| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC PUTHUPPALLIL HOUSE MUTHOLY P O | MUTHOLY | KERALA | ₹3.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹4.2 L+₹69,101.69 (19.7%)Rejected-AOC | ₹4.2 L+₹69,101.69 (19.7%) | L2 | Rejected-AOC Reject |
| 3 | L3₹5.0 L+₹1.5 L (43.9%)Rejected-AOC | ₹5.0 L+₹1.5 L (43.9%) | L3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | SHAJI GEORGE L1 | HAREENDRAN K L2 | OMASSERY LABOUR CONTRACT CO-OPERATIVE SOCIETY LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix -1 : Near Thattoorparamb chappathu | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 144 | sqm | 12 ₹1,728 Lowest | 13 ₹1,872 | 15.5 ₹2,232 |
| 1.00 | OD5986/2026-2027:Excavation of deposited silt, earth, pebbles and boulders to form river bed by mechanical means
(Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including disposal of excavated earth, removal of large size boulders
lead up to 50 m and lift up to 1.5 m, depositing and levelling, neatly dressing the same to form
the damaged flooded embankment etc. complete as per the direction of deptl. officers at site. | 420 | cum | 165 ₹69,300 Lowest | 206.45 ₹86,709 | 248.2 ₹1,04,244 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 448 | cum | 150 ₹67,200 Lowest | 183.12 ₹82,037.76 | 220.2 ₹98,649.6 |
| 2.00Appendix -2 Desiltation in between Kuttippilankandithazham and Thattoorparamb chappathu | ||||||
| 2.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 140 | sqm | 12 ₹1,680 Lowest | 13 ₹1,820 | 15.5 ₹2,170 |
| 2.00 | OD6053/2026-2027:Excavation of deposited silt, earth, pebbles and boulders to form river bed by mechanical means
(Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including disposal of excavated earth, removal of large size boulders
lead up to 50 m and lift up to 1.5 m, depositing and levelling, neatly dressing the same to form
the damaged flooded embankment etc. complete as per the direction of deptl. officers at site. | 96 | cum | 170 ₹16,320 Lowest | 206.45 ₹19,819.2 | 248.2 ₹23,827.2 |
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 266.48 | cum | 160 ₹42,636 Lowest | 183.12 ₹48,796.9 | 220.2 ₹58,677.8 |
| 3.00Appendix -3 Near Kuttippilankandi thazham | ||||||
| 3.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 160 | sqm | 12 ₹1,920 Lowest | 13 ₹2,080 | 15.5 ₹2,480 |
Tender Value
₹5.4 L
EMD Value
₹13,556
Closing Date
11 Jun 2026, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer Irrigation South sub Division,Civil Station Kozhikode- 673020
GENERAL Removal of debris and desiltation in Engapuzha river- in between Thattoorparamb chappathu and Kuttippilankandi thazham in Puthuppadi panchayath
2026_Irrig_854014_1
IRR/IA/TR/3151/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Thattoorparamb chappathu and Kuttippilanka
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,200
Yes
₹13,556
Yes
13 Jul 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
11 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix -1 : Near Thattoorparamb chappathu | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | OD5986/2026-2027:Excavation of deposited silt, earth, pebbles and boulders to form river bed by mechanical means
(Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including disposal of excavated earth, removal of large size boulders
lead up to 50 m and lift up to 1.5 m, depositing and levelling, neatly dressing the same to form
the damaged flooded embankment etc. complete as per the direction of deptl. officers at site. | - | cum | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 2Appendix -2 Desiltation in between Kuttippilankandithazham and Thattoorparamb chappathu | |||||
| 2.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 2.002 | OD6053/2026-2027:Excavation of deposited silt, earth, pebbles and boulders to form river bed by mechanical means
(Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including disposal of excavated earth, removal of large size boulders
lead up to 50 m and lift up to 1.5 m, depositing and levelling, neatly dressing the same to form
the damaged flooded embankment etc. complete as per the direction of deptl. officers at site. | - | cum | - | - |
| 2.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 3Appendix -3 Near Kuttippilankandi thazham | |||||
| 3.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443366.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1443366.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .