Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st rank₹3.0 LAccepted-AOC | 1st rank | Accepted-AOC Agreement executed. EMD may be released | |
| 2 | Rejected-Technical PARAVAN VILA VEEDU MELAMMAKAM MARIYAPURAM | - | Rejected-Technical 3rd lowest | |
| 3 | Rejected-Technical R K NIVAS NADUCADU NARUVAMOODU TVPM | - | Rejected-Technical 2nd lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical 4th lowest | |
| 5 | Rejected-Technical | - | Rejected-Technical 5th lowest |
Tender Value
Refer Docs
EMD Value
₹9,533
Closing Date
5 Jul 2023, 3:30 pmClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, Channel Sub Division, Neyyattinkara
Construction of bridge
2023_Irrig_584039_1
IRR/IA/TR/2424/2023_5_1_1
Open Tender
Civil Works - Bridges
Item Rate
210 days
Pashukottukonam, near CSI Church
Please refer Tender documents.
2 documents required · 2 mandatory
₹845
Yes
₹9,533
Yes
11 Aug 2023
24 Jun 2023
7 Jul 2023
24 Jun 2023
5 Jul 2023
26 Jun 2023
Amount
DETAILED ESTIMATE
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD2303/2023-2024:Name board of size 75X60 cm installed in the appropriate place visible to the public made of brick work with granite plaque should be inserted and engraving letters etc complete as per the departmental officers at site.
B RAMESH KUMAR
AJEESH KUMAR AR
R Thankamony
RAVIDAS M
Bidder Name
B RAMESH KUMAR
R SELVARAJ
R Thankamony
RAVIDAS M
AJEESH KUMAR AR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_862676.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .