Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 CrAccepted-AOC | L1 | Accepted-AOC Work order allotted | |
| 2 | Rejected-Technical NEAR KARBI NAGAR HENGRABARI P O UPPER HENGRABARI DIST KAMRUP M ASSAM | KAMRUP | ASSAM | 781030 | - | Rejected-Technical Documents not found in order | |
| 3 | Not Admitted-Fee/PreQual/Technical C O GALA RAM BORO VILL P O RATANPUR P S TANGLA DIST UDALGURI BTC ASSAM PIN 784523 | RATANPUR | UDALGURI | ASSAM | 784523 | - | Not Admitted-Fee/PreQual/Technical Others-EMD NOT DEPOSITED | |
| 4 | Not Admitted-Fee/PreQual/Technical WARD NO 4 TANGLA TOWN P O P S TANGLA DIST UDALGURI ASSAM | TANGLA | UDALGURI | ASSAM | - | Not Admitted-Fee/PreQual/Technical Others-EMD NOT DEPOSITED |
| Sl No | Description | Qty | Unit | JETHMAL MALOO-TECHNO POWER (JV) L1 |
|---|---|---|---|---|
| 1.00 | Diversion Head Channel & Cofferdam
Construction of whole bamboo single pallasiding with matured Bhaluka bamboo pst 7.50 cm to 10 cm dia 5 cm clear apart 1.50 m to 1.00 m above ground and 1.00 m to 1.2o m below ground with jati bamboo structs placed 1.20 m to 1.50 m apart tied with galvd. wire of 16 G to 18 G and complete with three rows half jati bamboo kamies.Complete as directed. | 600 | m | 1,650.48 ₹9,90,288 Lowest |
| 2.00 | Supplying and laying of empty cement bags filled with sand/earth (As locally
available) including stiching the mouth,laying,fixing in position with supply of bags,sutlies etc. Complete as directed. | 27,093.1 | bags | 45.23 ₹12,25,420.91 Lowest |
| 3.00 | Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed. | 1,350 | cum | 343.37 ₹4,63,549.5 Lowest |
| 4.00 | Construction of Head Works
Preparing / making level the ground surface for layout of Headwork / structures for fixing the required axis line by cutting the high land and filling and levelling the low land where necessary etc, complete as directed. | 10,160.99 | sqm | 75.29 ₹7,65,020.94 Lowest |
| 5.00 | Earthwork in excavation of foundation of Headwork in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head lead to a safe distance from the working place & depositing required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 cm cube with compensation all complete as directed at site (including bailing out stagnant rain water where necessary). | 33,236.52 | cum | 290.25 ₹96,46,899.93 Lowest |
| 6.00 | Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) | 2,270.78 | sqm | 2,012.88 ₹45,70,807.65 Lowest |
| 7.00 | Collection and supply of one man size 23cm to 30cm collected manually from quarry rocks; stacking at quarry site including payment and forest royalties etc. complete as directed. | 1,087.44 | cum | 1,611.3 ₹17,52,192.07 Lowest |
| 8.00 | Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc. | 2,270.78 | cum | 451.52 ₹10,25,302.59 Lowest |
| 9.00 | Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.)
A) River Singles
(i)Without shuttering & without Dewatering | 13,308.15 | cum | 8,622.53 ₹11,47,49,922.62 Lowest |
| 10.00 | Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.)
(A) Hard river broken stone 6 mm to 20 mm size
(i)Without shuttering & without Dewatering | 1,816.81 | cum | 9,809.07 ₹1,78,21,216.47 Lowest |
Tender Value
₹30.3 Cr
EMD Value
₹60.7 L
Closing Date
8 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHD, Irrigation, BTC, Kokrajhar
CHD, Irrigation, BTC, Kokrajhar
Construction of Damra FIS under PMKSY (HKKP) for the year 2021- 2022
2023_BoTC_33092_1
CHDI/ ET-24/2022-23/24
Open Tender
Civil Works
Works
540 days
Gossaigaon
Please refer Tender documents.
3 documents required · 3 mandatory
₹61,000
₹60.7 L
Yes
8 Feb 2024
16 Oct 2023
9 Nov 2023
16 Oct 2023
8 Nov 2023
18 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diversion Head Channel & Cofferdam
Construction of whole bamboo single pallasiding with matured Bhaluka bamboo pst 7.50 cm to 10 cm dia 5 cm clear apart 1.50 m to 1.00 m above ground and 1.00 m to 1.2o m below ground with jati bamboo structs placed 1.20 m to 1.50 m apart tied with galvd. wire of 16 G to 18 G and complete with three rows half jati bamboo kamies.Complete as directed. | 600 | m | 1,833.87 | ₹11,00,322 |
| 2 | Supplying and laying of empty cement bags filled with sand/earth (As locally
available) including stiching the mouth,laying,fixing in position with supply of bags,sutlies etc. Complete as directed. | 27,093.1 | bags | 50.25 | ₹13,61,428.28 |
| 3 | Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed. | 1,350 | cum | 381.52 | ₹5,15,052 |
| 4 | Construction of Head Works
Preparing / making level the ground surface for layout of Headwork / structures for fixing the required axis line by cutting the high land and filling and levelling the low land where necessary etc, complete as directed. | 10,160.99 | sqm | 83.66 | ₹8,50,068.42 |
| 5 | Earthwork in excavation of foundation of Headwork in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head lead to a safe distance from the working place & depositing required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 cm cube with compensation all complete as directed at site (including bailing out stagnant rain water where necessary). | 33,236.52 | cum | 322.5 | ₹1,07,18,777.7 |
| 6 | Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) | 2,270.78 | sqm | 2,236.53 | ₹50,78,667.59 |
| 7 | Collection and supply of one man size 23cm to 30cm collected manually from quarry rocks; stacking at quarry site including payment and forest royalties etc. complete as directed. | 1,087.44 | cum | 1,790.33 | ₹19,46,876.46 |
| 8 | Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc. | 2,270.78 | cum | 501.69 | ₹11,39,227.62 |
| 9 | Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.)
A) River Singles
(i)Without shuttering & without Dewatering | 13,308.15 | cum | 9,580.59 | ₹12,74,99,928.81 |
| 10 | Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.)
(A) Hard river broken stone 6 mm to 20 mm size
(i)Without shuttering & without Dewatering | 1,816.81 | cum | 10,898.97 | ₹1,98,01,357.69 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_53241.xls
BOQ Document • 0.37 MB
131628517.pdf
Tender Document • 0.54 MB
SBD_DAMRA.pdf
Tender Document • 1.48 MB
131628519.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .