| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC | ₹22.9 L | L1 | Accepted-AOC QUOTED AMOUNT IS LOWEST AND REASONABLE |
| 2 | L2₹23.9 L+₹95,773.10 (4.18%)Rejected-Finance Q 49 NEAR DEOGHAR COLLEGE MAIN GATE PO PS DEOGHAR JH 814112 | DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹23.9 L+₹95,773.10 (4.18%) | L2 | Rejected-Finance QUOTED AMOUNT IS NOT LOWEST AND NOT REASONABLE |
| 3 | L3₹24.8 L+₹1.8 L (8.02%)Rejected-Finance | ₹24.8 L+₹1.8 L (8.02%) | L3 | Rejected-Finance QUOTED AMOUNT IS NOT LOWEST AND NOT REASONABLE |
| 4 | L4₹24.8 L+₹1.9 L (8.11%)Rejected-Finance GALI NO 4 GAUSHALA ROAD VIKASH NAGAR RAMGARH CANTT RAMGARH JHARKHAND 829122 | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹24.8 L+₹1.9 L (8.11%) | L4 | Rejected-Finance QUOTED AMOUNT IS NOT LOWEST AND NOT REASONABLE |
| 5 | L5₹24.9 L+₹2.0 L (8.66%)Rejected-Finance | ₹24.9 L+₹2.0 L (8.66%) | L5 | Rejected-Finance QUOTED AMOUNT IS NOT LOWEST AND NOT REASONABLE |
| Sl No | Description | Qty | Unit | M/s Ramgarh Raj Construction Pvt Ltd L1 | M/s friend enterprises L6 | M/S KAMLESHWAR SINGH L7 | M/S Bhushan Kumar Jain L5 | M/s Ray construction L4 | M/S Parmar Construction L9 | M/S Avadh Kishor Singh L8 | M/S Sai Construction L3 | simplex infra project L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft/loose soil not exc 1.5 m wide and not exc 1.5 m in depth for foundation of etc or shafts, wells cesspits, manholes, pier holes etc and getting out complete all as specified and directed by Engineer -in-Charge. | 135 | Cum | 250 ₹33,750 | 200 ₹27,000 | 172 ₹23,220 Lowest | 275 ₹37,125 | 270 ₹36,450 | 270 ₹36,450 | 300 ₹40,500 | 383 ₹51,705 | 275 ₹37,125 |
| 2.00 | Excavation in trenches in soft/loose soil exc 1.5 m wide and not exc 3.0 m in depth for foundation of etc or shafts, wells cesspits, manholes, pier holes etc and getting out complete all as specified and directed by Engineer -in-Charge. | 75 | Cum | 350 ₹26,250 | 220 ₹16,500 Lowest | 370 ₹27,750 | 390 ₹29,250 | 380 ₹28,500 | 380 ₹28,500 | 350 ₹26,250 | 620 ₹46,500 | 385 ₹28,875 |
| 3.00 | Returning, filling in and including spreading, leveling, watering & well ramming in layers n.exc 25 cm in layer complete all as specified and directed. | 75 | Cum | 120 ₹9,000 | 150 ₹11,250 | 135 ₹10,125 | 135 ₹10,125 | 130 ₹9,750 | 150 ₹11,250 | 95 ₹7,125 Lowest | 139 ₹10,425 | 132 ₹9,900 |
| 4.00 | Removing of excavated materials to a distance n. exc 50m and depositing where directed at a level n exc 1.5m above the starting point in oft/loose soil complete all as specified and directed . | 125 | Cum | 200 ₹25,000 | 222 ₹27,750 | 222 ₹27,750 | 225 ₹28,125 | 220 ₹27,500 | 250 ₹31,250 | 165 ₹20,625 Lowest | 320 ₹40,000 | 220 ₹27,500 |
| 5.00 | Demolition and breaking up drain pipes of 150mm dia (SGSW/AC/RCC/PVC) set in cement mortar including bed concrete and removal of debris to low lying area of distance not exceeeding 100m complete all as directed by Engr-inCharge. | 200 | RM | 50 ₹10,000 Lowest | 100 ₹20,000 | 57 ₹11,400 | 60 ₹12,000 | 57 ₹11,400 | 55 ₹11,000 | 65 ₹13,000 | 54 ₹10,800 | 55 ₹11,000 |
| 6.00 | All as per serial Item No 5 here-in-before but 200mm dia pipe, complete all as specified and directed by Engineer -in-Charge | 20 | RM | 60 ₹1,200 | 120 ₹2,400 | 63 ₹1,260 | 65 ₹1,300 | 62 ₹1,240 | 60 ₹1,200 | 65 ₹1,300 | 59 ₹1,180 Lowest | 66 ₹1,320 |
| 7.00 | All as per serial Item No 5 here-in-before but 300mm dia pipe, c complete all as specified and directed by Engineer -in-Charge | 10 | RM | 65 ₹650 | 150 ₹1,500 | 65 ₹650 | 65 ₹650 | 63 ₹630 | 65 ₹650 | 63 ₹630 | 66 ₹660 | 62.4 ₹624 Lowest |
| 8.00 | S&F, Reinforced concrete drain pipes of 150mm dia class NP2 laid and jointed with collars in trenches and jointed complete all as specified and as directed by Engr-in-Charge | 200 | RM | 1,000 ₹2,00,000 | 1,200 ₹2,40,000 | 1,075 ₹2,15,000 | 1,070 ₹2,14,000 | 1,070 ₹2,14,000 | 1,100 ₹2,20,000 | 1,800 ₹3,60,000 | 364 ₹72,800 Lowest | 960 ₹1,92,000 |
| 9.00 | S&F, Reinforced concrete drain pipes of 200mm dia class NP2 laid and jointed with collars in trenches and jointed complete all as specified and as directed by Engr-in-Charge | 20 | RM | 1,200 ₹24,000 | 2,000 ₹40,000 | 1,255 ₹25,100 | 1,275 ₹25,500 | 1,250 ₹25,000 | 1,300 ₹26,000 | 2,250 ₹45,000 | 425 ₹8,500 Lowest | 1,152 ₹23,040 |
| 10.00 | S&F, Reinforced concrete drain pipes of 300mm dia class NP2 laid and jointed with collars in trenches and jointed complete all as specified and as directed by Engr-in-Charge | 10 | RM | 1,500 ₹15,000 | 2,500 ₹25,000 | 1,565 ₹15,650 | 1,575 ₹15,750 | 1,560 ₹15,600 | 1,600 ₹16,000 | 3,200 ₹32,000 | 645 ₹6,450 Lowest | 1,440 ₹14,400 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
22 Jun 2026, 2:50 pmClosed
GE RAMGARH CANTT
GE RAMGARH CANTT
REPAIR REPLACEMENT CLEANING OF WORNOUT SEWAGE LINE MANHOLE INCL CLEANING OF SEPTIC TANKS AND CLEANING OF OVER HEAD WATER TANK AT SRC IN RAMGARH CANTT
2026_MES_768855_1
8300/3410/E8
Open Tender
Civil Works
Item Rate
180 days
RAMGARH CANTT
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE RAMGARH CANTT
₹50,000
Yes
28 Aug 2026
30 May 2026
29 Jun 2026
30 May 2026
22 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in soft/loose soil not exc 1.5 m wide and not exc 1.5 m in depth for foundation of etc or shafts, wells cesspits, manholes, pier holes etc and getting out complete all as specified and directed by Engineer -in-Charge. | 135 | Cum | 100 | ₹13,500 |
| 2 | Excavation in trenches in soft/loose soil exc 1.5 m wide and not exc 3.0 m in depth for foundation of etc or shafts, wells cesspits, manholes, pier holes etc and getting out complete all as specified and directed by Engineer -in-Charge. | 75 | Cum | 100 | ₹7,500 |
| 3 | Returning, filling in and including spreading, leveling, watering & well ramming in layers n.exc 25 cm in layer complete all as specified and directed. | 75 | Cum | 10 | ₹750 |
| 4 | Removing of excavated materials to a distance n. exc 50m and depositing where directed at a level n exc 1.5m above the starting point in oft/loose soil complete all as specified and directed . | 125 | Cum | 10 | ₹1,250 |
| 5 | Demolition and breaking up drain pipes of 150mm dia (SGSW/AC/RCC/PVC) set in cement mortar including bed concrete and removal of debris to low lying area of distance not exceeeding 100m complete all as directed by Engr-inCharge. | 200 | RM | 10 | ₹2,000 |
| 6 | All as per serial Item No 4 here-in-before but 200mm dia pipe, complete all as specified and directed by Engineer -in-Charge | 40 | RM | 10 | ₹400 |
| 7 | All as per serial Item No 4 here-in-before but 300mm dia pipe, c complete all as specified and directed by Engineer -in-Charge | 10 | RM | 10 | ₹100 |
| 8 | S&F, Reinforced concrete drain pipes of 150mm dia class NP2 laid and jointed with collars in trenches and jointed complete all as specified and as directed by Engr-in-Charge | - | RM | 10 | - |
| 9 | S&F, Reinforced concrete drain pipes of 200mm dia class NP2 laid and jointed with collars in trenches and jointed complete all as specified and as directed by Engr-in-Charge | 20 | RM | 10 | ₹200 |
| 10 | S&F, Reinforced concrete drain pipes of 300mm dia class NP2 laid and jointed with collars in trenches and jointed complete all as specified and as directed by Engr-in-Charge | 10 | RM | 10 | ₹100 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
tenderdocuments3410.pdf
Tender Documents • 2.20 MB
BOQ_861018.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .