Tender Value
₹82.5 L
EMD Value
₹83,000
Closing Date
16 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Und Irrigation Division, Jamnagar
Construction of Moti Bharad Checkdam on Fulzar river near village : Moti Bharad, Taluka : Jamjodhpur, Dist. : Jamnagar.
293075
01 of 2026-27
Open
Civil Works
Jamnagar
6 documents required · 6 mandatory
₹2,400
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹83,000
2 Apr 2026
2 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : BIG CHECKDAM
Construction of Moti Bharad Checkdam on Fulzar river near village :
Moti Bharad, Taluka : Jamjodhpur, Dist. : Jamnagar.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1(a) Excavation in all sort of strata and 3740.00 Cum. 79.00
formations incl. depositing the unuseful
excavated stuff as and where directed
incl. sorting and stacking useful materials
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering.
(A) IN OVER BURDEN HARD MURRUM.
1(c) (C) IN HARD ROCK 2370.00 Cum. 590.00
2 Drilling 25mm dia. holes at distant as 247.00 Rmt. 252.00
specified upto 3.00 mt. depth in
checkdam foundation and fixing anchor
bars of specified diameter with cement
grout including cleaning holes as
directed etc. (Excluding cost of Bars)
3 Providing, cutting, bending, binding and 13.94 M.T. 76574.00
fixing in position as per drawing TMT
BAR, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
16 to 18 BWG M.S.. Wire etc. complete
with all lead and lift. (B) Fe-500
4 Prov. & Laying in position cement concrete 1510.00 Cum. 3423.00
using cement , sand and crushed metal
coarse aggregate by mass and machine mix
for PCC/RCC including necessary
formworks compaction by vibrator, curing
as directed with all lead & lift etc
complete.(Excluding cost of steel) FOR
.BODY WALL, APRON, TRAINING WALL,
SIDE WALL, SPLAY WALL, KEY WALL, CUT
4/C) Controlled Concrete Grade M-15 &
5 Providing & fixing in position 100/110 11.80 Rmt. 358.00
mm dia PVC Pipe weep holes in the
retaining walls / side wall / abt. etc.
6 Earthwork / Back filling with selected 855.00 Cum. 141.00
earth brought from out side borrow area
or from excavated useful material
including watering ramming, compaction
with pneumatic temping and all lead and
lift etc. complete.
7 Providing & laying graded filters of sand, 30.00 Sq.m. 530.00
gravel / metal and over size metal (100
to 150 mm) behind the retaining wall &
wing walls as directed as per approved
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
drawing with all lead and lifts etc.
8 Providing and laying dry rubble pitching 160.00 Sqmt. 723.00
with 20 cms gravel / metal and 20 cms
and layers as base of inverted graded
filter and without header stone but incl.
hand packing trimming & dressing of
slopes etc. complete.
(b) 45 cms thick stone pitching.
9 Providing and fixing in position white 1.00 No. 1350.00
plate of size 45 x 45 x 1.8 cms including
engraving. The letters as per drawing /
directed etc. complete.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 82,49,884=96 Estimated Amount Rs. 82,49,884=96
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies except
GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.pdf
BOQ.pdf
Tender Notice No.1.pdf
Download all tender documents and submit your bid