| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.8 LAccepted-AOC | ₹17.8 L | 1 | Accepted-AOC lowest bidder |
| 2 | 2₹18.4 L+₹57,206.09 (3.21%)Rejected-Finance | ₹18.4 L+₹57,206.09 (3.21%) | 2 | Rejected-Finance Higher bid |
| 3 | 3₹19.2 L+₹1.4 L (7.77%)Rejected-Finance | ₹19.2 L+₹1.4 L (7.77%) | 3 | Rejected-Finance Higher bid |
| 4 | 4₹19.7 L+₹1.9 L (10.9%)Rejected-Finance | ₹19.7 L+₹1.9 L (10.9%) | 4 | Rejected-Finance Higher bid |
| 5 | 5₹21.3 L+₹3.5 L (19.7%)Rejected-Finance | ₹21.3 L+₹3.5 L (19.7%) | 5 | Rejected-Finance Higher bid |
| Sl No | Description | Qty | Unit | M/s Kanyal Construction and Building Material L3 | M/S PUSKAR SINGH CONT. L6 | M/S NANDAN SINGH L1 | LAXMAN SINGH L4 | PURAN SINGH L5 | M/S TRILOK SINGH KHARAYAT L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift & disposal of surplus material as directedof E- in - C Ordinery soil | 72 | Cum | 250 ₹18,000 | 444 ₹31,968 | 345.16 ₹24,851.52 | 100 ₹7,200 Lowest | 200 ₹14,400 | 356.23 ₹25,648.56 |
| 2.00 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets ,scupper etc engineer - in - charge Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications ) | 31 | Cum | 1,900 ₹58,900 | 2,372 ₹73,532 | 1,845.33 ₹57,205.23 | 500 ₹15,500 Lowest | 2,000 ₹62,000 | 1,905.25 ₹59,062.75 |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls ,retaining walls, parapets, scuppers, etc.including supply of all material, labour, T&P and royaltiies etc. | 53 | Cum | 3,700 ₹1,96,100 | 3,800 ₹2,01,400 | 3,298.6 ₹1,74,825.8 Lowest | 4,000 ₹2,12,000 | 3,800 ₹2,01,400 | 3,404.53 ₹1,80,440.09 |
| 4.00 | Lining in Stone masonry in cement mortar for substructure complete as per technical specification Clau 702,704,&1204 In cement mortar (1:5) | 67 | Cum | 3,900 ₹2,61,300 | 4,780 ₹3,20,260 | 3,718.41 ₹2,49,133.47 Lowest | 4,000 ₹2,68,000 | 4,000 ₹2,68,000 | 3,837.65 ₹2,57,122.55 |
| 5.00 | Pointing with cement mortar 1:3 | 122 | sqm | 75 ₹9,150 | 90 ₹10,980 | 70.95 ₹8,655.9 Lowest | 96 ₹11,712 | 95 ₹11,590 | 73.69 ₹8,990.18 |
| 6.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 (Hand mixing) | 11 | Cum | 6,000 ₹66,000 | 6,710 ₹73,810 | 5,221.74 ₹57,439.14 | 4,500 ₹49,500 Lowest | 7,000 ₹77,000 | 5,389.18 ₹59,280.98 |
| 7.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 10 gauge BWGGI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders weighing not less than 25 kg each. | 27 | Cum | 1,700 ₹45,900 | 1,990 ₹53,730 | 1,549.15 ₹41,827.05 | 1,000 ₹27,000 Lowest | 2,000 ₹54,000 | 1,598.98 ₹43,172.46 |
| 8.00 | Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P . required for proper completion of the work. | 3.6 | Cum | 4,000 ₹14,400 | 4,500 ₹16,200 | 3,515.16 ₹12,654.58 | 3,000 ₹10,800 Lowest | 4,000 ₹14,400 | 3,628.11 ₹13,061.2 |
| 9.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (Asper PWD Uttarakhand specifications) | 35 | Cum | 500 ₹17,500 Lowest | 1,065 ₹37,275 | 830 ₹29,050 | 500 ₹17,500 Lowest | 500 ₹17,500 Lowest | 857.31 ₹30,005.85 |
| 10.00 | R.C.C grade M 20 | 13 | Cum | 7,200 ₹93,600 | 8,150 ₹1,05,950 | 6,342.96 ₹82,458.48 | 5,000 ₹65,000 Lowest | 8,000 ₹1,04,000 | 6,546.58 ₹85,105.54 |
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
14 Mar 2026, 11:00 amClosed
Executive Engineer Irrigation Division Pithoragarh
Office of Executive Engineer Irrigation Division Pithoragarh
Renovation of Bagjibala Minor damaged due to disaster in Block Didihat District Pithoragarh Under Nabard
2026_IRDCE_92096_1
10/EE/25-26 Dated 19-02-26
Open Tender
Civil Works - Canal
Item Rate
300 days
Didihat
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Executive Engineer ID Pithoragarh
₹82,000
Yes
Pithoragarh
23 Jul 2026
21 Feb 2026
14 Mar 2026
21 Feb 2026
14 Mar 2026
22 Feb 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift & disposal of surplus material as directedof E- in - C Ordinery soil | 72 | Cum | - | - |
| 2 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets ,scupper etc engineer - in - charge Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications ) | 31 | Cum | - | - |
| 3 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls ,retaining walls, parapets, scuppers, etc.including supply of all material, labour, T&P and royaltiies etc. | 53 | Cum | - | - |
| 4 | Lining in Stone masonry in cement mortar for substructure complete as per technical specification Clau 702,704,&1204 In cement mortar (1:5) | 67 | Cum | - | - |
| 5 | Pointing with cement mortar 1:3 | 122 | sqm | - | - |
| 6 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 (Hand mixing) | 11 | Cum | - | - |
| 7 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 10 gauge BWGGI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders weighing not less than 25 kg each. | 27 | Cum | - | - |
| 8 | Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P . required for proper completion of the work. | 3.6 | Cum | - | - |
| 9 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (Asper PWD Uttarakhand specifications) | 35 | Cum | - | - |
| 10 | R.C.C grade M 20 | 13 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
bagjibalabid.pdf
Tender Documents • 4.80 MB
BOQ_109053.xls
BOQ • 0.31 MB
corrigendum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .