Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC GOALAPARA MONIRAMPUR PO BARRACKPORE DIST 24 PARGANAS NORTH KOLKATA 700 120 WB | KOLKATA | 24 PARGANAS NORTH | WEST BENGAL | 700120 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹34.2 L+₹1.4 L (4.21%)Rejected-Finance 10 MAKHAN LAL SADHUKHAN LANE PO PS BARRACKPORE KOLKATA 700120 W B | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700120 | L2 | Rejected-Finance Rejected being higher than L1 | |
| 3 | L3₹34.3 L+₹1.4 L (4.30%)Rejected-Finance | L3 | Rejected-Finance Rejected being higher than L1 | |
| 4 | L4₹35.5 L+₹2.7 L (8.25%)Rejected-Finance 32 LOOTERY MOHAL ORDERLY BAZAR PO BARRACKPORE DIST 24 PARGANAS NORTH KOLKATA 700 120 W B | KOLKATA | 24 PARGANAS NORTH | WEST BENGAL | 700120 | L4 | Rejected-Finance Rejected being higher than L1 | |
| 5 | L5₹35.8 L+₹3.0 L (9.11%)Rejected-Finance 100 KUNJRA MAHAL SADAR BAZAR PO P S BARRACKPORE DIST 24 PARGANAS N KOLKATA 700120 | KOLKATA | 24 PARGANAS N | WEST BENGAL | 700120 | L5 | Rejected-Finance Rejected being higher than L1 |
| Sl No | Description | Qty | Unit | JADAV CONSTRUCTION L1 | R K CONSTRUCTION L2 | BOSE ENTERPRISE INDEX NO.E 106 2010 BKP L5 | NC BOSE AND CO L7 | BISWAS CONSTRUCTION L8 | BIKASH CHANDRA NEOGI L3 | BANERJEE CONSTRUCTION L6 | Das and Brothers L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning, dewatering and desludging of runway monsoon drain depth exc 1.50 meter but n.exc 3.00 meter and bottom width exc 1.50 meter but n.exc. 3.00 meter on either side of runway/taxi track/dispersal including removing deposited sludge, silt, vegetation or any other foreign materials of any description by pumping, mannually or mechnically method for smooth fuctioning of drain complete with removal of sludge/debries n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed.
Note:-
(a) The quoted rate deemed to be included for pumping or any type mechanically equipments engaged by the contractor.
(b) Volume of settled sludge in drain bottom after removing of water (if any) shall be measured for payment against the items. | 2,500 | Cum | 245 ₹6,12,500 Lowest | 258 ₹6,45,000 | 265 ₹6,62,500 | 272 ₹6,80,000 | 280 ₹7,00,000 | 255 ₹6,37,500 | 268 ₹6,70,000 | 260 ₹6,50,000 |
| 2.00 | Cleaning, dewatering and desludging of runway monsoon drain depth n.exc 1.50 meter and bottom width n.exc. 1.50 meter on either side of runway/taxi track/dispersal including removing deposited sludge, silt, vegetation or any other foreign materials of any description by pumping, mannually or mechnically method for smooth fuctioning of drain complete with removal of sludge/debries n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed.
Note:-
(a) The quoted rate deemed to be included for pumping or any type mechanically equipments engaged by the contractor.
(b) Volume of settled sludge in drain bottom after removing of water (if any) shall be measured for payment against the items. | 300 | Cum | 150 ₹45,000 | 145 ₹43,500 Lowest | 160 ₹48,000 | 170 ₹51,000 | 170 ₹51,000 | 155 ₹46,500 | 172 ₹51,600 | 160 ₹48,000 |
| 3.00 | Cutting / trimming / dressings of grass, saplings, herbs and grass ploughing by Bush cutter for mechnaised cleaning upto 5cm height from ground level or as per site condition alongwith runway / taxi track and removing the rubish n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed.
Note:
(a) The work will be executed alongwith runway/taxi track and link road of runways.
(b) The availability of runway to do work shall be depends on operational requirement on sunday/holiday.
(c) The T&P and labours shall be entered in airfield area after prior approval of ATC.
(d) The rate quoted by the contractor inclusive to make arrangment of T&P and labours including fuel and maintenance of T&P etc as required. | 70,000 | Sqm | 14 ₹9,80,000 Lowest | 15 ₹10,50,000 | 16 ₹11,20,000 | 17 ₹11,90,000 | 17 ₹11,90,000 | 15 ₹10,50,000 | 16 ₹11,20,000 | 16 ₹11,20,000 |
| 4.00 | Cutting / trimming / dressings of grass, roots, saplings, herbs, vegetation, small shurbs, wild bushes and grass ploughing including grown up small sapling by JCB/Bush Cutter (mechnically) or manually of gith upto 5cm and upto 5cm height from ground level or as per site condition at Kancharapara airfield and removing the rubish n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed.
Note:
(i) The work shall be executed alongwith runway/taxi track and link road of runways.
(ii) The availability of runway to do work shall be depends on operational requirement on sunday/holiday.
(iii) The T&P and labours shall be entered in airfield area after prior approval of ATC.
(iv) The rate quoted by the contractor inclusive to make arrangment of T&P and labours including fuel and maintenance of T&P etc as required. | 30,000 | Sqm | 14 ₹4,20,000 Lowest | 15 ₹4,50,000 | 16 ₹4,80,000 | 18 ₹5,40,000 | 18 ₹5,40,000 | 15 ₹4,50,000 | 17 ₹5,10,000 | 16 ₹4,80,000 |
| 5.00 | Cutting / trimming / dressings of grass, saplings, herbs and grass ploughing by tractor for mechnaised cleaning (Jungle Gim) upto 5cm height from ground level or as per site condition in longitudinal and transverse direction alongwith runway/taxi track and removing the rubish n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed.
Note:
(i) The work shall be executed alongwith runway/taxi track and link road of runways.
(ii) Daily Log sheet shall be maintained for assesment of work done hours.
(iii) The availability of runway to do work shall be depends on operational requirement in sunday/holiday.
(iv) The working hours shall be calculated as per running and working output basis of log sheet for payment purpose.
(v) The T&P and labours shall be entered in airfield area after prior approval of ATC.
(vi) The rate quoted by the contractor inclusive to make arrangment of T&P and labours including fuel and maintenance of T&P etc as required. | 1,200 | Hours | 940 ₹11,28,000 Lowest | 955 ₹11,46,000 | 975 ₹11,70,000 | 985 ₹11,82,000 | 1,000 ₹12,00,000 | 960 ₹11,52,000 | 980 ₹11,76,000 | 970 ₹11,64,000 |
| 6.00 | Demolition of brick work or stone boulder masonry, built in cement mortar including all quoins, arches, pillars etc. including removing of unserviciable bricks and debris from site complete all as specified and directed. | 4 | Cum | 690 ₹2,760 | 605 ₹2,420 | 650 ₹2,600 | 710 ₹2,840 | 700 ₹2,800 | 610 ₹2,440 | 610 ₹2,440 | 600 ₹2,400 Lowest |
| 7.00 | Material and labour for brick work with sub class `B` bricks, old size, straight or curved on plan exc 6m mean radius built in cement mortar (1:6) complete all as specified and directed. | 2 | Cum | 8,700 ₹17,400 | 7,800 ₹15,600 Lowest | 8,800 ₹17,600 | 8,650 ₹17,300 | 9,200 ₹18,400 | 8,100 ₹16,200 | 8,450 ₹16,900 | 8,000 ₹16,000 |
| 8.00 | All as per item No 7.00 above but except bricks and -ditto-.
Note:- Serviciable bricks obtained from item No 6.00 shall be reused under this item. | 2 | Cum | 2,800 ₹5,600 | 2,400 ₹4,800 | 2,900 ₹5,800 | 2,950 ₹5,900 | 3,000 ₹6,000 | 2,300 ₹4,600 Lowest | 2,750 ₹5,500 | 2,500 ₹5,000 |
| 9.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc. and removal of rubbish from the site complete all as specified and directed. | 60 | Sqm | 60 ₹3,600 | 40 ₹2,400 Lowest | 70 ₹4,200 | 75 ₹4,500 | 80 ₹4,800 | 55 ₹3,300 | 50 ₹3,000 | 50 ₹3,000 |
| 10.00 | Material and labour for 15mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar (1:4) and finish the surfaces even and smooth without using extra cement as in wall complete all as specified and directed. | 80 | Sqm | 350 ₹28,000 | 330 ₹26,400 | 360 ₹28,800 | 365 ₹29,200 | 370 ₹29,600 | 320 ₹25,600 Lowest | 345 ₹27,600 | 340 ₹27,200 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
27 Feb 2026, 6:00 pmClosed
GE AF Barrackpore
GE AF Barrackpore Post Barrackpore Dist 24 Parganas North Kolkata 700120
CLEARANCE OF VEGETATION OF RUNWAY, TAXI TRACK / DISPERSAL AREA AND MANUAL LABOUR FOR GRASS CUTTING AND CLEANING / DE-SLUDGING WITH CLEANING OF VEGETATION, BUSHES AND MAINTAINING OF STORM WATER DRAIN AT THE SIDE OF RUNWAY FOR TECHNICAL AREA OF AF STN
2026_MES_751717_1
8692/E8
Open Tender
Civil Works
Item Rate
334 days
GE AF Barrackpore
Class-D,
Category-a(i)
2 documents required · 2 mandatory
₹500
GE AF Barrackpore
₹60,000
Yes
12 Mar 2026
6 Feb 2026
2 Mar 2026
6 Feb 2026
27 Feb 2026
20 Feb 2026
Cleaning, dewatering and desludging of runway monsoon drain depth exc 1.50 meter but n.exc 3.00 meter and bottom width exc 1.50 meter but n.exc. 3.00 meter on either side of runway/taxi track/dispersal including removing deposited sludge, silt, vegetation or any other foreign materials of any description by pumping, mannually or mechnically method for smooth fuctioning of drain complete with removal of sludge/debries n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed. Note:- (a) The quoted rate deemed to be included for pumping or any type mechanically equipments engaged by the contractor. (b) Volume of settled sludge in drain bottom after removing of water (if any) shall be measured for payment against the items.
Cleaning, dewatering and desludging of runway monsoon drain depth n.exc 1.50 meter and bottom width n.exc. 1.50 meter on either side of runway/taxi track/dispersal including removing deposited sludge, silt, vegetation or any other foreign materials of any description by pumping, mannually or mechnically method for smooth fuctioning of drain complete with removal of sludge/debries n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed. Note:- (a) The quoted rate deemed to be included for pumping or any type mechanically equipments engaged by the contractor. (b) Volume of settled sludge in drain bottom after removing of water (if any) shall be measured for payment against the items.
Cutting / trimming / dressings of grass, saplings, herbs and grass ploughing by Bush cutter for mechnaised cleaning upto 5cm height from ground level or as per site condition alongwith runway / taxi track and removing the rubish n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed. Note: (a) The work will be executed alongwith runway/taxi track and link road of runways. (b) The availability of runway to do work shall be depends on operational requirement on sunday/holiday. (c) The T&P and labours shall be entered in airfield area after prior approval of ATC. (d) The rate quoted by the contractor inclusive to make arrangment of T&P and labours including fuel and maintenance of T&P etc as required.
Cutting / trimming / dressings of grass, roots, saplings, herbs, vegetation, small shurbs, wild bushes and grass ploughing including grown up small sapling by JCB/Bush Cutter (mechnically) or manually of gith upto 5cm and upto 5cm height from ground level or as per site condition at Kancharapara airfield and removing the rubish n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed. Note: (i) The work shall be executed alongwith runway/taxi track and link road of runways. (ii) The availability of runway to do work shall be depends on operational requirement on sunday/holiday. (iii) The T&P and labours shall be entered in airfield area after prior approval of ATC. (iv) The rate quoted by the contractor inclusive to make arrangment of T&P and labours including fuel and maintenance of T&P etc as required.
Cutting / trimming / dressings of grass, saplings, herbs and grass ploughing by tractor for mechnaised cleaning (Jungle Gim) upto 5cm height from ground level or as per site condition in longitudinal and transverse direction alongwith runway/taxi track and removing the rubish n.exc. 50meter to an unobjectional place from the starting point complete all as specified and directed. Note: (i) The work shall be executed alongwith runway/taxi track and link road of runways. (ii) Daily Log sheet shall be maintained for assesment of work done hours. (iii) The availability of runway to do work shall be depends on operational requirement in sunday/holiday. (iv) The working hours shall be calculated as per running and working output basis of log sheet for payment purpose. (v) The T&P and labours shall be entered in airfield area after prior approval of ATC. (vi) The rate quoted by the contractor inclusive to make arrangment of T&P and labours including fuel and maintenance of T&P etc as required.
Demolition of brick work or stone boulder masonry, built in cement mortar including all quoins, arches, pillars etc. including removing of unserviciable bricks and debris from site complete all as specified and directed.
Material and labour for brick work with sub class `B` bricks, old size, straight or curved on plan exc 6m mean radius built in cement mortar (1:6) complete all as specified and directed.
All as per item No 7.00 above but except bricks and -ditto-. Note:- Serviciable bricks obtained from item No 6.00 shall be reused under this item.
Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc. and removal of rubbish from the site complete all as specified and directed.
Material and labour for 15mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar (1:4) and finish the surfaces even and smooth without using extra cement as in wall complete all as specified and directed.
Demolition of cement concrete (unreinforced) in ground floors and paving n.exc. 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and directed.
Material and labour for PCC (1:3:6) type C2 (using 40 mm graded stone aggregate ) as in surface channels, drains and foundations, flooring, sub base, paving etc complete all as specified and directed.
Extra for forming fair finished drain or channel 80 cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred /stopped ends etc complete all as specified and directed. Note:- Only inner girth shall be measured for payment.
Materials and labour for PCC (1:2:4) type B1 (using 20mm graded stone aggregate) in lintels upto 1.5m clear span, cills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, water troughs and the like including weathering, slightly rounded or chamfered angles and throating complete all as specified and directed.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tenderdoc8692.pdf
Tender Documents • 0.93 MB
BOQ_841920.xls
BOQ • 2.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .