian
Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule,
Elbow, MTA(Brass Threaded,), FTA(Brass Threaded,), couplers etc. and connecting withthe mains,
testing the joints etc. completeincluding trenching and refilling in all kinds ofsoil up to a depth of 1.50m for
main linetracing and trench of average cross section0.3m x 0.75m for laying connection pipe
andservice pipe, safely removing & re-fixingexisting water meter, lighting, watching,providing caution
boards, traffic control etc.complete including cost of materials, hire fortools, cost of consumables and labourcharges as per the directions of thedepartment officers. | 200 | no | 2,000.3 ₹4,00,060 | 2,706.76 ₹5,41,352 | 2,381.95 ₹4,76,390 | 2,219 ₹4,43,800 | 1,200 ₹2,40,000 | 1,800 ₹3,60,000 | 1,716.08 ₹3,43,216 | 1,000 ₹2,00,000 Lowest |
| 1.01 | 100.60.1.1.2:Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers. | 700 | no | 4,889.16 ₹34,22,412 | 6,615.92 ₹46,31,144 | 5,822.01 ₹40,75,407 | 5,292 ₹37,04,400 | 4,045 ₹28,31,500 | 4,500 ₹31,50,000 | 4,194.49 ₹29,36,143 | 3,534.68 ₹24,74,276 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹1 L
Closing Date
16 Jun 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Public Health Circle Kerala Water Authority Thiruvananthapuram
AMRUT II Laying pipes replacing old AC pipes providing new connections and alteration of house connections at Vizhinjam corporation ward Pipeline Work
2025_KWA_768632_1
03/2025-26/KWA/PHC/D2/TVM
Open Tender
Civil Works - Water Works
Item Rate
180 days
Vizhinjam
Pls refer NIT
7 documents required · 7 mandatory
₹9,759
₹1 L
Yes
23 Aug 2025
10 Jun 2025
17 Jun 2025
10 Jun 2025
16 Jun 2025
10 Jun 2025
10 Jun 2025 - 16 Jun 2025
Amount
Part I - Labour charge
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
100.9.5:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 50 mm nominal outside diameter pipes.
100.9.3:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 32 mm nominal outside diameter pipes.
OD169188/2023-2024::Alteration/ Making re connection(Specify with consumer number) with the existing water connection /SF connectionAlteration using 20mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA(Brass Threaded,), FTA(Brass Threaded,), couplers etc. and connecting withthe mains, testing the joints etc. completeincluding trenching and refilling in all kinds ofsoil up to a depth of 1.50m for main linetracing and trench of average cross section0.3m x 0.75m for laying connection pipe andservice pipe, safely removing & re-fixingexisting water meter, lighting, watching,providing caution boards, traffic control etc.complete including cost of materials, hire fortools, cost of consumables and labourcharges as per the directions of thedepartment officers.
100.60.1.1.2:Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.23.3.1:Providing 15mm PVC Tap in the water meter assembly for 15mm ( 1/2 inch ) water connection, using 20mm ( 1/2 inch ) Indian Standard uPVC Class 6 pipes, uPVC specials and PP PN 16 Compression specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
100.60.3.1.1:Providing additional length of house connection pipe using 20mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers
OD169183/2023-2024:Taking connection from 160/140/110 /90 to160mm to 32 mm or nearest size.PVC/GI/AC distribution main abranch line using suitable equal Tee(suitable class),reducer, CID/CIR and reducers including cost of materials labor charge etc complete.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
16.84:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
OD232216/2024-2025:Providing and Fixing Number plate
OD232217/2024-2025:Providing Tap post 110mm 6kg PVC Pipe and fixing the post with cement concrete 1:3:6 as per departmental officers.
100.31.1.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class I.
Part II - Supply of materials
100.98.223:Supply of PVC Pipe, 8kg/cm2, 90mm Dia.
100.98.233:Supply of PVC Pipe, 10kg/cm2, 50mm Dia.
100.98.231:Supply of PVC Pipe, 10kg/cm2, 32mm Dia.
OD15939/2025-2026:Cost of PVC specials (Bends, Tee, coupler, Tailpiece, end caps, solvent cement,CID/CIR etc )
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
OD15937/2025-2026:Supplying and fixing C.I man hole cover with frame for manholes:560 mm diameter ( heavy duty) the weight to be not less than 208 kg.
Part III - Providing valve chamber
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
Part IV: Road Restoration
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
OD269458/2024-2025:Supplying and stacking 24mm hard blue granite broken stone in standard heaps-for measurement(IRC 3.2. 1.a)
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
OD269466/2024-2025:Providing 40mm premixed chipping carpet over BT surface with departmental broken stones after thoroughly cleaning the base with wire brushes, brooms and applying a priming coat of hot bitumen @2.50Kg/10m2 and spreading the hot premix of 0.32m3 of 24mm, 0.22m3 of 12mm departmental metal mixed with 22.08Kg of bitumen per 10m2, rolling to dense surface, then spreading the seal coat comprising of 0.09m3 of 6mm metal mixed with 8.64kg of bitumen per 10m2 and rolling again including cost of bitumen, fuel, hire charges machineries etc. complete excluding the cost of 24mm ,12mm ,6mm metal(Total usage of bitumen 33.22 Kg per 10m2) (I.R.C 3.4.2)
SASIDHARAN NAIR V (BID ID -2225818)
SHAJAHAN (BID ID -2225956)
rejith (BID ID -2225804)
A AJI (BID ID -2225954)
Unnikishnan Nair (BID ID -2225754)
Renjumon (BID ID -2224769)
MANOHARAN D (BID ID -2225903)
Bidder Name
MANOHARAN D
Renjumon
Unnikishnan Nair
Simon TJ
SHAJAHAN
rejith
SASIDHARAN NAIR V
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1253548.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .