Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance NO 30 PERIYAR NAGAR ERODE 638001 | ERODE | TAMIL NADU | 638001 | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.9 Cr+₹16.9 L (2.51%)Admitted-Finance | ₹6.9 Cr+₹16.9 L (2.51%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Sea Rock Infrastructure L1 | KPT CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Rubble mount groynes - Transition and Head Protection | |||||
| 1.01 | od6297/2025_2026
od281733/2023_2024 :Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and<br>sorting the stones into 100kg to 300kg category stones of approved quality having specific gravity ranging<br>from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries<br>and machineries, labour charges required at quarry and at sorting place and
measurements of categorized<br>stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with<br>approved software having printouts using contractors supplied papers, stationeries and conveyed to the<br>approved alignment of the breakwater and rehandling and forming the core of the break water to the lines<br>and levels as per the approved drawings and
inspecting the profile once in a week with tolerance of +/- 20cm<br>in final levels including all cost and labour charges, hire and operational charges of light crane and cost of<br>spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc<br>including all incidental charges etc complete as per the direction of departmental officers at site.<br>Kollam<br>District. [Based
on item 65.22] | 3,635.49 | tonne | 1,800 ₹65,43,876.6 | 1,300 ₹47,26,133.1 Lowest |
| 1.02 | od281786/2023_2024
Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br><br>Kollam District.[Based on item 65.23] | 14,849.63 | tonne | 1,800 ₹2,67,29,334 | 1,500 ₹2,22,74,445 Lowest |
| 1.03 | od281787/2023_2024
Engaging hydraulic excavator for unloading/ loading rehandled stones of 500Kg and above. | 27 | Day | 6,000 ₹1,62,000 Lowest | 15,000 ₹4,05,000 |
| 1.04 | 65.103
Moulding and supplying 0.8 cum(2T) tetrapod with graded aggregate of 40% 75mm to 40mm, 30% 40mm to 20mm and 30% 20mm to 6mm using 380kg cement/ m3 of concrete as per approved mix design of mix proportion 0.5:1:1. 46:3.22 by weight of water cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the
cement shall be 43 grade or higher) minimum cube strength requirement (i) @7 day - 20 N/mm2 (ii) @ 28 day - 30 N/mm2 and minimum density of concrete 2.5 g/cc including hire and operational charges of tools and plants, mould, curing, rehandling and stacking charges etc., complete as per the instruction of departmental officers at site . | 3,960 | each | 7,500 ₹2,97,00,000 Lowest | 9,500 ₹3,76,20,000 |
| 1.05 | 65.104
Conveying 0.8cum (2T) tetrapod from stacking yard and placing in position in two layers according to specification and forming the armour layer of breakwater to lines and levels over the secondary armour layer including hire and operational charges of tools and plants etc., complete as per the direction of the departmental officers at site | 3,960 | each | 1,050 ₹41,58,000 | 1,000 ₹39,60,000 Lowest |
Tender Value
₹5.7 Cr
EMD Value
₹2 L
Closing Date
6 May 2026, 5:00 pmClosed
MANAGING DIRECTOR KSCADC
KSCADC Building, Kamalewsaram , Manacaud P.O. Thiruvananthapuram Pin-695009
KIIFB -Shore Protection Works from Kollam Beach to Thanni-Groyne Head Protection Works(8 nos) (Re-Tender3)
2026_SCADC_830132_4
ET-94/2025-26
Open Tender
Civil Works - Others
Item Rate
360 days
Thanni
Please refer Tender documents.
6 documents required · 6 mandatory
₹11,800
₹2 L
20 Aug 2026
23 Apr 2026
8 May 2026
23 Apr 2026
6 May 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rubble mount groynes - Transition and Head Protection | |||||
| 1.01 | od6297/2025_2026
od281733/2023_2024 :Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and<br>sorting the stones into 100kg to 300kg category stones of approved quality having specific gravity ranging<br>from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries<br>and machineries, labour charges required at quarry and at sorting place and
measurements of categorized<br>stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with<br>approved software having printouts using contractors supplied papers, stationeries and conveyed to the<br>approved alignment of the breakwater and rehandling and forming the core of the break water to the lines<br>and levels as per the approved drawings and
inspecting the profile once in a week with tolerance of +/- 20cm<br>in final levels including all cost and labour charges, hire and operational charges of light crane and cost of<br>spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc<br>including all incidental charges etc complete as per the direction of departmental officers at site.<br>Kollam<br>District. [Based
on item 65.22] | 0.8 | tonne | - | - |
| 1.02 | od281786/2023_2024
Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br><br>Kollam District.[Based on item 65.23] | 1 | tonne | - | - |
| 1.03 | od281787/2023_2024
Engaging hydraulic excavator for unloading/ loading rehandled stones of 500Kg and above. | - | Day | - | - |
| 1.04 | 65.103
Moulding and supplying 0.8 cum(2T) tetrapod with graded aggregate of 40% 75mm to 40mm, 30% 40mm to 20mm and 30% 20mm to 6mm using 380kg cement/ m3 of concrete as per approved mix design of mix proportion 0.5:1:1. 46:3.22 by weight of water cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the
cement shall be 43 grade or higher) minimum cube strength requirement (i) @7 day - 20 N/mm2 (ii) @ 28 day - 30 N/mm2 and minimum density of concrete 2.5 g/cc including hire and operational charges of tools and plants, mould, curing, rehandling and stacking charges etc., complete as per the instruction of departmental officers at site . | - | each | - | - |
| 1.05 | 65.104
Conveying 0.8cum (2T) tetrapod from stacking yard and placing in position in two layers according to specification and forming the armour layer of breakwater to lines and levels over the secondary armour layer including hire and operational charges of tools and plants etc., complete as per the direction of the departmental officers at site | - | each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1434393.xls
BOQ • 0.31 MB
SBD940426.pdf
Tender Documents • 0.82 MB
Drawing.pdf
Other Document • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .