Tender Value
Refer Docs
EMD Value
₹16.7 L
Closing Date
11 Sept 2026, 3:30 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
4 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. The tenderer are required to upload "Work Completion certificates" in support of Technical Criteria to prove their suitability as per Annexure B of tender document as detailed in Para 10.00 of TENDER DOCUMENT.
Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Fabrication and erection of steel structure or launching / de - launching of any steel girder / industrial shed / micro wave towers / transmission line towers / platform shed / steel staging work / steel chimney works / etc.
75 conditions · 2 needing a document upload
Beam bottom's line, level & width should be checked.
Beam side's line , level & plumb should be checked.
Beam to beam measurements shall be checked as per architectural drawing.
Individual level & diagonal of each slab bay shall be checked.
Slab thickness level shall be marked with nails on the peripheral beam's outer side.
Slab thickness & beam depths should be checked
Support props for slab & beam bottoms should be in line & plumb, Bamboo bracing should be done at around 4' ht from floor level. Support props for double staging terraces shall be carefully checked.
Line of external/peripheral beam's side shall be checked & should be cross supported to avoid building out of sides.
Junctions of column & beam shall be checked & should be cross supported to avoid building out of sides.
De-shuttering oil shall be applied to beam/slab shuttering
Formwork of staircase shall be checked for dimensions of tread and riser, level of treads, plumb of risers.
Reinforcement shall be checked for beams and slab as per RCC drawing.
Proper cover for bottom/sides shall be checked for beams.
Proper cover shall be checked for slab.
Electrical points, electrical piping (conduits)/fan hooks shall be checked as per drawing.
Reduction of column as per drawing shall be done if any.
Proper no. of chairs shall be provided for slab.
Parapet (pardi) bars shall be left for balconies/staircase etc.
Ring (stirrups) shall be provided at the free end of each column reinforcement
Gaps between plates/planks should be filled. Taping should be done at ply joints in care of ply shuttering
Approval of architect and RCC consultant shall be taken prior to pouring.
Check the availability of required labour strength, mixer, lift, vibrators, masons, weigh batcher, diesel/petrol and plastics sheets etc. before start of concreting.
Hidden beams/inverted beams/cantilever beams should be checked.
Check for the sunk if any as per the approved drawings.
Packing below supports props should be avoided. If not, single wooden plank should be inserted as packing
In case of large slabs, position of concrete joints shall be decided in advance as per approval by RCC consultant.
Availability of raw material for concrete/RMC per grade of concrete, water. Electricity shall be checked in advance before the start of concreting.
Concreting shall be done for the beams first & then slabs.
Compaction of concrete shall be done by vibrators & tamping rods. (Spare vibrators with fuel shall be ensured.)
The top level of slabs shall be finished by the mason and no one should be allowed to walk on the fresh finished concrete.
Carpenter shall be present below the slab shuttering during concreting to ensure the tightness of the form work.
In case of rains, the finished concrete shall be covered with the big plastic sheets.
Cast 6 cube moulds for testing.
Curing the slab shall be done with pounding method by making ponds in cement & sand mortar(1.10) of size around 5'X5' curing of beams and slabs shall be done for 7 to 10 days or as directed by the consultant.
Date of casting and slab no shall be painted on the front side beam.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Labour Cooperative Societies shall submit only 50% of bid security for which the tenderers are required to upload Registration certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that -" We are a Labour Cooperative Society and our Registration No. is .................... with .......................and hence required to deposit only 50% of Bid Security
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security on submission of Registration Certificate issued by appropriate authority. For such firms it is required to upload a copy of Registration Certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that - I/We am/are a Startup firm registered by ........................ Department of Industrial Policy and Promotion (DIPP) and my registration number is ................ valid upto ...................... (Copy enclosed) and hence exempted from submission of Bid Security.
THE OFFERS WITHOUT EARNEST MONEY EXCEPT IN CASE OF EXEMPTION CLAIMED AS PER COMMERCIAL COMPLIANCE OF NIT WILL BE SUMMARILY REJECTED.
Kota-Chittor Section: Construction of foot over bridge (FOB) at closed LC No: 05 at km: 05/13-14 between Gurla- Thalera stations under ADEN-C-Kota.
166-2026~WCR
166-2026
Open
Works - General
12 Months
Kota, Rajasthan
₹0
₹16.7 L
19 Aug 2026
19 Aug 2026
28 Aug 2026
92 items across 2 schedules · ₹8,09,69,334.21 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| EARTH WORK | — | — | — | — | |
| General | — | — | — | — | |
| Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | — | — | — | — | |
| 1 | All kinds of soil | cum | 1650 | 177.5 | 2,92,875 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | cum | 880 | 196 | 1,72,480 |
| Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. | — | — | — | — | |
| 3 | All kinds of soil | cum | 440 | 126.8 | 55,792 |
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 4 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 220 | 7,294.7 | 16,04,834 |
| Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: | — | — | — | — | |
| 5 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 132 | 9,895.2 | 13,06,166.4 |
| Centering and shuttering including strutting, propping etc. and removal of form work for : | — | — | — | — | |
| 6 | Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | Sqm | 132 | 842.5 | 1,11,210 |
| REINFORCEMENT CEMENT CONCRETE | — | — | — | — | |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 7 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 385 | 392.15 | 1,50,977.75 |
| 8 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 55 | 927.25 | 50,998.75 |
| 9 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | 220 | 736.4 | 1,62,008 |
| 10 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | 605 | 961.3 | 5,81,586.5 |
| PRE-CAST RCC | — | — | — | — | |
| 11 | Providing, transporting, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in lintels, beams and bressummers, including setting in cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering and shuttering but , excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 3.3 | 13,899.2 | 45,867.36 |
| STEEL REINFORCEMENT | — | — | — | — | |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | — | — | — | — | |
| 12 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 57200 | 107.85 | 61,69,020 |
| DESIGN MIX CONCRETE | — | — | — | — | |
| Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cem ent, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: | — | — | — | — | |
| All works upto plinth level | — | — | — | — | |
| 13 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 440 | 9,504.75 | 41,82,090 |
| All works above plinth level upto floor V level | — | — | — | — | |
| 14 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 198 | 9,860.4 | 19,52,359.2 |
| MASONRY WORK | — | — | — | — | |
| EXPOSED BRICK WALL | — | — | — | — | |
| Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor five level in : | — | — | — | — | |
| 15 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 165 | 9,095.05 | 15,00,683.25 |
| STONE WORK | — | — | — | — | |
| RANDOM RUBBLE MASONRY | — | — | — | — | |
| Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : | — | — | — | — | |
| 16 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 132 | 7,311.25 | 9,65,085 |
| STEEL WORK | — | — | — | — | |
| General | — | — | — | — | |
| 17 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 55000 | 133.7 | 73,53,500 |
| Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | — | — | — | — | |
| 18 | Hot finished welded type tubes | Kg | 33000 | 194.4 | 64,15,200 |
| 19 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | Kg | 3080 | 97.2 | 2,99,376 |
| 20 | Providing and fixing bolts including nuts and washers complete. | Kg | 880 | 159.35 | 1,40,228 |
| Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | — | — | — | — | |
| 21 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | Kg | 4400 | 172.6 | 7,59,440 |
| Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. | — | — | — | — | |
| 22 | M.S. tube | Kg | 1650 | 196.8 | 3,24,720 |
| FLOORING | — | — | — | — | |
| TILE FLOORING | — | — | — | — | |
| Chequered precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). | — | — | — | — | |
| 23 | Dark shade pigment using ordinary cement | Sqm | 66 | 1,119.5 | 73,887 |
| KOTA STONE FLOORING | — | — | — | — | |
| Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : | — | — | — | — | |
| 24 | 25 mm thick | Sqm | 66 | 1,948.25 | 1,28,584.5 |
| ROOFING | — | — | — | — | |
| SHEET ROOFING | — | — | — | — | |
| 25 | Extra for providing and fixing wind ties of 40x 6 mm flat iron section. | Metre | 2090 | 195.6 | 4,08,804 |
| RAIN WATER SPOUT AND PIPE | — | — | — | — | |
| 26 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | Sqm | 1980 | 738.65 | 14,62,527 |
| Providing and fixing precoated galvanised steel sheet roofing accessories of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : | — | — | — | — | |
| 27 | Ridges plain (500 - 600mm) | Metre | 352 | 532.35 | 1,87,387.2 |
| FINISHING | — | — | — | — | |
| CEMENT PLASTER (IN FINE SAND) | — | — | — | — | |
| 15 mm cement plaster on the rough side of single or half brick wall of mix : | — | — | — | — | |
| 28 | 1:6 (1 cement: 6 fine sand) | Sqm | 330 | 383 | 1,26,390 |
| EXTERIOR FINISHING | — | — | — | — | |
| Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : | — | — | — | — | |
| 29 | Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm | Sqm | 550 | 193.7 | 1,06,535 |
| DISMANTLING AND DEMOLISHING | — | — | — | — | |
| General | — | — | — | — | |
| Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | — | — | — | — | |
| 30 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | cum | 66 | 2,434.25 | 1,60,660.5 |
| Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | — | — | — | — | |
| 31 | In cement mortar | cum | 33 | 2,060.2 | 67,986.6 |
| Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : | — | — | — | — | |
| 32 | In cement mortar | cum | 110 | 2,458.95 | 2,70,484.5 |
| Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: | — | — | — | — | |
| 33 | R.S. Joists | Kg | 4400 | 3.4 | 14,960 |
| 34 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | Sqm | 22 | 266.45 | 5,861.9 |
| Schedule total | ₹3,76,10,565.41 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
W-420-453ScopeSpl.Conditions.pdf
ATTACHMENT
ApprovedBrandListTill11.11.2511.pdf
ATTACHMENT
RDSO-B-10467_compressed.pdf
ATTACHMENT
RDSOB10467-1.pdf
ATTACHMENT
RDSO-B-10467-2_.pdf
ATTACHMENT
RDSO-B-10467-3_.pdf
ATTACHMENT
RDSO-B-10467-4_.pdf
ATTACHMENT
RDSO-B-10467-5_.pdf
ATTACHMENT
RDSO-B-10467-6_.pdf
ATTACHMENT
RDSO-B-10467-7_.pdf
ATTACHMENT
RDSO-B-10467-8_.pdf
ATTACHMENT
TENDERDOCUMENTFROM164-2026iNCLUDEDbgFORMAT.pdf
ATTACHMENT
ANNEXURE-PCECIRCULAR2016-17-ilovepdf-compressed1-compressed.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
ATTACHMENT
Vigilanceguidelines-PublicProcurement.pdf
ATTACHMENT
Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC2026_06_16.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].