| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹5.6 CrAccepted-AOC | ₹5.6 Cr Quoted ₹5.8 Cr | I | Accepted-AOC 1st lowest |
| 2 | II₹6.0 CrRejected-AOC CT PUBLIC SCHOOL PHAYAL KHASARA NO 597 JAKHOO MOHAL PHAIL SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 170009 | ₹6.0 Cr | II | Rejected-AOC 2nd lowest |
| 3 | III₹6.1 CrRejected-AOC | ₹6.1 Cr | III | Rejected-AOC 3rd lowest |
Tender Value
₹4.4 Cr
EMD Value
₹4.8 L
Closing Date
18 Dec 2019, 5:00 pmClosed
Executive Engineer
IPH Division Dharampur Bharari District Mandi
Construction of embankment with apron, slope pitching, toe key/wall on river side along the earthen embankment, open channel including survey investigation, designing and planning of whole project
2019_HPIPH_33094_1
10845-95 dated 04.12.2019
Open Tender
Civil Works - Water Works
Item Rate
180 days
Sidhpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,500
EE Dharampur Bharari
₹4.8 L
31 Jan 2020
4 Dec 2019
19 Dec 2019
4 Dec 2019
18 Dec 2019
4 Dec 2019
Amount
Excavation in earth work upto all depths in all classifications of soil such as spade work, jumper work, i/c pick work saturated soil including bailing or pumping out water, blasting, soft/hard rock or chiselling soft/hard rocks where blasting is prohibitted in all lifts i/c triming and dressing of sides, levelling of beds to correct grade i/c shorting,strutting, plankings, timbering and dewatering wherever required, stacking the serviceable/ unserviceable material/soil separately and then disposing of all excavated earth upto all leads and lifts, disposed earth to be levelled and neatly dressed as per the direction and to the entire satisfactions of the Engineer-in-charge. (Spade Work).
Excavation in earth work in all kinds of soil & banking in 20 cm layers i/c breaking clods, ramming/rolling & dressing ground for the purpose of making embankments or filling up ground depressions up to all leads lifts for impervious core as per the direction and to the entire satisfactions of the Engineer-in-charge. (The earth work should be of approved parameter from borrow area for filling in embankment and laid as per specifications). (Good earth).
Excavation in earth work in all kinds of soil & banking in 20 cm layers i/c breaking clods, ramming/rolling & dressing ground for the purpose of making embankments or filling up ground depressions up to all leads lifts for pervious shells as per the direction and to the entire satisfactions of the Engineer-in-charge..(The earth work should be of approved parameter from borrow area for filling in embankment and laid as per specifications). (Local earth).
Providing and laying geotextile filter behind stone pitching and crated apron having thickness of not less than 2.00mm(two ) & minimum weight 250 grams/ squaremeters(two hundred fifty) in minimum width 4 mtr. i/c lap folding and jointing etc. not less than 4.00 mtr. in width complete i/c carriage of materials within all leads & lifts as per the direction and to the entire satisfactions of the Engineer-in-charge.
Wire crates made of G.I wire filled with boulders with square cut faces against the wire(boulders filling to be measured & paid for separately) with G.I wire 5.00 mm thick corresponding to(SWG-6)of 15x15cm mesh in apron and sloping pitching including carriage of materials within all leads and lifts.
Providing & Laying 15 cm thick sand layer on top & bottom of geofabric filter to protect it , including carriage of materials within all leads & lifts as per the direction and to the entire satisfactions of the Engineer-in-charge.
Providing & laying stone filling in apron of guide banks embankement in wire crates made of G.I wire filled with boulders with squate cut faces against the wire(wire crates to be measured and paid for separately) i/c carriage of materials within all leads and lifts as per the direction and to the entire satisfactions of the Engineer-in-charge.
Providing & laying stone pitching on side slopes of guide bank & toe wall protection work with boulders with square cut faces against the wire(wire crates to be measured and paid for separately).including entire carriage of material within all leads & lifts as per the direction and to the entire satisfactions of the Engineer-in-charge.
Excavation in foundation trenches etc. in earth work lift upto a lead of 1.5 metres stacking the excavated soil not more than 3 metres clear from the edge of excavated and then returning the stacked soil when required into plinth sides of foundation in 15 cm layers consolidating wach deposited layer by ramming and watering and then depositing of all surplus excavated materials as directed within a lead of 20 metres in all kind of works (pick work 50%+jumper work 50%) as per the direction and to the entire satisfactions of the Engineer-in-charge.
Providing & Laying cement concrete 1:4:8 (1 cement:4sand:8 aggrgates 40mm nominal sizes) and curing complete including cost of form work in foundation and plinth with in all leads & lifts as per the direction and to the entire satisfactions of the Engineer-in-charge.
Providing and laying cement concrete work 1:1.5:3 (1 cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) and Curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:-
in Bed/base (main channel) with in all leads and lifts as per the direction and to the entire satisfsction of the Engineer-in-Charge.
In walls (any thickness but not less than 0.10 mtr. Thickness) attached pillasters, buttresses, plinth and string coarses etc. From top of foundation level up to floor two level and curring complete excluding the cost of form work in foundation & plinth.
Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two leve lincluding the cost of binding wire within all leads and lifts. As per the direction and to the entire satisfaction of the Engineer-in-Charge. :
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in:
Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like.
Survey investigation , design and planning of whole project, i.e earthen Embankment , teo wall and open drain channel etc. as per the direction and to the entire satisfactions of the Engineer-in-charge.
Thakur Constructions
gagan ohri
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .