| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Fee/PreQual/Technical/Finance PLOT NO 1123 320 KN 312 HEMGIR DIST SUNDERGARH PIN 770076 | HEMGIR | SUNDERGARH | ODISHA | 770076 | -26.60% | ₹15.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.4 L+₹1.8 L (11.7%)Admitted-Fee/PreQual/Technical/Finance KONARK LANE PO ORIENT COLLIERY BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768233 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768233 | -18.00% | ₹17.4 L+₹1.8 L (11.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.5 L+₹1.9 L (12.3%)Admitted-Fee/PreQual/Technical/Finance RAMPUR COLLIERY BRAJRAJNAGAR DIST JHARSUGUDA PIN 768225 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768225 | -17.60% | ₹17.5 L+₹1.9 L (12.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.1 L
EMD Value
₹31,400
Closing Date
3 Sept 2026, 5:00 pmClosed
PE(CIVIL), KOCP
PROJECT OFFICE, KULDA OCP, BASUNDHARA AREA, AT/PO-
Cleaning and operation of 03 nos wheel washing, 01 no Effluent treatment plant(ETP) for one year under Kulda OCP of Basundhara Area
2026_MCL_364204_1
MCL/PO/KOCP/Civil/ E-Tender/26-27/06 dtd.23.08.2026
Open Tender
Civil Works - Others
Percentage
365 days
PROJECT OFFICE, KULDA OCP, BASUNDHARA AREA, AT/PO-
AS PER NIT
3 documents required · 3 mandatory
₹31,400
8 Sept 2026
24 Aug 2026
4 Sept 2026
24 Aug 2026
3 Sept 2026
24 Aug 2026
24 Aug 2026 - 27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of wheel washing, ETP day to day cleaning of all ramps and platform etc. | 305 | days | 3,447.33 | ₹10,51,435.65 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 3,050.96 | cum | 147.1 | ₹4,48,796.22 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 773.2 | cum | 74.35 | ₹57,487.42 |
| 4 | Manure or sludge Lead - 3 km carriage of materials ,earth cost per trip per unit 1 k.m (by providing tractor weekly one day)as per EIC | 478.02 | Per trip | 139.76 | ₹66,808.08 |
| 5 | Rep. of skimmer with changing of silicon endless belt, scrapers and all bearing. All complete as per direction of EIC | 1 | each | 1,58,000 | ₹1,58,000 |
| 6 | overhauling and changing of all diffuser and making up to date WITH REPAIRING OF AIR COMPRESSOR ALL complete as per direction of EIC | 1 | each | 1,15,000 | ₹1,15,000 |
| 7 | Rep. of MMF with all complete include removing cleaning of old media changing of all strainers and filling of new media all completes as per EIC | 1 | each | 1,83,000 | ₹1,83,000 |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 200 | kg | 124 | ₹24,800 |
| 9 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.54 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tendernotice_3.pdf
PDF • 1.21 MB
BOQ_377112.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .