| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹18.0 L+₹91,425.67 (5.35%)Admitted-Finance 36 UMA PARK OPP KUBESHWAR MAHADEV MANDIR NARODA ROAD SAIJPUR BOGHA AHMEDABAD GUJARAT 382345 | AHMADABAD | GUJARAT | 382345 | L2 | Admitted-Finance | |
| 3 | L3₹18.1 L+₹1.0 L (6.00%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹18.8 L+₹1.7 L (9.74%)Admitted-Finance 0 SITHAULI KALA MOHANLALGANJ LUCKNOW GOSAIGANJ MOHANLALGANJ UTTAR PRADESH 226301 | LUCKNOW | UTTAR PRADESH | 226301 | L4 | Admitted-Finance | |
| 5 | L5₹20.5 L+₹3.4 L (20.1%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DESHDUT INFRA CONSULTANCY PRIVATE LIMITED L5 | SOMYA ENTERPRISES L4 | Aanya Construction and Infra Estates L1 | Prashant mukundbhai shah L3 | NAMAMIDEVI NARMADE SOLUTIONS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm asured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 408 | m2 | 12 ₹4,896 Lowest | 32 ₹13,056 | 28 ₹11,424 | 30 ₹12,240 | 15.5 ₹6,324 |
| 2.00 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of : T’ or ‘L’ iron or pipe | 73 | Nos | 200 ₹14,600 | 220 ₹16,060 | 222 ₹16,206 | 100 ₹7,300 Lowest | 210 ₹15,330 |
| 3.00 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. | 133.95 | Kg | 40 ₹5,358 | 30 ₹4,018.5 | 22 ₹2,946.9 Lowest | 30 ₹4,018.5 | 32 ₹4,286.4 |
| 4.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :
Of area 3 sq. metres and below | 3.95 | m2 | 500 ₹1,975 | 240 ₹948 | 333 ₹1,315.35 | 100 ₹395 Lowest | 400 ₹1,580 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 83.96 | m3 | 2,000 ₹1,67,920 | 240 ₹20,150.4 | 199 ₹16,708.04 | 150 ₹12,594 Lowest | 228 ₹19,142.88 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns up GL | 175.87 | m2 | 200 ₹35,174 Lowest | 310 ₹54,519.7 | 444 ₹78,086.28 | 500 ₹87,935 | 315 ₹55,399.05 |
| 7.00 | Centering and shuttering includingcolumns ,piers,abutments pillars,post & Struts strutting, propping etc. and removal of form work for : columns ,piers,abutments pillars,post & Struts | 150.92 | m2 | 200 ₹30,184 Lowest | 310 ₹46,785.2 | 666 ₹1,00,512.72 | 500 ₹75,460 | 878 ₹1,32,507.76 |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 11.22 | m3 | 8,000 ₹89,760 | 8,150 ₹91,443 | 6,666 ₹74,792.52 | 5,000 ₹56,100 Lowest | 6,200 ₹69,564 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.l. Thermo-Mechanically Treated bars of grade Fe-500 D or more | 1,975.39 | Kg | 100 ₹1,97,539 | 86 ₹1,69,883.54 | 79 ₹1,56,055.81 | 70 ₹1,38,277.3 Lowest | 95 ₹1,87,662.05 |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.l. Thermo-Mechanically Treated bars of grade Fe-500 D or more | 630.24 | Kg | 110 ₹69,326.4 | 87 ₹54,830.88 | 82 ₹51,679.68 | 70 ₹44,116.8 Lowest | 95 ₹59,872.8 |
Tender Value
₹21.2 L
EMD Value
₹42,473
Closing Date
19 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MAHI DIVISION
EXECUTIVE ENGINEER MAHI DIVISION SECTOR 10A GANDHINAGAR GUJARAT
Construction of Compound Wall at Jotasan Site under NWRSD, CWC, Himmatnagar
2026_CWC_925556_1
CWC/07/2026-27/MD/GNR
Open Tender
Civil Works
Works
90 days
Jotasan site SABARKANTHA
as mentioned in tender document
2 documents required · 2 mandatory
₹0
₹42,473
Yes
9 Oct 2026
9 Sept 2026
21 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
9 Sept 2026 - 16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm asured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 408 | m2 | 100 | ₹40,800 |
| 2 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of : T’ or ‘L’ iron or pipe | 73 | Nos | 100 | ₹7,300 |
| 3 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. | 133.95 | Kg | 100 | ₹13,395 |
| 4 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :
Of area 3 sq. metres and below | 3.95 | m2 | 100 | ₹395 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 83.96 | m3 | 100 | ₹8,396 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns up GL | 175.87 | m2 | 100 | ₹17,587 |
| 7 | Centering and shuttering includingcolumns ,piers,abutments pillars,post & Struts strutting, propping etc. and removal of form work for : columns ,piers,abutments pillars,post & Struts | 150.92 | m2 | 100 | ₹15,092 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 11.22 | m3 | 100 | ₹1,122 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.l. Thermo-Mechanically Treated bars of grade Fe-500 D or more | 1,975.39 | Kg | 100 | ₹1,97,539 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.l. Thermo-Mechanically Treated bars of grade Fe-500 D or more | 630.24 | Kg | 100 | ₹63,024 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_972619.xls
BOQ • 0.33 MB
JotasanTender.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .