Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | ₹25.1 L | L1 | Accepted-AOC Below Est rate |
| 2 | L2₹25.2 LRejected-AOC | ₹25.2 L | L2 | Rejected-AOC Above Est rate |
| Sl No | Description | Qty | Unit | Vadivel S L1 | VENKATRAMAN RAJU L2 |
|---|---|---|---|---|---|
| 1.001.Rejuvenation of MI tank in Thogamalai block Kalladai panchayat Melaveliyur habitation Sempagoundankulam | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 3,686.36 | Sqm | 6.35 ₹23,408.39 | 6.4 ₹23,592.70 |
| 3.00Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. | |||||
| 4.00 | Volume of Earth Work in Existing Bund (including Consolidation using Power Roller) | 1,490 | Cum | 45.8 ₹68,242 | 46 ₹68,540 |
| 5.00 | Volume of Earth Work in Existing Bund (No Consolidation Area - U/S & D/S Slope Area ) | 4,993 | Cum | 63.2 ₹3.2 L | 63.6 ₹3.2 L |
| 6.00 | Volume of Earth Work For Channel -Bed width upto 3.00m (No consolidation) | 220.5 | Cum | 37.3 ₹8,224.65 | 37.5 ₹8,268.75 |
| 7.00 | Supply and fixing of Boundary stone of standard design and drawing as per IRC:25-1967, including painting and numbering etc., and all other incidental charges etc., complete. | 10 | no | 1,105.2 ₹11,052 | 1,111.2 ₹11,112 |
| 8.00Repair of Surplus Weir at Rejuvenation of Sempagoundankulam | |||||
| 9.00 | Dismantling Random Rubble Masonry in Cement Mortar Walls including cost and conveyance of the materials to site and all labour charges etc complete | 0.9 | Cum | 302.5 ₹272.25 | 304.2 ₹273.78 |
| 10.00Pointing For RR Masonry with CM 1:3 including cost and Conveyance of all materials to site and all loabour etc. Complete | |||||
Tender Value
₹26.4 L
EMD Value
₹27,000
Closing Date
2 Sept 2025, 3:00 pmClosed
District Collector/Chairman
II Floor, DRDA, Collectorate, Karur
Rejuvenation of 3 Nos MI tanks in Thogamalai block
2025_RDTN_596269_4
Karur District - Rejuvenation of MI Tank 2024-25 - Phase - II
Open Tender
Civil Works - Water Works
180 days
II Floor, DRDA, Collectorate
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹27,000
II Floor, DRDA, Collectorate, Karur
9 Apr 2026
22 Aug 2025
2 Sept 2025
22 Aug 2025
2 Sept 2025
25 Aug 2025
28 Aug 2025
stage.html
html • 0.04 MB
technical_712590.pdf
techsummary_712590.pdf
finance_712590.pdf
BOQ Comparative Chart
xlsx
finsummary_712590.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
4_TechBid.pdf
Tender Documents • 1.89 MB
4_PriceBid.pdf
Additional Documents • 0.87 MB
BOQ_712590.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid