Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance | -20.00% | ₹11.6 L | L1 | Admitted-Finance |
| 2 | L1₹11.6 LAdmitted-Finance HILLI FATERPUR KHARUN DAKSHIN DINAJPUR WEST BENGAL 733126 | HILLI | DAKSHIN DINAJPUR | WEST BENGAL | 733126 | -20.00% | ₹11.6 L | L1 | Admitted-Finance |
| 3 | L1₹11.6 LAdmitted-Finance KETUGRAM I DEVELOPMENT BLOCK KANDRA PURBA BARDHAMAN 713129 WEST BENGAL | BIRBHUM | WEST BENGAL | 713129 | -20.00% | ₹11.6 L | L1 | Admitted-Finance |
Tender Value
₹14.5 L
EMD Value
₹28,963
Closing Date
20 Feb 2026, 4:00 pmClosed
Secretary, Purba Bardhaman Zilla RMC
PODDAR COMMERCIAL COMPLEX (1ST FLOOR),PURBASHA BUS STAND, ALISHA, BURDWAN -713103
UPGRADATION OF EXISTING DAMAGED CONCRETE ROAD FROM UDDHARANPUR FERRY GHAT BUS STAND TO MARAGHAT AT UDDHARANPUR UNDER SITAHATI G.P. UNDER KETUGRAM-II DEV.BLOCK UNDER PURBA BARDHAMAN ZILLA R.M.C.
2026_WBSMB_1000774_1
WB/Pur.BZRMC/e-NIT-26/2025-26
Open Tender
CIVIL WORKS
30 days
UDDHARANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹28,963
Yes
Office of the Purba Bardhaman Zilla RMC
6 Mar 2026
6 Feb 2026
23 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
10 Feb 2026
Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
Providing and laying cement concrete, with or without reinforcements, in any part of foundation/sub-structure/super-structure or bridge/culverts with graded stone chips of specific nominal sizes, including screening and cleaning of course aggregates and sand, cost of cure with water, including cost and carriage of all materials but excluding cost of form work and reinforcement, with 1:1.5:3 concrete.(M-20)
For Display Board
Add GST @ 18%
Add Labour Welfare Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_2452127.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid