Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78,160Accepted-AOC C O GK POWER TECH ENTERPRISES VILL DOKRU PO ROHAL TEHSIL JHANDUTTA DISTT BILASPUR H P | ₹78,160 Quoted ₹78,356 | L1 | Accepted-AOC Award letter |
| 2 | L2₹83,840.92+₹5,484.92 (7.00%)Rejected-Finance VILL BAROTA JATTAN P O BERI RAJDIYA TEHSIL SADAR DISTT BILASPUR HP | ₹83,840.92+₹5,484.92 (7.00%) | L2 | Rejected-Finance On higher side |
| 3 | L2₹83,840.92+₹5,484.92 (7.00%)Rejected-Finance MANDI HIMACHAL PRADESH | ₹83,840.92+₹5,484.92 (7.00%) | L2 | Rejected-Finance On higher side |
| 4 | Rejected-Technical VILL TALSARI P O KALLAR TEHSIL SADAR DISTT BILASPUR H P | - | - | Rejected-Technical Technically Non Responsive |
Tender Value
₹78,356
Closing Date
16 Apr 2026, 11:00 amClosed
Sr. Executive Engineer
Electrical Division HPSEBL, Ghumarwin.
Tender for prov. 1-phase LT line extension to left out houses in village Bala, from existing 100 KVA 11/0.4 KV S/Stn. Bala in (E) section Nakhlera under ESD HPSEBL, Jhandutta.
2026_HPSEB_133475_1
NIT-01/2026-27
Open Tender
Electrical Works
Percentage
30 days
Ghumarwin
Please refer Tender documents.
4 documents required · 4 mandatory
₹236
16 Jul 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | Erection of LT Line | - | - | - | - |
| 0.000 | Erection of Steel tubular pole 9 mtr. Long (LT) :-Digging of pit for poles, drilling of holes in poles,,erection of poles, erection of RCC muff, erection of D-iron, shackle insulator,earth hook filling of pit and ramming,Painting of poles etc, complete in all respect. | 6 | Nos. | - | - |
| 0.000 | Stay set(LT):- Digging of pit(0.8x1.2x1.35m),fixing of stay rod, filling and ramming of pit, nozzelling and tightening, . complete in all respect. | 7 | Set | - | - |
| 0.000 | Laying, stringing and sagging of AAAC/ACSR 50 mm2, (2 wire) 1-Ø LT line:-Laying of conductor, stringing and sagging, binding with insulator, making jumpers on dead poles etc. complete in all respect.(Rate to be quoted per KM per wire) | - | KM | - | - |
| 0.000 | Laying, stringing and sagging of G.I. earth Wire, (1 wire) of 1- Ø LT line:-Laying of G.I. Wire, stringing and sagging, binding with insulator, making jumpers on dead poles etc. complete in all respect.(Rate to be quoted per KM per wire) | - | KM | - | - |
| 0.000 | Mannual carriage of 1 phase LT line material for an average lead of 1.000 Km. from road head to site of work i.e 0.320 (length/Qty) x 0.250 (lead)= 0.080 KM (Avg. lead of material).( Rate to be quoted for 1 Km lead ) | 1 | Km | - | - |
| 2Providing and supply of material | |||||
| 0.999 | Supply part of LT line | - | - | - | - |
| 0.000 | Prov. Muff.with concerete filling | 6 | Each | 0.64 | ₹3.84 |
| 0.999 | Prov. LT Stay set comp. | 7 | Nos. | 0.28 | ₹1.96 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
Biddocument01.pdf
Tender Documents • 0.43 MB
BOQ_197340.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .