D C Patel
Work of erection of 66kV equipment structures Control wiring yard lighting control-room electrification & Supply & lnstallation of furniture and Supply and lnstallation of CCTV Camera etc at 66kV Jambusar Drug Park Substation.
369830
TCBRH/26-27/E-2625
Open
Electrical
Works
Bharuch
11 documents required · 10 mandatory · 1 optional
₹1,180
GETCO
₹44,403
26 Nov 2026
26 Nov 2026
26 Nov 2026
17 Dec 2026
26 Nov 2026
180 days
1 Tender No. TCBRH/26-27/E-2625
Work of erection of 66kV equipment structures
Control wiring yard lighting control-room
Works of electrification & Supply & lnstallation of furniture
and Supply and lnstallation of CCTV Camera etc
at 66kV Jambusar Drug Park Substation.
3 Estimated cost with GST in Rs.
4 Tender Fee (non-refundable)including GST Rs. 1180 {1000 + 180 (18% GST) }
5 Earnest Money Deposit amount in Rs.
On line (E-tendering) tender/ offer
6 submission last date up to 16.00 hours only
(This is mandatory)
Physical submission of Tender detail
(Receipt of EMD & tender fee online NA
Payment) , last date up to 15.00 hours. By
RPAD or SPEED POST only.
Date of opening of Tender fee, EMD cover,
Vendor registration and technical bid
physical as well as on – line opening at
16.00 Hours.
Tentative Date of on – line opening of Price Shall be intimated separately
bid, (if possible), at 11.00 Hours
10 Prices Firm
11 Time Limit 90 Days (3 Month)
12 Validity of Bid 180 days
IMPORTANT:
1. All the relevant documents as per requirement of the Tender must be submitted through online
form only. And copy of online payment receipt of Tender Fee and EMD is to be submitted by
mail on OR before due date and time. Bidder has to upload scanned copies of original
(Notarized/self-attested copies of original-as specified in tender document) Documents with bid and No physical
documents to be submitted. otherwise the offer will not be considered and no any further communication
in the matter will be entertained. The tender documents in physical form is not to be accepted.
(All the online Annexures & Price bid i.e. Annexures, GTP and price bid are to be submitted
only tender doccuments).
2. Any deviation found in Data / Details / Documents between on line offer (E-tendering) and Online
submitted documents (Tender document) of bidder, offer of the same bidder will not considered and
no any further communication in the matter will be entertained. tender will be evaluated on Data /
Details / Documents of the on line offer. For any discrepancy in online bid, online bid is considered as
final. Whatever item quoted in Annexure-IV/(4) are consider for technical evaluation. The quantity &
GST offered in online price bid shall be considered as final in case of any discrepancy.
3. It is mandatory for all the bidders to submit their tender documents by on-line (E-tendering) in
schedule time. If tender documents submitted physically in that case the same tender will not be
considered.
4. The bidders are required to fill up all the online annexure/forms. This is intended for transparency and
speedy evaluation of the bids. Instead of simply confirming / attached in bid / refer physical offer, the
Bidder shall fill in the particulars against appropriate place in respect of each line appearing in each
online annexure. Wherever required, bidder shall invariably have to submit supporting authentic
documents in the physical bid.
(In the absence of required details in the online annexure, the purchaser has every right to evaluate
the bids accordingly and bidder cannot raise any objection against any point during evaluation.)
5. Bidders are requested to remain in touch with the website for any amendment/ corrigendum or
extension of due date etc.
6. As per new guideline –It is mandatory to use CBud app.
(1) To do any type of digging only after prior intimation through “Call Before U Dig” App & as per
its term & condition.
(2) To use the App before commencing any type of digging anywhere in the state
7. The Bidder shall submit/upload all the documents, certificates, declarations, statements and other
information required under the Tender Document along with its original online bid within the stipulated
date and time for submission of bids
8. The Bidder shall be solely responsible for ensuring completeness, correctness, legibility and validity of
all such documents.
9. The Technical/Qualification Requirement (QR) evaluation of the bid shall be carried out only on the
basis of the Data / Details / Documents submitted/uploaded by the Bidder as part of its original online
offer on or before the stipulated last date and time for submission of the bid.
10. After the stipulated last date and time for submission of bids, no new, additional, substitute or
replacement document shall be accepted or considered for establishing or improving the eligibility,
Qualification Requirement (QR), technical qualification or experience of the Bidder
11. In case any document, certificate, work order, completion certificate, experience certificate,
registration certificate or other document required for establishing the eligibility/QR of the Bidder has
not been submitted/uploaded with the original online bid, the same shall not be subsequently
submitted or considered for establishing or improving the eligibility/QR of the Bidder.
12. The Owner/Tendering Authority may, wherever considered necessary, seek clarification only in
respect of the Data / Details / Documents already submitted/uploaded by the Bidder with its original
online offer, provided that such clarification does not result in any change, addition, substitution or
improvement in the substance of the original bid or in the eligibility/QR of the Bidder.
13. No clarification shall be sought or accepted for introducing a new experience, new work order, new
completion certificate or any other new document which was required to be submitted with the original
online bid but was not submitted/uploaded within the stipulated bid submission period.
14. No post-bid clarification or document submitted voluntarily by the Bidder shall be considered for
evaluation. Any clarification, if required by the Owner/Tendering Authority, shall be sought in writing
and shall be limited to the original online submission.
15. In case the required Data / Details / Documents are not available in the original online offer, the bid
shall be evaluated on the basis of the documents actually submitted/uploaded with the original online
bid and dealt with in accordance with the Tender conditions.
16. In case any document uploaded/submitted by the Bidder along with the original online bid is found to
be unreadable, illegible, corrupted, damaged or otherwise not accessible/openable, the
Owner/Tendering Authority may seek clarification/re-submission only for such document(s) which are
specifically required as per the duly filled online Annexures submitted by the Bidder, and only to the
extent permissible under the Tender Conditions
17. If the Bidder has not duly filled the relevant online Annexure(s), or has merely mentioned “As per
attached documents" or any similar general remark in place of providing the required details in the
prescribed Annexure(s), then no further communication, clarification or opportunity for submission/re-
submission of such document(s) shall be entertained, and the bid shall be evaluated on the basis of
the documents/data available in the original online offer.
18. The responsibility for ensuring that all uploaded documents are complete, properly filled, legible,
accessible, valid and correctly linked/referenced through the prescribed Annexures shall rest solely
with the Bidder.
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to SE (TR) Bharuch GETCO reserves the right to reject any OR all tenders without
assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
GETCO, CO, Bharuch
Download Tender Documents in (PDF Format) which consists of:
Part–I: Commercial Terms & Conditions
Part–II: Technical Specifications & GTP’S, Schedule “A” indicating the quantities & items, drawing if
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe”
IMPORTANT:
All the online Annexures and price bid, other tender documents (refer Table-A) must be
submitted/attached through online form only.
1. Bidder has to upload scanned copies of original (Notarized / self-attested copies of original – as
specified in tender document) documents with bid and no physical documents to be submitted by
2. Bidder has to submit the only Tender fee & EMD payment receipt in mailed with the “Name of
Work” on OR before due date and time. All such documents should not be submitted by RPAD /
speed post only. Otherwise the offer will not be considered and no any further communication in the
matter will be entertained on or before due date of submission
Online-payment, (RTGS/NEFT only). Payment of Tender Fees & EMD by RTGS/NEFT/on line
shall be encouraged. In case of payment through RTGS/NEFT bidder has to mail following
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
6 Paid Amount
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details on the same date of payment so that receipt can be
generated.
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No.
3 Name of Bank BANK OF BARODA
4 Branch Code DBBHRU
5 Address of Bank Shalimar Complex, Station Road,Bharuch-392002.Gujarat
6 IFSC Code BARB0STABRO
7 PAN No AABCG4029R
8 TAN No BRDG01026E
9 GST No 24AABCG4029R2ZC
1. In case short submission of documents with bid and / or clarification if any required from the bidder,
the required details / documents may be asked from bidder in physical form.
2. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from)
remain legible and should not be password protected.
3. All the relevant scanned documents as per requirement of the tender are to be upload through online
only on n procure portal excluding Tender fee & EMD. Physical copies of Tender fee & EMD
payment receipt not required if submitted the offer will not be considered and no any further
communication in the matter will be entertained. (All tender documents including Price bid are not to
be submitted with the physical documents.).
NOTE- Kindly give the proper detail of tender No. & work in return mail.
4. Tender will be evaluated on Data / Details / Documents of the online offer only.
5. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in
scheduled time. No documents shall be considered physically which are mentioned for on-line
submission only.
6. The bidders are required to fill up all the online annexure / forms (word file attached) and shall be
uploaded invariably. This is intended for transparency and speedy evaluation of the bids. Instead of
simply confirming / attached in bid / refer physical offer, the Bidder shall fill in the particulars against
appropriate place in respect of each line appearing in each online annexure. Wherever required,
bidder shall invariably have to upload supporting authentic documents in the online bid. (In the
absence of required details in the online annexure, the purchaser has every right to evaluate the
bids accordingly and bidder cannot raise any objection against any point during evaluation.)
7. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc.
8. No tender shall be accepted / opened in case of receipt after due date and time of tender, irrespective
of delay due to any reasons and the Corporation shall not assume any responsibility for late receipt
of tender.
9. The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS (online form) on any
Nationalized Bank only. EMD and Tender Fee NEFT/RTGS with different purchaser or agency shall
not be accepted. Tender without EMD and tender fee shall be rejected. Two separate payment
receipt for Tender fee and EMD should be submitted.
10. The GETCO reserves the right to award the work to one or more bidders, considering their technical
and financial capacity OR to reject any or all tenders or accept any tender without assigning any
reason thereof.
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to: The Superintending Engineer (TR), Gujarat Energy Transmission
Corporation Limited, Circle Office, Bharuch
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR)
GETCO, Bharuch
GUJARAT ENERGY TRANSMISSION CORPORATION
TRANSMISSION CIRCLE BHARUCH, GETCO
TENDER SPECIFICATION, FOR
Work of erection of 66kV equipment structures
Control wiring yard lighting control-room
electrification & Supply & lnstallation of furniture and
Supply and lnstallation of CCTV Camera etc at 66kV
Jambusar Drug Park Substation
Estimated Cost – Rs.
Tender fee – Rs.
EMD – Rs.
Time limit-90 days (3 month)
TECHNICAL BID
TENDER NO. TCBRH/26-27/E-2625
Qualification Requirement
1 Registration: The Bidder shall be registered contractor of GETCO for erection work of 66 KV s/s.
2 Experience: Bidder shall have executed as Main contractor minimum 01 No of 66/11KV or higher
voltage class substation with State or Central Transmission Utility or major industries OR 03 Nos of
66KV or higher voltage class Transformer/Feeder bays at same or different locations. Substations
include minimum 2 Nos. of feeder bays, 1 No. of Transformer bay. Attested Xerox copy of work orders
executed from GETCO and satisfactory completion certificate (form 3A only) from respective
department should be submitted
3. Solvency: Latest bank solvency certificate from any Bank of a sum of minimum 20 % of the estimated
cost shown in the tender.
4 Provident Fund Code: Separate provident fund code number towards firm registered with Regional P.
F. Commissioner.
5 Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy of Balance
sheet with profit and loss account & IT return of last three Financial Years.
6 Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for signing the bid
documents in case of partnership firm & self-affidavit for proprietorship firm. All such documents
shall have to be NOTARISED
7. GST Registration: The Bidder shall be registered under the GST Act and a certified copy of such
registration under the GST act indicating the GSTIN shall have to be submitted along with the bid by the
8. I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their firm.
9. Bidder shall have valid electrical contract license & approved vender of
GETCO/STU/CTU, registered under GST Act & should have CPF/PF registration
certificate.
10. All documents submitted by bidder must be self-attested.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
CHECK LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars
1 Scan copy of online payment receipt of Tender fee & EMD
All Pages of Technical Bid with Bidder Signature and Rubber Stamp
(encouraged for digitally signed)
3 Registration document as Approved Contractor in Appropriate Class
Work completion certificate in Form No.3A (Experience Certificate as main
contractor) only as Per Qualification Requirement
5 Bank Solvency Certificate
6 Provident Fund Code Number Documents
7 GST Registration Number Documents
Income Tax Return, Profit Loss Accounts and Balance sheet of Last Three
Financial Years
9 Nature of Firm:
Partnership deed/Latest Form-G/ POA/Authorized Signatory Certificate for
Partnership
Self-Affidavit/POA/Authorized Signatory Certificate for Proprietorship
10 PAN Number Document
11 Filling all Annexure
E-TENDER FOR THE WORK OF
Work of erection of 66kV equipment structures Control wiring yard
lighting control-room electrification & Supply & lnstallation of furniture
and Supply and lnstallation of CCTV Camera etc at 66kV Jambusar Drug
Park Substation
Instructions to Bidders
General Conditions of Contract
Erection Conditions of Contract
Special Conditions of Contract
Technical particulars
Forms & Appendices to be filled in by the bidders.
PART – I
GENERAL TERMS & CONDITIONS WITH COMMERCIAL BID
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Bharuch hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids for Work of erection of 66kV equipment structures Control wiring yard lighting
control-room electrification & Supply & lnstallation of furniture and Supply and lnstallation of CCTV
Camera etc at 66kV Jambusar Drug Park Substation.as detailed in the accompanying specifications in
accordance with Terms and Conditions herein. The bids shall be prepared and furnished as per these
Instructions.
2.0 Qualification Requirements of Bidders
As above listed. The above cited requirements are only indicative. The owner reserves the right to
requisition any other relevant information and also reserves the right to reject the Bid proposal of any
Bidder, if in the Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to
perform the Contract satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable for
these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
g. Bid Form and Price Schedules (BF/PS-Part III)
5.0 Knowing the Bid Document
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein, which
may in any manner, affect the scope & content of work and the costs thereof. Submission of a Bid not
substantially responsive to the Bid Document in all respects and/or failure to furnish all information
required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or is
in doubt as to the true meaning of any part, he shall make a request, in writing not later than the date of
pre Bid discussion, to the owner in triplicate. The owner will issue explanations, interpretations and
clarifications as deemed fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and time stipulated in the Bid
invitation, all such explanations, interpretations and clarifications from the Owner shall be deemed as
part of Bid Documents and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at his
own initiative or in response to a clarification requested by the intending Bidder, modify the Bidding
Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received the
Bidding Document at the address contained in the letter of request for issue of bidding document from
the Bidders. Owner will bear no responsibility or liability arising out of non-receipt of the same in time or
otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into account in
preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration by
the Bidders while they submit their bids and shall invariably enclose such documents as a part of the
C. PREPARATION OF BIDS
8.0 Language of Bids
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged
by the Bidder and the Owner, shall be written in the English language, provided that any printed
literature furnished by the Bidder may be written in another language so long as accompanied by an
English translation of its pertinent passages. Failure to comply with this may disqualify a bid. For
purposes of interpretation of the bid, the English translation shall govern.
8.2 Bid Format
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding any
printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which may
have any effect on the execution of the Contract covered under these documents and specifications.
The Owner shall not entertain any request for clarifications from the bidders, regarding such local
conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and considered
while submitting the proposals. No claim for financial adjustment to the Contract awarded under these
specifications and documents will be entertained by the owner. Neither any change in the time schedule
based on the lack of such clear information or its effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
10.1 The Bidder shall complete the Bid form inclusive of Price Schedules; Technical Data Requirements etc.
furnished in the Bidding Documents, indicating, for the services to be rendered, a brief description of
services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the Qualification
Requirements as detailed in Clause 2.0 above and Special Conditions of Contract (including Clause
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and signed by
wherever the Company Authorized Signatory specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific ITB.
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering
all the equipment erection and other installation services specified under the accompanying Technical
Specifications. It will include among others as specified therein the following: -
a) Receipt of equipments and material from GETCO Haldarwa / Bharuch Transmission/ Construction
store and transportation, storage, preservation and conservation of equipment at the Site.
b) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
c) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions of the
bidding documents permitted by the Owner and therefore, the Bidders are advised that while making Bid
Proposals and quoting prices these conditions may appropriately be taken into consideration. Bidders
are required to furnish a certificate in this regard as per the format provided in Special Conditions of
Contract in a separate sealed envelope containing Bid security, which shall accompany the Technical
Bid. Any Bid not accompanied by such certificate shall be rejected by the Owner and shall not be
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data
Sheets and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid
Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
schedules, enclosed in bid proposal sheets for erection, and other services it proposes to furnish under
the contract. The %(Percentage) above/below indicated shall be inclusive of GST applicable on required
inputs and services.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease
based in relation to unit rates of tender price schedule.
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of
the Supplier from Composition scheme during the tenure of the contract, the rate (i.e. price) mentioned
in the price bid shall be final and any additional GST will have to be borne by the tenderer himself. In no
case additional amount towards GST or otherwise will be paid / reimbursed to supplier/contractor.
Further Statutory Variation clause will not be applicable in case of Supplier /Contractor has opted for
Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will have the
option to take the prices as exclusive of taxes and duties at maximum higher slab rates for the
evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B). The
price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends to
supply the goods / services, meaning thereby the bidder has to supply the goods / services from the
relevant declared / registered place of supply only.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and
shall not be subject to variation on any account saving for change in quantity. A bid submitted with an
adjustable price quotation shall be treated as non-responsive and rejected.
14.0 Taxes and Duties: -
14.1 As regards the income Tax, surcharge on income tax and any other tax excluding GST & welfare cess
at prevailing rate, the owner shall not bear any tax liability whatsoever. The bidder shall be liable and
responsible for payment of such taxes as attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause 14.1 above the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on the
cost of items of supply included in the works contract) as may be mandatory in terms of the law. The
owner shall not bear any liability in this regard but shall issue necessary certificate in respect of such
deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract with effect
from the next day of the date submission of the bid and if the contractor is required to pay additional tax
or duty, then the owner shall reimburse the contractor the additional tax or duty so paid by the contractor
against submission by the contractor of documentary evidence to the satisfaction of the owner. This
provision will not be applicable to transaction between the contractor and his sub-contractors. Besides
the said statutory variation, no other statutory variation shall be payable by the owner.
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to those indicated by the
Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per Clause No.
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by any
order, regulation or bye-law having the force of law the amount of such increase or reduction shall be
added to or deducted from the “Contract Price” as the case may be for direct transactions between
contractor & owner, and not for bought out items. It is the Bidders responsibility to furnish details of
taxes, duties, levies etc. applicable as on the date of submission of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing tax or duty
or introduction of a new tax or duty applicable shall be entertained by the Owner during the extended
period of contract, if any, provided the extension of the contract is required by causes attributable to the
contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a
new tax or duty will be applicable only to the direct transaction between the contractor and the owner.
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat
the applicability of Tax (GST) etc in respect of this work and include the same in the quoted price. No
separate claim in this regard will be entertained by the Owner, as it is the responsibility of the Bidder to
pay all these taxes.
14.8 In addition, the conditions detailed under Special Conditions of Contract shall apply.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule
for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying
Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the major factors
in consideration of the bids.
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in General Terms and Conditions of Contract and in Erection Conditions of this Part-I.
Bidder’s attention is specifically invited to these clauses. Bid price shall include all the costs in fulfilling
all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment tools
& tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing and
commissioning including performance and guarantee tests of the equipment. If any such equipment is
listed anywhere else in the proposal and not specially mentioned in the above schedule, it shall be
deemed to have been included in the Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1: The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated
cost plus GST to be paid as under:
a) In the form of crossed DD drawn in favor of Gujarat Energy Transmission Corporation Limited
payable at Bharuch. Not accepted in Cash.
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be made
payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive. No
exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender whichever is later.
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies
within thirty days of letter of award of contract)
19.0 Format of Bid:
19.1 The Bidder shall submit bid in hard copy duly signed on each page.
19.2 All copies of the bid shall be typed or written in indelible ink and shall be signed by the Bidder on each
page or a person or persons duly authorized by the Bidder to sign the Contract. The letter of
authorization shall be indicated by written power-of-attorney accompanying the bid. All pages of the bid,
except for un-amended printed literature, shall be initiated by the person or persons signing the bid.
19.3 The Bidders must submit the qualifying data as required in Instructions to Bidders in separate envelope
sealed and enclosed in the envelope submitting proposals, super scribed as under:
Work of erection of 66kV equipment structures Control wiring yard lighting control-room
electrification & Supply & lnstallation of furniture and Supply and lnstallation of CCTV Camera etc at
66kV Lindiyat Substation
19.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initiated by the person or persons signing
19.5 Bids shall be submitted as under:
Cover-I - not required as online submission.
Cover II - not required as online submission.
Cover III - not required as online submission.
The price bid is not to be submitted with the physical documents.
21.0 Contract Quality assurance:
21.1 The Bidder shall include in his proposal the Quality Assurance Programme containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during
various phases as detailed in relevant clause of the General Technical Conditions.
21.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be followed for the
execution of the Contract will be mutually discussed and agreed and such agreed Programme shall form
a part of the Contract.
21.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being
supplied wherever specifically indicated in the tender document shall supply only from those vendors.
Such details shall be accompanied by their list of previous supplies made performance reports etc.
However, in case of orders are placed, specific approval shall be obtained from the owner for the
vendor-supplied materials.
22.0 Signature of Bids:
22.1 The bid must contain the name, residence and place of business of the person or persons making the
bid and must be signed and sealed by the Bidder with his usual signature. The names of all persons
signing should also be typed or printed below the signature.
22.2 Bid by a partnership must be furnished with full names of all partners and be signed with the partnership
name; followed by the signature(s) and designation(s) or the authorized partner(s) or other authorized
representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf
of such Corporation/Company in the matter.
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
22.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such bids
will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of the Bidder
shall be furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
23.0 Sealing and marking of bids:
Sr.No. Cover -I Cover-II Cover-III
1 Not require Not require Not require
The original Bid and accompanying documents shall be submitted by the Bidder at the date, time and
place specified.
The Bid shall be submitted by online mode only to the tender.nprocure.com. Bids submitted should
be posted with due allowance for any postal delay. The Bids received after the Due Date and Time of
opening are liable to be rejected. Telegraphic/Telex/Fax/e-mail Bids shall not be entertained.
23.3 a. Addressed to the Owner at the following address:
The Superintending Engineer (TR),
GETCO, Transmission Circle,
P. O. Maktampur, Bharuch-
24.0 Deadline for submission of bids:
24.1 The Bidders have to send Technical bid in online form only. Bids submitted by telex/telegram will not be
accepted. No request from any Bidder to the Owner to collect the proposals from airlines, cargo agent
etc. shall be entertained by the Owner.
24.3 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the
Bidding Document in which case all rights and obligations on the Owner and Bidders previously subject
to the deadline will thereafter be subject to the deadline as extended.
25.0 Late Bids
25.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
26.0 Modification and withdrawal of bids:
26.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of the
modification or withdrawal is received by the Owner prior to the deadline prescribed for submission of
26.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 23.0. The envelope should clearly indicate that the
modification is for the Technical bid. No bid modifications notice by Telex/Grams/Fax shall be
entertained by the Owner.
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration
of the period of bid validity specified by the Bidder on the Bid Form. Withdrawal/modification of a bid
during this interval may result in the Bidder’s forfeiture of its bid security.
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids in the presence of Bidder’s representatives who choose to
attend on the date and time mentioned for opening of bids in the Invitation to Bid or in case any
extension has been given thereto, on the extended bid opening date and time notified to all the Bidders
who have purchased the bidding document. The Bidder’s representatives who are present shall sign a
register evidencing their attendance.
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the Owner, at his
discretion may consider appropriate, will be announced in the Technical Bid Opening.
27.3 The price bids (On line) of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present. The date &
time of opening the Price Bid shall be intimated to all such qualified bidders by Fax/Telex, at least one
week in advance besides inviting final price bid if found appropriate after evaluation of Technical bids.
27.4 The Bidder’s name, lumpsum Bid Price, all discounts if any, modifications in the Price Bid and any such
other details as the Owner, at his discretion, may consider appropriate, will be announced/ furnished in
the Price Bid (On line) Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these specifications
and documents. All technically responsive bids shall then be examined to determine the LOWEST
EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids are
under consideration, Bidders and/or their representatives and other interested parties are advised to
refrain from contacting by any means, the owner and/or his employees/representatives on the matters
related to Bids under consideration.
29.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing and
no change in the price or substance of the bid shall be sought, offered or permitted.
30.0 Preliminary Examination:
30.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed, and whether the bids are generally in order.
30.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit
price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the total
bid amount will be corrected accordingly. If there is a discrepancy between words and figures, the
amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of the errors
as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder should
ensure that the prices furnished in various price schedules are consistent with each other. In the case of
any inconsistency in the prices furnished in the specified prices schedules to be identified in Bid Form
for this purpose, the Owner shall be entitled to consider the highest price for the purpose of evaluation
and for the purpose of award of Contract use the lowest of the prices in these schedules.
30.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid to
the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one, which
conforms to all the terms and conditions of the Bidding Document without material deviations. A material
deviation is one which affects in any way the prices, quality, quantity or delivery period of the equipment,
completion of works or which limits in any way the responsibilities or liabilities of the Bidder of any right
of the Owner as required in these specifications and documents. The Owner’s determination of a bid’s
responsiveness shall be based on the contents of the bid itself without recourse to extrinsic evidence.
30.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
30.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
attribute to material deviation, provided such waiver does not prejudice or affect the relative ranking of
any Bidder.
31.0 Evaluation of Price Bids:
31.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
31.2 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall
be derived as under:
Differential Price (DP)=n1F1+n2F2….+nnFn, where F1, F2…..Fn are the various factors in Indian
Rupees per unit of parameter differential or deficiency in the equipment and services offered as
stipulated in these specifications: n1, n2…nn are the respective parameter differential or deficiency in
the corresponding units to be determined from the Bidder’s proposal. The above factors and
corresponding units of parameter differential are derived from the Technical Specifications, Data sheets
and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D)
and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
31.3 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be rendered
as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Q + DP + D, Where
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other components
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
AWARD OF CONTRACT
32.0 Award Criteria
32.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that the
Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the sole
judge in this regard.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with the
terms and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject
all bids at time prior to award of contract, any without thereby incurring any liability to the affected Bidder
or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the Owner’s
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or e mail or FAX, to be confirmed in writing by
registered letter, that his bid has been accepted.
34.2 The notification of award will attribute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 38 .0, the
Owner will promptly notify each unsuccessful Bidder and will discharge his bid security, pursuant to
Clause 20.0.
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the Owner
will send the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 7 days of receipt of the detailed of Award, the successful bidder shall sign the same with date
and return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 15 (Fifteen) days of notification of Award.
35.4 The contractor will have to give indemnity bond for material on Non-judicial Stamp paper of value Rs. 300/-
to GETCO as per attached format. The cost of stamp paper will be borne by the contractor.
35.5 The contractor will have to give safety cum indemnity bond on Non-Judicial Stamp paper of value Rs.
300/- to GETCO against any possible claim of compensation for damage to contractor’s staff or any of
third party during the execution of work. The cost of stamp paper will be borne by the contractor.
35.6 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Transmission Circle, GETCO, Bharuch before commencement of works as per GETCO’s prescribed
Proforma .The cost of stamp paper will be borne by the contractor.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be
required to furnish a performance guarantee in form of Bank guarantee from a Public Sector Indian
bank/Scheduled, Commercial Bank in the form to be furnished. The guarantee amount shall be equal to
ten percent (10%) of the Contract price and it shall guarantee the faithful performance of the Contract in
accordance with the terms and conditions specified in these documents and specifications. The
guarantee shall be valid up to 90 days after the end of Warranty Period.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment furnished
and erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and
installed by him shall be free from all defects in design, material and workmanship and shall upon
written notice from the Owner fully remedy free of expenses to the Owner such defects as
developed under the normal use of the said equipment within the period of guarantee specified in
the relevant clause of the General Terms and Conditions in the Part-I/Special Conditions of
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be trued as limiting the damages under clause entitled “Equipment Performance
Guarantee” in Technical Specifications, Part-II and damages stipulated in other clauses in the Bid
documents.
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period,
unless otherwise specified in Special Conditions of Contract.
37.0 Submission and Evaluation of Documents / Clarification:
37.1 The Bidder shall submit/upload all the documents, certificates, declarations, statements and other
information required under the Tender Document along with its original online bid within the stipulated
date and time for submission of bids. The Bidder shall be solely responsible for ensuring completeness,
correctness, legibility and validity of all such documents.
37.2 The Technical/Qualification Requirement (QR) evaluation of the bid shall be carried out only on the
basis of the Data / Details / Documents submitted/uploaded by the Bidder as part of its original online
offer on or before the stipulated last date and time for submission of the bid.
37.3 After the stipulated last date and time for submission of bids, no new, additional, substitute or replacement
document shall be accepted or considered for establishing or improving the eligibility, Qualification
Requirement (QR), technical qualification or experience of the Bidder.
37.4 In case any document, certificate, work order, completion certificate, experience certificate, registration
certificate or other document required for establishing the eligibility/QR of the Bidder has not been
submitted/uploaded with the original online bid, the same shall not be subsequently submitted or considered
for establishing or improving the eligibility/QR of the Bidder.
37.5 The Owner/Tendering Authority may, wherever considered necessary, seek clarification only in respect
of the Data / Details / Documents already submitted/uploaded by the Bidder with its original online offer,
provided that such clarification does not result in any change, addition, substitution or improvement in the
substance of the original bid or in the eligibility/QR of the Bidder.
37.6 No clarification shall be sought or accepted for introducing a new experience, new work order, new
completion certificate or any other new document which was required to be submitted with the original
online bid but was not submitted/uploaded within the stipulated bid submission period.
37.7 No post-bid clarification or document submitted voluntarily by the Bidder shall be considered for
evaluation. Any clarification, if required by the Owner/Tendering Authority, shall be sought in writing and
shall be limited to the original online submission.
37.8 In case the required Data / Details / Documents are not available in the original online offer, the bid shall
be evaluated on the basis of the documents actually submitted/uploaded with the original online bid and
dealt with in accordance with the Tender conditions.
37.9 In case any document uploaded/submitted by the Bidder along with the original online bid is found to be
unreadable, illegible, corrupted, damaged or otherwise not accessible/openable, the Owner/Tendering
Authority may seek clarification/re-submission only for such document(s) which are specifically required
as per the duly filled online Annexures submitted by the Bidder, and only to the extent permissible under
the Tender Conditions.
If the Bidder has not duly filled the relevant online Annexure(s), or has merely mentioned “As per
attached documents" or any similar general remark in place of providing the required details in the
prescribed Annexure(s), then no further communication, clarification or opportunity for
submission/re-submission of such document(s) shall be entertained, and the bid shall be evaluated
on the basis of the documents/data available in the original online offer.
The responsibility for ensuring that all uploaded documents are complete, properly filled, legible,
accessible, valid and correctly linked/referenced through the prescribed Annexures shall rest solely with
the Bidder.
29.0 Evaluation of Online Offer:
Tender shall be evaluated on the basis of the Data / Details / Documents forming part of the original
online offer submitted/uploaded by the Bidder on or before the stipulated last date and time for
submission of the bid.
No new, additional, substitute or replacement document submitted after the stipulated last date and time
for submission of the bid shall be considered for establishing or improving the eligibility, Qualification
Requirement (QR), technical qualification or experience of the Bidder.
Clarification, if any, shall be governed strictly by Clause No. 26 of the Tender Document and shall not
result in any change or improvement in the substance of the original bid.
30.0 Online Annexures and Supporting Documents:
Bidders shall fill all online Annexures, wherever required, and shall upload all supporting authentic
documents as specified in the Tender Document.
The Bidder shall ensure that all documents required for establishing eligibility, Qualification Requirement
(QR), technical qualification and experience are duly uploaded/submitted along with the original online
bid within the stipulated date and time for submission of the bid.
The responsibility for submission/uploading of complete and valid documents required under the Tender
Document shall rest solely with the Bidder.
In case any required Data / Details / Documents are not submitted/uploaded with the original online bid,
the same shall not subsequently be accepted or considered for establishing or improving the
eligibility/QR, except for clarification strictly within the scope permitted under Clause No.
The Owner reserves the right to evaluate the bid on the basis of the Data / Details / Documents
available in the original online offer and in accordance with the provisions of the Tender Document.
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR.) CIRCLE GETCO, Bharuch or any of its
subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and
shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to time
for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials
to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and
such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir which
may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the contract
agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works
including erection, testing and putting into satisfactory operation including successful completion of
performance and guarantee tests to be performed at Site by the Contractor including cost of insurances.
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized representative of
the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’ shall mean the official notice issued by the Owner
notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or
seal as the case may be.
1.20 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a function
of the Owner/Engineer.
1.17 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.18 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine
and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract
Documents.
1.19 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in the
1.20 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which
cannot be detected during inspection, testing etc, based on the technology available for carrying out
such tests.
1.21 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any :
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter of
the Contract.
1.22 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.23 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by provisions in other
parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be deemed to form an
integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract, the Special Conditions of Contract. and all other
documents included under Part-I, Part-II and Part-III.
b) Specifications of the erection of the equipments and other technical services to be provided under
the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract except
to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special terms
and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be referred to the
Engineer whose decision shall be considered as final and binding upon the parties.
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or on
behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be made
in confidence and shall extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
4.3 The Contractor shall not communicate or use in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the site,
dimensions, quantity, quality or other information, concerning the works unless prior written permission
has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain
the property of the Owner and shall be returned (in all copies) to the Owner on completion of the
Contractor’s performance under the Contract if so required by the Owner.
5.0 TRANSMISSION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will be
treated as a single Contract. Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of all
the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site installation
testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch documents
be required to execute an Indemnity Bond in favour of the Owner in the form acceptable to the
Superintending Engineer (TR.) GETCO Bharuch for keeping the equipment in safe custody and to utilize
the same exclusively for the purpose of the said Contract. Samples of proforma for the Indemnity Bond
will be furnished during award of Contract.
5.3 The Contract shall in all respects be trued and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Bharuch shall have
exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 15 days of the acceptance of the
Letter of Award, at the office the Owner at Bharuch on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated time,
the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one
signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be trued to be a waiver of
such provisions, rights or options or in anyway to affect the validity of the Contract. The exercise by
either party of any of its rights herein shall not preclude or prejudice either party from exercising the
same or any other right it may have under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the clause
entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
11.0 TIME – THE ESSENCE OF CONTRACT
11.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without
or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the
essence of the Contract. The Contractor shall so organize his resources and perform his work as to
complete it not later than the date agreed to.
11.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as design, procurement,
manufacturing, shipment and field erection activities within seven (7) days of the date of LOI.
11.3 The above bar chart shall be compatible with the Owner’s computer environment and furnished to the
Owner on such media as may be desired by the Owner.
12.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given
by the respective Transmission sub division unless otherwise provided in LOI.
13.0 PENALTY FOR DELAY
13.1 If the Contractor fails to successfully complete the commissioning within the time fixed under the
Contract, the Contractor shall pay to the Owner as penalty a sum specified for each specified period of
delay. The details of such penalty are brought out in the accompanying Special Conditions of Contract
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
Contract prices plus GST detailed in the Special Conditions of Contract (SCC).
14.0 GUARANTEE
14.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss
or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified promptly
and he shall assist wherever possible in making necessary corrections. This shall not relieve the
Contractor of his liabilities under the terms and conditions of the Contract.
14.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so rectified or corrected until the expiry of six
(6) months from the date of such rectification or correction. If any defects are not rectified within a
reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost but without
prejudice to any other rights which the Owner may have against the Contractor in respect of such
14.3 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
14.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
15.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the
Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be responsible
for payment of all Indian duties, levies and taxes lawfully assessed against the Contractor for his
personal income & property only.
16.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the
failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or
things under the Contract, or for damage or injury caused by the alleged omission or negligence on the
part of the Contractor, his agents, representatives or his Sub-Contractors, or in connection with any
claim based on lawful demands of Sub-Contractors, workmen, suppliers or employees, the Contractor
shall in all such cases indemnify and keep the Owner, and the Engineer and/or his representative,
harmless from all losses, damages, expenses or decrees arising of such action.
17.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor
from all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as the
Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments made
under the Contract shall be treated as on-account payments.
18.0 ENGINEER’S DECISION
19.0 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
19.1 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days
after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the Engineer’s
decision and the decision shall become final and binding.
19.2 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent to
the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to
as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the
Contractor except as directed in writing by the Engineer, but the Engineer shall have full powers subject
to the provisions hereinafter contained, from time to time during the execution of the Contract, by notice
in writing to instruct the Contractor to make such variation without prejudice to the Contract. The
Contractor shall carry out such variation and be bound by the same conditions as far as applicable as
though the said variations occurred in the Contract Documents. If any suggested variations would, in
the opinion of the Contractor, if carried out, prevent him from fulfilling any of his obligations or
guarantees under the Contract, he shall notify the Engineer thereof in writing and the Engineer shall
decide forthwith whether or not, the same shall be carried out and if the Engineer confirms his
instructions, the Contractor’s obligations and guarantees shall be modified to such an extent as may be
mutually agreed. Any agreed difference in cost occasioned by any such variation shall be added to or
deducted from the Contract Price as the case may be.
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials
are already prepared or any design, drawings or pattern made or work done as per the contract requires
to be altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement of
carrying out the alterations or additional or substituted work which either then or later on, will in the
opinion of the Contractor, involve a claim for additional payment, the Contractor shall immediately and in
no case later than thirty (30) days, after receipt of the instructions aforesaid and before carrying out the
instructions, advise the Engineer to that effect. But the Engineer shall not become liable for payment of
any charges in respect of any such variations, unless the instructions for the performance of the same
shall be confirmed in writing by the Engineer.
20.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing, so
to the extent of any change in the price, before the Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct
the Contractor, in writing, during the execution of the Contract to vary the quantities of the items or
groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section GCC
of this Volume-I. The Contractor shall carry out such variations and be bound by the same conditions
as though the said variations occurred in the Contract Documents. However, the Contract Price shall be
adjusted at the rates and the prices provided for the original quantities in the Contract.
21.0 CHANGE OF QUANTITY
21.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms & conditions.
Such variations unless otherwise specified in the accompanying Special Conditions of Contract and/or
Technical Specifications, shall not be subjected to any limitation for the individual items but the total
variations in all such items under the Contract shall be limited to a percentage of the Contract price as
specified in the Special Conditions of Contract.
21.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for the
change in quantities as above.
22.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers
and freely exchange with them such technical information as is necessary to obtain the most efficient
and economical design and to avoid unnecessary duplication of efforts. The Engineer shall be provided
with three copies of all correspondence addressed by the Contractor to other Contractors and
Consulting Engineers of the Owner in respect of such exchange of technical information, wherever
23.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor
any order by the Owner or the Engineer for payment of money or any payment for or acceptance of, the
whole or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any
possession taken by the Engineer shall operate as a waiver of any provision of the Contract, or of any
power herein reserved to the Owner or any right to damages herein provided nor shall any waiver of any
breach in the Contract be held to be a waiver of any other or subsequent breach.
24.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the rights
of the Owner against the Contractor or relieve the Contractor of his obligation for the due performance
of the Contract, or be interpreted as approval of the Works done or of the equipment furnished and no
certificate shall create liability for the Owner to pay for alterations, amendments, variations or additional
works not ordered, in writing , by the Engineer or discharge the liability of the Contractor for the
payment of damages whether due, ascertained, or certified or not or any sum against the payment of
which he is bound to indemnify the Owner, nor shall any such certificate nor the acceptance by him of
any sum paid on account or otherwise affect or prejudice the rights of the Owner against the Contractor.
25.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own cost
submit periodic progress reports as may be reasonably required by the Engineer with such materials as,
charts, net-works, photographs, test certificates, etc. Such progress reports shall be in the form and size
as may be required by the Engineer.
26.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished and erected
by the Contractor, the Engineer shall issue to the Contractor a Taking Over Certificate as a proof of the
final acceptance of the equipment. Such certificate shall not unreasonably be withheld nor will the
Engineer delay the issuance thereof on account of minor omissions or defects which do not affect the
commercial operation and/or cause any serious risk to the equipment. Such certificate shall not relieve
the Contractor of any of his obligations which otherwise survive, by the terms and conditions of the
Contract after issue of such certificate.
27.0 PAYMENT
27.1 The payment to the Contractor for the performance of the works under the Contract will be made by the
Owner as per the guidelines and conditions specified herein. All payments made during the Contract
shall be on account payments only. The final payment will be made on completion of all Works and on
fulfillment by the Contractor of all his liabilities under the Contract.
27.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
27.3 Terms.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of conditions
specified thereof.
28.0 Payment Schedule
28.1 Application for Payment
28.2 The Contractor shall submit application for the payment in the prescribed Performa of the Owner.
Performa for application for payment will be as prescribed.
29.1 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the equipment
shipped/brought on to the site pursuant to the Contract up to the date mentioned in the application and
for the period covered since the last preceding certificate, if any.
29.2 Every interim payment certificate shall certify the Contract value of the Works executed upto the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any
interim payment certificate in respect of the works that, according to the decision of the Engineer, does
not comply with the Contract.
29.3 Mode of Payment
29.4 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank or directly to
the Contractor as per the payment schedule.
29.5 The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland
transportation (including port handling), insurance and the erection portion of the Works shall be made
direct to the Contractor by the Owner.
29.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after
signing the Contract Agreement. The payments linked with the dispatch of materials shall only be made
after production of all dispatch documents as specified in the relevant Contract conditions which will
interalia include the Material Inspection Clearance Certificate issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of quality
check points involved in the quantum of work billed.
30.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. The Owner to the
Contractor shall bill all such claims regularly as and when they fall due. Such bills shall be supported by
appropriate and certified vouchers or explanations, to enable the Contractor to properly identify such
claims. Such claims shall be paid by the Contractor within thirty (30) days of the receipt of the
corresponding bills and if not paid by the Contractor within the said period, the Owner may then deduct
the amount, from any money due or becoming due by him to the Contractor under the Contract or may
be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
31.0 INSURANCE
31.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all perils
detailed herein. The form and the limit of such insurance as defined herein together with the under-
writer in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period of Contract shall be
of Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall be in the joint
name of the Owner and the Contractor. The Contractor shall, however, be authorized to deal directly
with Insurance Company or Companies and shall be responsible in regard to maintenance of all
insurance covers. Further the insurance should be in freely convertible currency.
31.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into
satisfactory operation and all activities to be performed till the successful completion of commissioning
of the equipment shall be to the account of the Contractor. The Contractor shall be responsible for
preference of all claims and make good the damages or loss by way of repairs and/or replacement of
the equipment, damaged or lost. The transfer of title shall not in any way relieve the Contractor of the
above responsibilities during the period of Contract. The Contractor shall provide the Owner with copy
of all insurance policies and documents taken out by him in pursuance of the Contract. Such copies of
documents shall be submitted to the Owner immediately after such insurance coverage. The Contractor
shall also inform the Owner in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc., as
may be necessary well in time.
31.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied
risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit,
theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions, accidents
of all kinds, etc. The scope of such insurance shall be adequate to cover the replacement/reinstatement
cost of the equipment for all risks up to and including delivery of goods and other costs till the equipment
is delivered at Site. The insurance policies to be taken should be on replacement value basis and/or
incorporating escalation clause. Notwithstanding the extent of insurance cover and the amount of claim
available from the underwriters, the Contractor shall be liable to make good the full
replacement/rectification value of all equipment/materials and to ensure their availability as per project
requirements.
31.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account
and will be included in Contract Price, However, the Owner may from time to time, during the pendency
of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and in such a case,
the parties to the Contract will agree for a mutual settlement, for reduction in Contract price to the extent
of reduced premia amount. The Contractor, while arranging the insurance shall ensure to obtain all
discounts on premia, which may be available for higher volume or for reason of financing arrangement
of the project.
31.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
31.6 Special Conditions of Contract details out the various insurance liabilities.
32.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
33.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
34.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or
his authorized agents, then the Contractor shall be given due extension of time for the completion of the
Works, to the extent such omission on the part of the Owner has caused delay in the Contractor’s
performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be
35.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if such
delays have resulted in any increase in cost. The Owner shall examine the justification for such a
request for claim and if satisfied, the extent of compensation shall be mutually agreed depending upon
the circumstances at the time of such an occurrence.
36.0 FORCE MAJEURE
36.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence could
not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics:
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other
in writing of such causes.
36.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
other causes.
37.0 SUSPENSION OF WORK
37.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the Works
will be issued by the Engineer to the Contractor in writing. The time for completion of the works will be
extended for a period equal to duration of the suspension.
37.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the
works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to some
default on the part of the Contractor or his Sub-Contractor.
38.0 CONTRACTOR`S DEFAULT
38.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse or
neglect to comply with any reasonable order given to him, in writing by the Engineer in connection with
the works or shall contravene the provisions of the Contract, the Owner may give notice in writing to the
Contractor to make good the failure, neglect or contravention complained of. Should the Contractor fail
to comply with the notice within thirty (30) days from the date of serving the notice, then and in such
case the Owner shall be at liberty to employ other workmen and forthwith execute such part of the
works as the Contractor may have neglected to do or if the Owner shall think fit, without prejudice to any
other right he may have under the Contract to take the work wholly or in part out of the Contractor’s
hands and re-contract with any other person or persons to complete the works or any part thereof and in
that event the Owner shall have free use of all Contractor’s equipment that may have been at the time
on the Site in connection with the works without being responsible to the Contractor for fair wear and
tear thereof and to the exclusion of any right of the Contractor over the same, and the Owner shall be
entitled to retain and apply any balance which may otherwise be due on the Contract by him to the
Contractor, or such part thereof as may be necessary, to the payment of the cost of executing the said
part of the Works or of completing the Works as the case may be. If the cost of completing of works or
executing part thereof as aforesaid shall exceed the balance due to the Contractor shall pay such
excess. Such payment of excess amount shall be independent of the liquidated damages for delay
which the Contractor shall have to pay if the completion of works is delayed.
38.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
38.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not entitle
the Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof. The
Contract Performance Guarantee shall be valid for the full value and for the full period of the Contract
including guarantee period.
39.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
39.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than
those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event give
fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
39.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to
the extent they are related to the work terminated and terms satisfactory to the Owner, stop all further
sub-contracting or purchasing activity related to the work terminated, and assist Owner in maintenance,
protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
39.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if
the Contractor is a partnership concern and one of the partners dies then unless the Owner is satisfied
that the legal representatives of the individual Contractor or of the proprietor of the propriety concern
and in the case of partnership, the surviving partners, are capable of carrying out and completing the
Contract the Owner shall be entitled to cancel the Contract as to its incompleted part without being in
any way liable to payment of any compensation to the estate of deceased Contractor and/or to the
surviving partners of the Contractor’s firm on account of the cancellation of the Contract. The decision
of the Owner that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on the parties. In
the event of such cancellation the Owner shall not hold the estate of the deceased Contractor and/or the
surviving partners of the estate of the deceased Contractor and/or the surviving partners of the
Contractor’s firm liable to damages for not completing the Contract.
40.0 FRUSTRATION OF CONTRACT
40.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section 56 of
the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance portion of
the Contract, subject to provisions contained in sub-clause 45.3 below.
40.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason of
willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall be
suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties
hereto shall be relieved from carrying out further obligations under the Contract treating it as frustration
of the Contract.
40.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on
quantum merit_ basis, which shall be determined by mutual agreement between the parties.
41.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor or
his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their behalf
in relation to the obtaining or to the execution of this or any other Contract with the Owner, shall in
addition to any criminal liability which it may incur, subject the Contractor to the cancellation of this and
all other Contracts and also to payment of any loss or damage to the Owner resulting from any
cancellation. The Owner shall then be entitled to deduct the amount so payable from any money
otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
42.0 SETTLEMENT OF DISPUTES
42.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
42.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor,
arising out of the Contract for the performance of the Works whether during the progress of the Works
or after its completion or whether before or after the termination, abandonment or breach of the
Contract, it shall, in the first place, be referred to and settled by the Engineer, who, within a period of
thirty (30) days after being requested by either party to do so, shall give written notice of his decision to
the Owner and the Contractor.
42.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by the
Contractor who shall proceed with the Works with all due diligence, whether he or the Owner requires
arbitration as hereinafter provided or not.
42.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the said
decision shall become final and binding on the parties.
42.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with any
such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty days, as the
case may be, either party may require that the matters in dispute be referred to arbitration as hereinafter
43.0 ARBITRATION
43.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become final
or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
43.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the Contractor and
the Owner and the third to be appointed as an umpire by both the arbitrators in accordance with the
Indian Arbitration Act. If either of the parties fails to appoint its arbitrator within sixty (60) days after
receipt of a notice from the other party invoking the Arbitration clause, the arbitrator appointed by the
party invoking the arbitration clause shall become the sole arbitrator to conduct the arbitration.
43.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration Act,
or any statutory modification thereof. The venue of arbitration shall be Bharuch.
43.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for making the
award. In the event of any of the aforesaid arbitrators dying, neglecting, resigning or being unable to act
for any reason, it will be lawful for the party concerned to nominate another arbitrator in place of the
outgoing arbitrator.
43.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction, certification
or valuation of the Engineer in accordance with the Contract, and neither party shall be limited in the
proceedings before such arbitrators to the evidence or arguments put before the Engineer for the
purpose of obtaining the said decision.
43.4 No decision given by the Engineer in accordance with the foregoing provisions shall disqualify him as
being called as a witness or giving evidence before the arbitrators on any matter whatsoever relevant to
the dispute or difference referred to the arbitrators as aforesaid.
43.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to carry out their
respective obligations under the Contract.
44.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every month, a statement covering payments claimed and the
payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The
Contractor shall also prepare and submit a detailed account of Owner Issue materials received and
utilized by him for reconciliation purpose in a format to be discussed & finalized with the Owner before
the award of Contract.
45.0. (A) Bidder should note that Way leave clearance for execution of work and compensation for Right of Way
/ Way Leave / Tree-Crop damages etc. to be paid as per GoG guideline received on dtd July- 2026 is
in scope of GETCO. So matter related to payment of RoW is not applicable to bidder in GCC, ECC,
SCC and Technical specifications.
(B) All the procedure regarding RoW compensation is to be carried out by Agency is as follows:
a) Identification of Land Owner, their Land Survey No. with supporting documents i.e. 7/12 Utara,
b) Handing over / distribution of Notice to concern land owners.
c) Plotting of line route on tikka map.
d) Preparation of “Panchnama Case” and follow-up with concern Sarpanch / Talati / Mamlatdar or
concern Revenue Authority as well as Land Owners / Farmers for their signature & thereof.
e) Preparation of RoW case for submission of Office of the District Magistrate, etc. and also follow-
up with them.
f) Follow-up with concern authority for getting statutory approvals including Police Department.
46. Relationship with employee:
Every bidder should, at time of submission of bid, give a declaration as under,
“If in any Bidder Company / Firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering Company or his / her relative as defined in
section 2(77) of the Company’s Act. 2013 is 10% or more, the tendering Company will not deal
with such Company / Firm at all.
Tenderer therefore, must specifically disclose the fact in his technical bid. Non-disclosure of such
facts would immediately disqualify the tenderer for further dealing with the tendering company.”
47. Conflict of Interest among Bidders / Agents
A bidder shall not have conflict of interest with other bidders. Such conflict of interest can lead to anti-
competitive practices to the detriment of Procuring Entity’s interests. The bidder found to have a
conflict of interest shall be disqualified. A bidder may be considered to have a conflict of interest with
one or more parties in this bidding process, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any of them;
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts them
in a position to have access to information about or influence on the bid of another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a bidder in
more than one Bid will result in the disqualification of all bids in which the parties are involved.
However, this does not limit the inclusion of the components/ sub-assembly/ assemblies from
one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their behalf in a
particular tender enquiry. One manufacturer can also authorize only one agent/ dealer. There
can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or
technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units, or
more than one unit having common business ownership/ management, only one unit should
quote. Similar restrictions would apply to closely related sister companies. Bidders must
proactively declare such sister/ common business/ management units in same/ similar line of
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as amended
from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that bidder shall not have
conflict of interest with other bidders, as above.
48. Use of ‘Call Before u Dig’ (CBuD) mobile application:
Bidder is note that it is mandatory to use ‘Call Before u Dig’ (CBuD) mobile application for all
excavators prior to any type of excavation / digging.
49. Responsibility for correctness of the information submitted in the bid lies with bidder. If
any information furnished in the bid is proved to be false at a later date, GETCO reserve right
to reject the bid and the bid will not only be rejected but the bidder will be BLACKLISTED as
per GUVNL Policy.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
ERECTION CONDITIONS OF CONTRACT
1.0 GENERAL
1.1 The following shall supplement the conditions already contained in other parts of these specifications &
document and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative
at Site suitably designated for the purpose of overall responsibility and coordination of the works to be
performed at Site. Such person shall function from the Site office of the Contractor during the pendency
of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the performance
of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the Payment of
Wages Act (both of the Government of India) and the rules made thereunder in respect of any employee
or workman employed or engaged by him or his Sub-Contractor. He shall abide by labour laws and
others as specified in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract shall
be to the account of the Contractor. Should any such inspection or registration need to be re-arranged
due to the fault of the Contractor or his Sub Contractor, the additional fees to such inspection and/or
registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection, testing and
commissioning of the equipment to be supplied & erected under the Contract. The Owner shall continue
to hold the lien on all such equipment throughout the period of Contract. No material brought to the Site
shall be removed from the Site by the Contractor and/or his Sub-Contractors without the prior written
approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the
Owner may approve and the Owner shall give the Contractor reasonable facilities for carrying out the
4.3 In the execution of the works, no person other than the Contractor or his duly appointed representative,
Sub- Contractor and workmen, shall be allowed to do work on the Site, except by the special
permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative, shall be
communicated to the said authorized resident representative of the Contractor and the representative
shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner
and doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange to
perform his work as to minimize, to the maximum extent possible, interference with the work of other
Contractors and their workmen. Any injury or damage that may be sustained by the employees of the
other Contractors and the Owner, due to the Contractor’s work shall promptly be made good at the
Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such employee
has misconduct himself or is incompetent or negligent or otherwise undesirable and then the Contractor
shall remove such a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method of
work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the field
activities. Such reviews shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor will be entertained
because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The
Contractor shall be solely responsible for the safety, adequacy and efficiency of plant and equipment
and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the
safety of all persons employed by him or his Sub–Contractor and all the properties under his custody
during the performance of the work. This requirement shall apply continuously till the completion of the
Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall highlight
comparison to the schedules. The report shall also indicate the reasons for the variance between the
scheduled and actual progress and the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule for
the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances
and other payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency
under any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour
Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner may make
such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
13.1 Space
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at
site, land for Transmission of Contractor’s field office, workshop, stores, etc. required for execution of
the Contract. Any such temporary Transmission shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and
unless the Contractor has handed over the vacant possession of land allotted to him for the above
purpose, the payment of his final bill shall not be made.
13.2 Electricity:
Power supply:
Where power supply is available with the Owner for Transmission purpose the same will be provided at
the job site at one point of the distribution system as may be decided by Engineer. Electricity furnished
will be 440 volts, 3 phase, 50 cycles and 230 volts, 1 phase, 50 cycles. Each Contractor shall provide
and install all necessary transformers, switchgears, wiring fixtures, bulbs and other temporary
equipment for further distribution and utilization of energy for power and lighting and shall remove the
same on completion of the work. Should, however, electricity be used in the Contractor’s labour/staff
colony, the power so consumed shall be charged at the prevailing tariff rate of the GUVNL as prevalent
for that area at the time of award of work; the supply may be withdrawn if the power is used for
purposes other than for the work of the project and the Contractor shall not be entitled to any claim
whatsoever on account of any such action taken by the Engineer. For this purpose, contractor shall
have to apply to DISCOM for separate temporary connection on his name.
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the Transmission equipments; tools, tackles and scaffoldings required
for pre-assembly, erection, testing and commissioning of the equipment covered under the Contract. He
shall submit a list of all such materials to the Engineer before the commencement of work at Site. These
tools and tackles shall not be removed from the Site without the written permission of the Engineer.
14.2 First-aid
14.3 The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personnel shall be trained in administering
first-aid.
14.4 Cleanliness
14.4.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number of
personnel to keep the work area clean. Materials and stores shall be so arranged to permit easy
cleaning of the area. In areas where equipment might drip oil and cause damage to the floor surface, a
suitable protective cover of a flame resistant, oil proof sheet shall be provided to protect the floor from
such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The
Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical control
points will be established and marked by the Engineer at site at suitable points. These points shall be
used as datum for the works under the Contract. The Contractor shall inform the Engineer well in
advance of the times and places at which he wishes to do work in the area allotted to him so that
suitable datum points may be established and checked by the Engineer to enable the Contractor to
proceed with his works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire hazards
to the extent practicable. Combustible materials, combustible waste and rubbish shall be collected and
removed from the Site at least once each day. Fuels, oils and volatile or inflammable materials shall be
stored away from the Transmission and equipment and materials storage areas.
Enough of such trained personnel must be available at the Site during the entire period of the Contract.
17.0 SECURITY
The Contractor shall have total responsibility for all equipment and materials in his custody/stores,
loose, semi-assembled and/or erected by him at Site. The Contractor shall make suitable security
arrangements ensure the protection of all materials, equipment and works from theft, fire, pilferage and
any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the Contractor shall be
carried out in presence of contractor and is deemed considered as part of the work completion. If it is
anticipated that the above test may prolong for a long time, the Contractor’s workmen required for the
above test shall always be present at Site during such tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of
any damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor
shall submit to the Engineer every week a report detailing all the receipts during the week. However, the
Contractor shall be solely responsible for any shortages or damages in transit, handling and / or in
storage and erection of the equipment at Site. Any demurrage, wharf age and other such charges
claimed by the transporters, railways etc, shall be to the account of the Contractor. For shortages of any
materials issued by the GETCO for the work, recovery shall be made from you, on the basis of prices of
the materials (prevailing on the date of settlement of materials account) plus 15% supervision charges
plus GST as applicable.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of
the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment stored
shall be properly protected to prevent damage either to the equipment or to the floor where they are
stored. The equipment from the store shall be moved to the actual location at the appropriate time so as
to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried by heating
before they are installed and energized. Motor bearings, slip ring, commutators and other exposed parts
shall be protected against moisture ingress and corrosion during storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation resistance at
least once in three months from the date of receipt till the date of commissioning and a record of such
measured insulation values maintained by the Contractor. Such records shall be opened for inspection
by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected
and stored in a suitable manner to prevent damage or deterioration in quality by storage.
19.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof and
flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for him, the
Engineer will have the right to get it moved to the area earmarked for the Contractor at the Contractor’s
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment,
which require indoor storage. Normally, all the electrical equipment such as motors, control gears,
generators, exciters and consumables like electrodes, lubricants etc. shall be stored in the closed
storage space. The Engineer, in addition, may direct the Contractor to move certain other materials,
which in his opinion will require indoor storage, to indoor storage areas, which the Contractor shall
strictly comply with.
20.0 TRANSMISSION MANAGEMENT
20.1 The field activities of the Contractors working at Site, will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and other
Contractors and the tradesmen of the Owner regarding scheduling and coordination of work. Such
decision by the Engineer shall not be a cause for extra compensation or extension of time for the
Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be designated
by the Engineer. The Contractor shall attend such meetings and take notes of discussions during the
meeting and the decision of the Engineer and shall strictly adhere to those decisions in performing his
works. In addition to the above weekly meeting, the Engineer may call for other meetings either with
called, will also attend such meetings.
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his
works in accordance with the specified Transmission schedule. If at any time, the Contractor is falling
behind the schedule, he shall take necessary action to make good for such delays by increasing his
work force or by working overtime or otherwise accelerate the progress of the work to comply with the
schedule and shall communicate such actions in writing to the Engineer, satisfying that his action will
compensate for the delay. The Contractor shall not be allowed any extra compensation for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or
supply or any other services to the Contractor except for the coordination work between various
Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished and
erected under the Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including Transmission
equipment, tools and tackles for the purpose of the works under intimation to the Engineer. All such
goods shall, from the time of their being brought vest in the Owner, but may be used for the purpose of
the works only and shall not on any account be removed or taken away by the Contractor without the
written permission of the Engineer. The Contractor shall nevertheless be solely liable and responsible
for any loss or destruction thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or owing
to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen (15)
days’ notice in writing of his intention to do so, the Owner shall be at liberty to sell and dispose off any
such goods, in such manner as he shall think fit and to apply the proceeds in or towards the satisfaction
of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of the
Engineer the materials such as Transmission equipment, erection tools and tackles, scaffolding etc. with
the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and
the employees of other Contractors and Sub-Contractors and all public and private property.
24 INSURANCE
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and
Conditions of Contract of this Volume-I, the following provisions will also apply to the portion of works to
be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less
Workmen’s Compensation : As per statutory Provisions
Employee’s Liability : As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease or
death of members of public or damage to property of others, due to any act of omission on the part of
the Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots, strikes
and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it will be the responsibility
of the Contractors to maintain all necessary insurance coverage to the extent both in time and amount
to take care of all his liabilities either direct or indirect, in pursuance of the Contract.
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable Transmission conditions. No field activities shall be
performed by the Contractor under conditions, which might adversely affect the quality and efficiency
thereof, unless special precautions or measures are taken by the Contractor in a proper and satisfactory
manner in the performance of such Works and with the concurrence of the Engineer. Such unfavorable
Transmission conditions will in no way relieve the Contractor of his responsibility to perform the Works
as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or elsewhere, are
properly protected and handed over to the Engineer. Similarly, the Contractor shall ensure that the
bench marks, reference points, etc which are marked either with the help of Engineer or by the Engineer
shall not be disturbed in any way during the performance of his Works. If any work is to be performed
which disturbs such reference the same shall be done only after these are transferred to other suitable
locations under the direction of the Engineer. The Contractor shall provide all necessary materials and
assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment belonging
to him or to GETCO or to others, working at the Site. The Contractor shall also be responsible for
provision of all safety notices and safety equipment required both by the relevant legislations and the
Engineer, as he may deem necessary.
27.4 All equipment used in Transmission and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with
manufacturer’s Operation Manual and safety instructions and as per Guidelines/rules of GETCO in this
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the Contractor and will be promptly produced as and when desired by the
Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the Site including
safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be erected under
the control and supervision of an experienced and competent person. For erection, good and standard
quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless expressly
permitted in writing by GETCO to handle such fuses, wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other
Contractor or Owner, he shall:
(a) Satisfy the Engineer that the appliance is in good working condition;
(b) Inform the Engineer of the maximum current rating, voltage and phases of the appliances:
(c) Obtain permission of the Engineer detailing the sockets to which the appliances may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be an
earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No weight of
any description will be imposed on any cable and no ladder or similar equipment will rest against or
attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared safe by the
Engineer and a permit to work shall be issued by the Engineer before any repair work is carried out by
the Contractor. While working on electric lines/equipment, whether live or dead, suitable type and
sufficient quantity of tools will have to he provided by the Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the Transmission/ erection or other associated activities undertaken by
the Contractor thereby causing any minor or major or fatal injury to his employees due to any reason,
whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the Engineer
in prescribed form and also to all the authorities envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property, and/or equipment. In such cases, the Contractor shall be informed in writing about the
nature of hazards and possible injury/accident and he shall comply to remove shortcomings promptly.
The Contractor after stopping the specific work can, if felt necessary, appeal against the order of
stoppage of work to the Engineer within 3 days of such stoppage of work and decision of the Engineer
in this respect shall be conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety
reasons as provided in para 27.15 above and the period of such stoppage of work will not be taken as
an extension of time for completion of work and will not be the ground for waiver of levy of liquidated
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements of Safety
Rules which would generally include but not limited to following: -
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so as to
enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper introduction as
to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire prone
areas and adequate firefighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first aid to
the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers, use of gum
boots for working in slushy or in inundated conditions are essential requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO Safety Rules referred above, the latter shall be binding on the
Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident: Rs 1, 00,000/-These are applicable Causing death per person plus GST for
b. Major injuries or accident causing :Rs. 20,000/-Injury to any person.
25% or more permanent disablement per person plus GST, whosoever to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules
framed there under or any other applicable laws as applicable from time to time. In case the Owner is
made to pay such compensation then the Contractor is liable to reimburse the Owner such amount in
addition to the compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall
be in accordance with the relevant Codes and accepted good engineering practice, the Engineer’s
drawings and other applicable Indian recognized codes and laws and regulation of the Government of
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC) and
Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this contract and
are, in general, supplementary to related provisions under ITB, GCC and ECC. However, in certain
provisions which are contrary to those in ITB, GCC and ECC, the provisions in these Special Conditions
of Contract will prevail.
2.0 Tender Fee:
The tender fee specified in notice inviting tender is payable by online mode only.
3.0 Earnest Money Deposit (EMD):
For EMD amount upto Rs 3 lakh no any physical document required. It should be only by
RTGS/NEFT/ Onine mode only.
The estimated cost for this Tender along with EMD is mentioned on tender notice. MSME registered vendor not
allowed for EMD exemption. EMD is compulsory.
3.2 Payment by Cheque/Cooperative Bank Guarantee/ Company Guarantee is not permissible.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the
Bid invalid.
5.0 Qualifying Criteria:
5.1 TECHNICAL CRITERIA:
Experience as per qualifying requirement given above.
5.2 FINANCIAL CRITERIA:
As mentioned in QR.
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC, the following
documents/details are to be furnished by the Bidder:
As Mentioned in QR
7.0 Price Inclusions (including Taxes & Duties):
7.1 The prices quoted shall be all inclusive of freight, octroi, transportation, loading, unloading & stacking at
site of equipment materials received from Transmission store GETCO Bharuch after observing all store
formalities of GETCO.
7.2 No extra payment toward any type of templates and erection tools /materials will be made.
7.3 GOOD & SERVICE TAX (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services within the original contractual delivery period. The amount and% of GST
and Cess as applicable should clearly be indicated separately. (GST/Cess means all applicable
Tax/Cess under GST Laws. GST Laws means IGST Act, GST (Compensation to the State for Loss of
Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017and all related ancillary legislations).
You shall have to submit a C.A Certificate duly authorized Signatory of successful bidder, certifying that you
have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not claim any
such Refund, on a future date, from the concerned Authorities and if, any Refund, in respect of such
GST and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without
COMPANY making any specific Claim, for the same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess is
not mentioned clearly unless the bidder has opted for Composition Scheme under GST Act, which
should be clearly indicated in the price bid. COMPANY may at its discretion consider such offer with
presumption of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of
GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly specified
with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of the Supplier
from Composition scheme during the tenure of the contract, the rate mentioned in the price bid shall be
final and any additional GST will have to be borne by the tenderer. In no case additional amount
towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation
clause will not be applicable in case of Supplier / Contractor has opted for Composition Scheme under
i. Contractor has to submit the GST Registration certificate.
ii. Contractor has to submit invoice/Challan as documentary proof with each RA bill & Final Bill and in
which it shall be specifically mention the nature of service &code SAC code under which the amount of
service tax GST payable by contractor and payable by GETCO (if any) without fail.
iii. GETCO will withheld the GST amount of contractor and it shall be reimbursed on production of
documents evidences of payment made by contractor
iv. The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of taxable service provided
The total GST payable thereon with bifurcation of GST payable by service provider and service
Rate and amount of taxes i.e. CGST/ SGST/ IGST/UGST
Place of supply along with the name of State, in case of a supply in the course of inter-State trade
or commerce i.e. Out of Gujarat Supply
Applicable SAC Code
Contractor has to also supply tax invoice as described under GST rules and Regulation
indicating GSTIN
v. Contractor has to provide Tax invoice in a standard format as per CGST act, CGST rules 2017 and GST
invoicing rules containing all details as provided in Act and rules. Contractor / Supplier has to mention
GST no. of GETCO i.e. 24AABCG4029R2ZC in the invoice invariably & failure of which payment will
not be made.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of GST
(later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and
above as charged in the invoice shall be borne by the Supplier/Contractor. However, any refund
received by the supplier / contractor on account of GST charged from the company; such refund shall
have to be passed on to the company, along with interest if any. Such refund along with interest needs
to be passed on suo-moto by the supplier / contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the rate of 15%
per annum if GST charged is not paid / short paid to the government or fail to upload the details or
uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for
each item of Goods/Service. If not specifically mentioned, then COMPANY will have the option to take
the prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of the
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder intends to supply the
goods /services, meaning thereby the bidder has to supply the goods / services from the relevant
declared / registered place of supply only
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under
the GST Act, subsequent to the date of submission of the offer, the same should be passed on to
COMPANY and you should inform such changes to COMPANY from time to time.
TDS UNDER GST:
Tax deduction at Source (TDS) under GST at the prevailing rate will be deducted from bills in accordance
with the provision of Section 51 of the CGST Act, 2017 and to that effect a certificate will be issued to
the party.
Goods and Service Tax Compliances (GST):
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work executed
will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations and
notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC codes
respectively.
GETCO reserve right of re-classify, in case of mis-classification of goods and/or service (HSN/SAC
codes) Sec. 171 of CGST/SGST Act contains provisions related to anti-profiteering. On the basis of
same on introduction of GST, the Vendor should pass on the tax benefit/savings, if any, on account
of tax credits or lowering of tax rates to us by way of adjustment in the contract price.Non-
compliance of the same may lead to levy of penalty by Government.
Contractor required to submit the invoice as per the standard formats/contents of GST laws
including invoice ruling. GST will be reimbursed subject to proper/ valid matching of
transactions/invoices on GSTN (GST network).
The contractor is abiding by the all rules and regulations of corporation and amendments, which
may publish subsequently for compliance by field offices with respect to GST Laws.
7.4 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in
the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers offer
if it takes place within the original contractual delivery date will be to COMPANY’s account subject to the
claim being supported by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the advantage will have to be
passed on to COMPANY. Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
7.5 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision of
Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.6 Welfare Cess
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects and
civil works.
Contractor shall get registered under Welfare Cess Act before commencement of work. Office of the
Factory Inspector is authorized at present as a registering authority.
The welfare cess@1% is considered in the price schedules so, the bidders are requested to quote
accordingly.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary
evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then contractors
shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of
utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to the
contractor on receipt of request letter along with documentary evidence of payment. For calculation of
welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value.
In case of EPC contracts covering supply, erection, testing & commissioning, the supply portion shall also
be considered for calculation of welfare cess.
If GETCO purchases material on its own without any reference to the estimate contract and gives/hand
over the material to the contractor for erection, testing & commissioning, then welfare cess on
procurement cost of the equipment of material shall also be applicable. Procedure same as narrated
Periodically, the evidence regarding filing of return and maintaining record as per the Act by the
contractor shall be verified by GETCO.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit the
documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill, the contractor has to submit documentary evidence of payment of
welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to submit
documentary evidence of registration under Welfare Cess Act and evidence of payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence
of payment by observing due formalities.
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of LOI.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as a
Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable by
Bank guarantees from following Banks will be acceptable.
8.3 If the Contractor defaults in execution of the orders placed or if COMPANY suffers any financial loss due to
this, then COMPANY will be forfeited Security Deposit, EMD plus GST as applicable from other orders
of the same firm or by encasing the Bank Guarantee
(A) Guarantees issued by the following Banks will be accepted as SD/EMD on permanent basis.
1. All Nationalized Banks
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to March- 31,
or the issuance of new Government Resolution on the same subject whichever is earlier. The
validity cut-off date in GR is with respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
1. Axis Bank
2. AU Small finance bank
3. Bandhan bank
4. City union bank
5. CSB bank
6. DBS Bank Indiia limited
7. DCB Bank
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
11. HDFC Bank
12. HSBC Bank
13. ICICI Bank
14. IDBI bank
15. IDFC First bank
16. Indusland Bank
17. Jammu & Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka bank
20. Karur Vysya bank
21. Kotak Mahindra Bank
22. RBL Bank
23. South Indian Bank
24. Standard Charterd Bank
25. Tamilnadu Mercantile Bank
26. Ujjivan small finance bank
27. Yes Bank
28. Ahmedabad Mercantile Co-Op. Bank
29. Nutan Nagrik sahkari Bank ltd.
30. Rajkot Nagrik sahkari Bank ltd.
31. Saraswat Co-operartive bank
32. SBPP Co op bank
33. SVC Co-operative Bank Ltd.
34. The Cosmo Co op Bank
35. The Gujarat State co-operative bank
36. Surat District Co-op bank
37 Surat people’s Co-op. bank
38. Baroda Central Co-Operative Bank
39. Panchmahal Dist Co-Op Bank
40. Kalupur commercial Bank
41. Rajkot commercial Co-op Bank
42. Banaskatha Mercantile Co-Op Bank
43. Gujarat Gramin bank
8.4 No interest will be allowed on amount of Security deposit.
8.5 The Security Deposit- total shall be kept deposited up to completion of work finalization of final bill. The
same shall be return on receipt of N.O.C. by the concerned DE after observing GETCO’s procedure.
8.6 This security deposit is for the performance of contract and the same is liable to be forfeited by the
GETCO in event of non-fulfillment of the term and conditions of this contract by the contractor.
8.7 Corporate Guarantees are not admissible.
8.8 The ‘Signing of Contract ‘ and ‘ Contract Agreements’ will be done as per prevalent GETCO Terms and
Conditions.
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor workmanship
etc. for a period of one year from the date of commissioning.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in supply and erection beyond Contractual cutoff date stated
as per stipulated delivery period shall be subject to the penalty at the rate of ½ % per week on delayed
work amount subject to a maximum of 10% of the contract prices.
10.2 The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee
or any other amount payable under any other contract with the GETCO.
10.3 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete work,
GETCO will get the remaining work executed at the risk & cost of contractor.
11.0 COMPLETION PERIOD
11.1 Overall period for this Contract will be 90 days from the date of commencement.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.3 The completion date will be deemed to be the date on which all works on the Contract are demonstrated
to be complete to the satisfaction of the GETCO/Engineer and is complete in all respects as per the
terms and conditions of this Contract.
12.0 Presentation of Bills for s/s work
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed including cost of
material consumed is to be prepared in triplicate and submitted to Site Engineers in-charge of the work,
for necessary payment. These bills shall be serially numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and passing of final
bill. The contractor has to submit the final bill along with the material consumption statement and other
required data of the work carried out within 3 months from the date of completion of work. These bills
shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following information:
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the respective
RA bill shall be withheld and shall only be released at the time of final bill.
12.A Presentation of Bills for line work
12.A.1 Bills for 90% value of the erection work carried out during each calendar month as per above
Clause shall be submitted in triplicate to Deputy Engineer (Const), In charge of the works at the end
of that particular month, who will in turn process the same and forward to Executive Engineer
(Const), In charge of the works, for necessary payment. These bills shall be serially numbered with
Suffix-E-1.
12.A.2 Bills for 10% value of the erection work done as per above clause shall be submitted to Deputy
Engineer (Const), in charge of the works, who will in turn process them and forward them to
Executive Engineer (Const). I/C of the work for necessary payment. These bills shall be serially
numbered with Suffix-E-2.
12.A.3 The Contractor has to submit the final bill along with all required data of works carried out within
months from the date of commissioning of the line. The concern Dy.Engr /Ex.Engr (Const.) must
record and process the final bill along with complete material account. The material account shall
include the credit of dismantled materials.
12.A.4 All the bills (in accordance with above Clauses) must be submitted with following information’s:
a. Item wise work done during billing period i.e., respective month.
b. Item wise cumulative work done.
c. Account for tower materials & bolts-nuts, accessories consumed and balance stock.
d. Account of line materials consumed, wastages and balance stock.
For non-submission OR part submission of above information an additional 5% amount of the
respective RA. Bill will be withheld and released only after passing of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work in scope of work
13.1 For erection works of s/s.
(i) 90% payment of amount claimed covering various activity such as structure, equipment
erection, earthing installation, control wiring, battery charging etc. works against R.A. bills duly
certified by EIC within 60 days from the date of R.A. bill.
(ii) Balance 10% of erection value shall be paid against completion of work only after settlement of
material account statement of items used, erected and successful commissioning of
transmission line the same amount will be release in final bill only and payment will be made
only after passing of final bill.
13.A For erection works of line
13.A.1 Payment shall be made as under:
Up to 90% of the total value of the erection work done will be paid against monthly running account
bills to be submitted to the Engineer-in-Charge of the Construction Division concerned.
Balance 10% payment due will be made at the end of 12 months from the date of handing over of
the line or 18 months after completion of the line to the satisfaction of the Superintending Engineer
(Trans), Bharuch at his absolute discretion whichever is earlier only after passing of final bill.
13.A.2 The payment of above balance 10% amount due will be made only after a material account
statement of items received and used or returned to stores is settled and passing of final bill. The
contractor must settle final bill within 3 Months from the completion date. Any discrepancy in the
quantities will have to be made good by the contractor or deduction of its cost as per The GETCO's
ledger value or market value whichever is higher, plus 15% supervision charges will be made while
settling the balance payment. This value of materials shall be prevailing on the date of submission
of the final material account to the GETCO.
13.2 PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link https://getco.co.in/msme/
(and intimate to concern bill submitting office with copy to this office).
(2) The payment will be made within 45 days from the *date of acceptance or the **date of as deemed
acceptance of goods or services i.e After submission of all required documents as per at terms &
time to time circular issued by GETCO’s corporate office as well as statutory requirement to process
*Date of acceptance means-
(a) The day of actual delivery of goods or the rendering services or
(b) Where any objection is made in writing by the buyer regarding acceptance of goods Or services, the day
on which such objection is removed by the supplier.
** Date of deemed acceptance” means-
where no objection is made in writing by the buyer regarding acceptance of goods or services within
fifteen days to the delivery of the goods or the rendering of
services, the day of the actual delivery of goods or the rendering or services.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Transmission store of S/S equipment and materials and keep
in safe custody and transport to the respective sites and will be fully responsible for any damage to or
loss of all materials at any stage during transportation or erection or taking over of the S/S by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his own
14.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi assembled
and/or erected by him at site in his custody. The Contractor shall make suitable security arrangements
at his own cost to ensure the protection of all materials, equipment and works from theft, fire pilferage
and any other damages and loss. It shall be the responsibility of the contractor to arrange for security till
the works are finally taken over by the GETCO.
14.4 STORAGE-CUM-ERECTION INSURANCE: The contractor shall take suitable storage-cum-erection
insurance cover at his cost to the extent of 100 % cost of S/S materials, which are required to complete
the work. Bidder shall have to take the comprehensive Marine cum erection (MCE) insurance policy
against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the work by GETCO. However, if the work is not
completed within the stipulated time limit as mentioned into work order, the MCE shall be
extended by the contractor up to the work completion and taking over of the line or S/S by
GETCO. Moreover, the charge for extension of insurance shall be borne by contractor if the
delay is attributed to the contractor. The charge for extension of insurance shall be reimbursed
by GETCO to the contractor on production of proof for extension of MCE if the delay is attributed
on the part of GETCO
The Contractor shall deal directly and pursue the claim with the Insurance Company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The
proof of insurance policy taken by the successful Contractor shall be furnished/submitted to Engineer-In-
Charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. Bill payment will be withheld.
The approximate amount of the material required whose insurance is to be taken to complete the scope of
work is Rs. …to be reflect in Work order copy
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge,
pursue and settle all the claims with the Insurance Company for all items, materials and the GETCO
shall be kept informed about it. Contractor shall replace the lost / damaged materials / items promptly
irrespective of the settlement of the claims by underwriter and ensure that the work progress is as per
agreed schedule. The loss, if any, such replacement will have to be borne by the Contractor and
GETCO will not entertain any claim / representation in this regard. However, it will be contractor's
responsibility to insure the entire project till the S/S is taken over by the GETCO.
15.0 LABOUR LAWS:
15.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labour license under the contract Labour (Regulation and abolition) Act
for employing necessary manpower required by him. In the absence of such license, the contract shall
be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the GETCO indemnified
in respect thereof. Some of the major liabilities under various labour and industrial laws which the
Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or other
Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/- or later prevailing
rate with the Office of Commissioner of Labour as per the Contract Labour (Regulation and
Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed
under the various labour laws, in force from time to time, from Statutory Authorities like State
Government/ Government o India, which the Contractor shall have to comply with.
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee.
Provident Fund and Family pension Scheme at the rate of 18% (or at the rate made applicable by the
Government from time to time of the wages. The Contractor’s contribution and his worker’s contribution
towards Provident Fund and Family Pension Scheme shall be deposited by the Contractor with
Regional Provident Fund Commissioner, Ahmedabad.
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the
Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident
Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour, shall be
provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for individual
labourer, which shall be duly verified, approved and certified by the authorized Officer of the GETCO.
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the liability
insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pendency of the contract.
15.6 The contractor shall employ adequate number of experienced skilled at site for daily supervision and for
maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
15.7 CONTRACTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO
also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever, arising out of or in connection with the matters referred herein above elsewhere
and against all actions, proceedings, claims, demands, costs and expenses which may be made against
the GETCO or Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for or in respect of
performance of his obligation under the contract documents. The GETCO shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and keep
indemnified the GETCO against all claims, demands, proceedings, cost, charges and expenses
whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be covered
under the Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed
under the minimum wages act. The wages of every Contract Labour employed by him under
this contract shall also be paid by him before the expiry of 7th day of the last day of the month in
respect of the wages are payable (i.e. wages of a month have to be paid by him in the first week
of the next month). Any default will result in cancellation of contract forthwith or else the
contractor shall be punishable to the extent of Rs. 100/- per each day or as per the prevailing
rules of labour laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of
labour trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his
office outside the factory work premises and the Contractor shall arrange to have his office
outside the factory work premises and the Contractor shall keep himself present throughout the
working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within contractual period
of delivery or in case the stores are found not in accordance with prescribed specification and/or the
approved sample, the GETCO shall exercise its discretionary power either:
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and at the risk of
the contractor for such stores not so delivered or other similar description without canceling the
contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the GETCO shall be
final. In the event of action taken under clause (A) or (B) above, the contractor shall be liable to pay
for any loss which the GETCO may sustain on that account, but the contractor shall not be entitled
to have any saving on such purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any
time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has to reduce
all the quoted rates proportionately. The reduction on overall basis will not be accepted (i.e. all unit
rates of erection schedule shall be reduced proportionately by difference in percentage). The
confirmation for matching end cost shall be given within 7 (seven) days from the letter from GETCO.
16.0 VENDOR REGISTRATION:
REGISTRATION AS A CONTRACTOR:
Registration with GETCO is pre requisite for participating in tender. It is required to furnish
documents of registration along with offer in Technical bid and the details at appropriate place in
confirmation of details of bidder shall be given by the contractor
17.0 Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business
dealing/blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from
participating in the tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tenderer / Consultant / Vendor / Contractor.
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
blacklisting, is to protect the GUVNL and its subsidiary Companies from dealing with
undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business dealing /
blacklist are as Under.
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid,
until and unless it is sought for,
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.4. Has refused to accept letter of Acceptance / purchase Order / Work Order after the same is
issued by the Company within the validity period and as per agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled
1.2.7. Has failed to submit all the necessary tests reports / documents within time schedule/ as per
company’s time limit, as mentioned in the LOI, if the letter of Acceptance (LOA) is placed
subject to submission of type reports / documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with stipulated time
frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not returned or has
short returned or has unauthorisely disposed of materials / documents / drawings / tools or
plants or equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of
documents, in relation the tender / Contract.
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the tendering authority
/ purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the Company given
to the firm only for its use (in discharge of its obligation against an order) to any third party
without prior consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to Deal with the
1.2.16. In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / banned for business dealing /
blacklisting.
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and / or
proprietor / partner / Director of the firm has not been placed on stop dealing / banned for
business dealing / blacklisting by GUVNL and It’s any subsidiary Companies as per Revised
ANNEXURE-14
18.0 CERTIFICATE
Sub.: Work of erection of 66kV equipment structures Control wiring yard lighting control-room electrification
& Supply & lnstallation of furniture and Supply and lnstallation of CCTV Camera etc at 66kV Jambusar
Drug Park Substation.
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender No. TCBRH/26-27/E-2625
For Work of erection of above line under construction Division Bharuch complete with all the tender
Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till completion of
the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation. Further, I /
we also agree that additional conditions / deviations, if any found in bid, the offer shall be out rightly
rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
STATUS: ______________________
Name of BIDDER
19. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if there is
complaint against his misbehavior, misconduct or disloyalty towards job.
20. Terms and conditions regarding industrial laws and other related matters shall be complied by the contractor
in all respect.
21. The contractor shall ensure that all persons have provided safety tools, shoes, hamlets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO from
time to time in concern with the safety and security as the work to be carried out.
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information & should place on top of technical bid specifying
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD/Speed post. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by Yes / No
the Bidder.
5) a) Whether the Bidder is registered with GETCO Yes / No
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. & date.
ii) Class of Registration
Iii) Validity
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No
8) GST [IN PERCENTAGE] Yes/ No
Please quote your GST Registration No. & Date.
9) PENALTY TERMS AGREE Yes/ No
10) SECURITY TERMS AGREE Yes/ No
11) PAYMENT TERMS AGREE Yes/ No
12) Completion Period Agreed Yes/ No
13) TELEPHONE NOS. & FAX NO. & e-mail ID
14) AUTHORISED PERSON OF THE FIRM:
15) NAME OF THE PROPRIETOR, PARTNERS, DIRECTORS
[AS THE CASE MAY BE], ALONG WITH ADDRESS, TELEPHONE, FAX NO. etc.
Signature of Authorized Representative of
Company/Agency
STATUS:________________
Name of tendering company
PART – II
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
3.1 SCOPE:
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipments and other material from the Board’s stores, checking them,
transporting to site's stores and keeping in safe custody by contractor.
ii) To take suitable storage-cum-erection insurance of equipments/materials issued by the
iii) Distribution of all materials to erection site at 66kv Sub Station.
iv) Structure/Equipment erection including fixing of attachments, accessories and tack-welding
of structures.,
v) Stringing of ACSR/AAAC Panther conductor bus with fixing of insulators, Hardware,
dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete the transformer
for commissioning.
3.1.3 The Board will supply equipments, structure materials, bolts-nuts, structure accessories/attachments,
insulators, insulator-hard wares, conductor, accessories, ground wire, ground wire accessories,
Control cable etc. required for erection of equipments and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest
Provisions under Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required during execution of work.
The Contractor solely is responsible for any damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till the complete
transformer is taken over by the Board, and thereafter up till guarantee period.
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who shall exercise his
own judgment with regards to actual handling of equipments & materials and in deciding upon the best
methods to be adopted for all the erection activities.
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural drawings, and
other erection drawings etc. provided by the Board.
3.2 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The bidders are
presumed to have acquainted themselves with the site before submitting their offer.
3.2.2 The successful bidder has to collect from concerned field office the detailed layout drawing along with
the following drawings for the substation duly approved by the Board immediately on receipt of the
Order. He shall also arrange visit of proposed site jointly with Board’s representative for important
marks coming across the scope of works under the contract. Structural drawings of 66 KV Structures
listed at Schedule –B
TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully comply with the
relevant Indian Standard. The IE rules and Acts in force from time to time shall also be applicable
during pendancy of the contract.
3.4. ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles, jigs and fixtures, winches, alignment tools, welding
sets, , breaker handling devices, all consumable items and Transmission equipment as required to
install the equipments and to complete the work in all respects and shall necessarily include (but not
limited to ) bolts, nuts, rivets, welding rods, shims, wedges, packing sheets, packing compounds, oil
installation and protection of individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of and connection of
cables, fabrication supply and installation of all support structures for installation of various electrical
equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables) shall also be
arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
3.4.6 All additional iron framework erected to put the equipment in operational condition shall be provided
with two coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against entry of rates, lizard,
and creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the following
activities have been completed.
3.5.2 Moving of all equipments to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments etc. as
described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.18.0. EARTHING ARRANGEMENTS: (TECHNICAL TERMS & CONDITIONS)
Standard Guidelines & Recommendations for Earthing System for EHV Sub-station issued
vide Circular R & M/3 dtd.5.11.12 & CE(TR) Circular 36 dtd. 23.9.08 to be followed.
The General notes for Earthing system & drawings for earthing the equipments (including
welding joints) are compiled in Drg. No. GETCO/E/STD/P-012 sheet 1 to 24 (available in SOR
3.19 GENERAL :
3.19.1 The Contractor shall ensure that at the end of each sub-activity the Surplus materials are immediately
removed from the work-site and the surplus excavated earth is spreader around to avoid loss or injury
to the public/equipments.
3.19.2 The Contractor has to return all surplus materials after reconciliation of material account in good and
useable condition. The contractor shall settle the final bill including signature on all relevant papers
required for passing of final bill, excess/saving statement and time limit extension proposal. If any
within three months from the date of charging/commissioning or taking over by the Board of the Sub
3.19.3. Most of all equipments should be erected in presence of the concerned engineer from OEM/GETCO
After complete erection and operation, contractor's supervisor should attend the site whenever called
3.19.4. from GETCO for further testing commissioning of equipments/panels etc.
3.20 Erection:
1. All erection work is to be carried out as per the manual of OEM (Original equipment manufacturer)
and instruction of engineer-in-charge.
2. All equipment erection charges are inclusive of shifting dragging handling of the respective
equipment up to S/s erection site from its S/s site store.
3. Contractor has to ensure safe shifting dragging erection of all equipments to comply with labour
laws I.E. rules etc.
4. All erection charges are inclusive of fixing of clamp connectors, all necessary accessories to the
respective equipment.
5. Transformer erection charges cover shifting dragging, handling etc. for its bushings radiators
conservator tank and allied accessories.
6. All erection work includes erection insurance to be arranged by the contractor at his cost.
7. All the required tools and tackles like conductor, earth wire compression, jointing machine, cutting
machine, welding set etc, are to be arranged by the contractor at his cost.
8. For electrical lighting work prevailing SOR of Electrical work of R&B of GOG is to be followed.
3.21 Dismantling:
3.21.1 To ensure safety & Technical parameters in safe guard during dismantling, in person of concerned
Engineer in charge. Also to stack the materials at safe place in proper stacking manner .
Signature of Contractor Superintending-Engineer
GETCO, CO, Bharuch
4.21 GENERAL:
4.21.1 The Contractor shall ensure that at the end of each sub-activity the surplus materials are
immediately removed from the work-site to avoid loss and injury to the public.
4.21.2 The Contractor has to return all surplus materials after reconciliation of material account in good
and useable condition and settle final bill including signature in all relevant papers required for
passing of final bill within three month from the date of charging / commissioning of line.
4.21.3 The contractor has to return empty Conductor / Earth wire Drums if it is Steel Drum. For wooden
Drums, contractor has not to return the empty Conductor/Earth wire Drums for the conductor/ E.W
used for this line.
4.21.4 If contractor does not complete the work in specified time with GETCO’s specification or leave the
site with incomplete work, GETCO will get the remaining work executed at the risk and cost of
contractor.
4.21.5 If at any time, before the security deposit is refunded to the contractor, it shall appear to the Executive
Engineer or his subordinate in charge of the work that any work has been executed with unsound,
imperfect or unskillful workmanship or with materials of inferior quality or that any materials or
articles provided by him for the execution of the work are unsound or of an inferior quality to that
contracted for or are otherwise not in accordance with the contract, it shall be lawful for Engineer-in-
charge to intimate this fact in writing to the contractor and then no withstanding the fact that the
work, materials or articles complained of, may have been inadvertently passed, certified and paid
for, the contractor shall be bound forthwith to rectify or remove and reconstruct the work so
specified in whole or any part, as the case may require or if so required shall remove the materials
or articles so specified and provided other suitable materials or articles at his own charge and cost,
and in the event of his failing to do so within a period to be specified by the Engineer-in-charge in
the written intimation aforesaid the contractor shall be liable to pay compensation at the rate of one
percent on the amount of the estimate for every day, not exceeding ten days during which the
failure so continue and in the event of any such failure as aforesaid the Engineer-in-charge may
rectify or remove and re-execute the work or remove and replace the materials or articles
complained of, as the case may be, at the risk and expense in all respects of contractor should the
Engineer-in-charge consider that any such inferior work or materials as described above may be
accepted, or made use of, it shall be within his discretion to accept the same as such reduced rates
as he may fix thereof. Provided that in the case of any work of which visible check is not possible, if
the Engineer-in - charge or his subordinate in charge of the work feels that such work has been
executed with unsound, imperfect or unskillful workmanship or with materials of inferior quality, he
shall take sample tests at random, cost of which shall have to be borne by the contractor and if after
taking such test, part of such work is found to be defective in any respect or to have been executed
with materials of inferior quality, then the contractor shall be paid for the whole work such amount as
may be fixed by the office of the Engineer-in-charge on the basis of the lowest quality of work found
by him in such samples tests.
4.21.6 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete
work, GETCO will get the remaining work executed at the risk & cost of contractor.
4.22 PROGRESS REPORT:
4.22.1 Daily progress report in duplicate shall be regularly submitted to the Executive Engineer (Const.),
with a copy to Supdt. Engineer (Trans). The Contractor shall also maintain register as per Schedule
of Section E-IV.
4.23 SITE VISIT:
4.23.1 The Engineer-in-Charge of the works or his representative will be free to visit the contractor's works,
their site stores and erection site and also verify the purchaser’s materials in the custody of the
contractor, as and when required.
4.24 WARRANTY:
4.24.1 The erection work will be covered under warranty period against any defect arising from erection
workmanship for a period of 18 months from the date of completion of line or 12 months from the
date of handing over of the line to the satisfaction of Superintending Engineer (Trans), at his sole
discretion, whichever is earlier.
4.25 QUANTITIES:
4.25.1 Quantities given in the Schedule-B are to be executed by the contractor at the rate accepted by the
GETCO in the A/T. In case of any deviation/tower quantity /type of tower/ length of line, excavation/
concreting resulting in an increase in which event the field officer shall obtain prior approval of the
competent authority of GETCO and excess quantity shall be paid only at accepted rate of the A/T.
Design / drawings for any other item to be executed, if required shall be prepared and submitted to
the GETCO for approval by the successful contractor at no extra cost to the GETCO and in time to
avoid delay in completion period. Payment for such Items executed shall be made on the basis of
quantities of approved designs and rates accepted in the A/T.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor / agency shall be penalized as
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus GST as applicable
2 Above 1 Lac to 10 Lacs Rs.40000/- plus GST as applicable
3 10 to 100 Lacs Rs.100,000/- plus GST as applicable
4 > 100 Lacs 1.0 % plus GST as applicable
Reporting:
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of fatal/Non-
fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site in
charge and supervisor. Safety document shall be handed over and vital safety norms and key points of
safety related to project shall be explained and recorded for commitment by erection contractor.
Such records are mandatory for clearing first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the following checks during
execution of work shall be covered.
3.21 Safety equipments available and utilize.
(a) Helmet.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.22 Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(a) P.P.rope.
(b) Wire rope and sling.
(c) Earthing rod
3.24 If above-mentioned safety requirements found violated in any of the above three conditions shall
attract penalty of Rs.1000/- plus GST per occasion. (Max.Rs.3000/--for violation of three
conditions) During subsequent visit, if violation is found, then double penalty plus GST shall be
deducted from the bill of the Contractor/Agency.
Signature of Contractor Superintending Engineer (TR)
Safety Instruction for Contractors:
Following safety guidelines are mandatory for all contractors operating in GETCO premises /on transmission
lines for Electrical, non-electrical & civil works.
1. The contractors must provide advance planning of work to concerned in-charge of substation in writing.
2. The list of workers/ lab ours with name and address must be given to S/s In charge prior to
commencement of work by the contractor.
4. The list of T&P and safety equipment (PPE) having tested and checked by GETCO officials at site.
5. The working procedure must be specified with timings of working hours indicating tea break & lunch
break period.
6. Before starting any work whether switch yard, on line or in colony “permit to allow to work” must be
taken from control room in-charge.
7. Utilizing Electrical/non- electrical equipments, safety rules must be implemented.
8. All workers /labour & supervisors must use safety equipments (PPE) during the work.
9. If the work is to be carried out on Sunday or public holiday the necessary permission must be taken in
advance, requesting in writing.
10. Unwanted person including children of labours will not be allowed at working site/ in the switchyard and
in the prohibited area.
11. Any electrical work or electrical connections to equipment for any other work must be carried out by
certified electrician/wiremen with adequate size of wire through MCB per I.E. Rule. Ensure that all
precautions are taken to prevent electrical accident & the installation /connection is certified by Engineer
in-charge.
12. No work should be done during night hours unless & until it is required under certain circumstances with
the approval next higher authority and all necessary arrangement of adequate lighting with safety
precautions is made.
13. Joint checking of line by In-charge, contractor & supervisor prior to commencement of work of any
electrical/non-electrical work.
14. Any power line crossing, river crossing & railway crossing or any other hazards must be discussed with
workers by contractor in presence of Engineer in-charge.
15. Contractors must submit list of workers with name, qualification and experience who are engaged for
line maintenance/rectification job.
16. Line clear permit must be taken on power line crossing or passing nearby for safety of workers. This
must be ensured by GETCO supervisor/in-charge of substation before starting the work.
17. Contractors must arrange for Shelter and drinking water facility for the labours /workers engaged with
the permission of S/s in charge.
18. The method of work, required T&P and manpower should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders.
19. Prior to execution of work a joint survey must be conducted by GETCO supervisor, contractor’s
supervisor and DISCOM line man in order to identity the following.
20. The contractor has to deploy minimum 8 to 10 skill labours/ fitters at site daily failing to which GETCO
shall deduct 1,000/- plus GST as applicable per day from the bill.
21. If the contractor fails to complete the job in stipulated time period, GETCO will get the remaining work
executed at the risk & cost of contractor.
22. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if
there is complaint against his misbehavior, misconduct or disloyalty towards job.
23. Terms and conditions regarding industrial laws and other related matters shall be complied by the
contractor in all respect.
24. The contractor shall ensure that all persons have provided safety tools, shoes, halmets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO
from time to time in concern with the safety and security as the work to be carried out.
25. If the Contractor defaults in execution of the orders placed or if COMPANY suffers any financial loss due
to this, then COMPANY will be forfeited Security Deposit, EMD plus GST as applicable from other
orders of the same firm or by encasing the Bank Guarantee.
26. If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete work,
GETCO will get the remaining work executed at the risk & cost of contractor.
SCHEDULE –A
MATERIALS:-
Following material will be supplied by GETCO “free of cost” for Work of erection of 66kV equipment
structures Control wiring yard lighting control-room electrification & Supply & lnstallation of furniture
and Supply and lnstallation of CCTV Camera etc at 66kV Jambusar Drug Park Substation 1) G I
Structures, accessories, attachments, bolts-nuts etc.
2) Conductor, conductor accessories, earth wire, earth wire accessories.
3) Insulators, insulator hardwares, G I strip size 75 x 10 mm & 50 x6 mm /MS round bars size 20/25/32/40
mm dia. Except vertical 3.0 mtr long electrodes 66 KV /11KV/LT equipments with accessories and control
and relay panels.
4) 110 Volt, 100 AH DC battery sets and battery chargers.
5) Various sizes of armored control cables and LT control cables.
6) PLCC equipment’s and PLCC panels.
Following materials / equipment’s will be procured / arranged by the contractor activities for 66 KV& above class
sub stations.
1) Tools tackles required for erection activities. And stringing.
2) Earthing materials, CI frame & cover, cement, sand, gravel, bricks, bolts-nuts with washers, number
plates, painted plates etc. Vertical 3.0 mtr long electrodes
3) Maintenance free earth electrodes & back fill compound
4) Filter machine, hydraulic crane and hydraulic jointing machine/welding machines.
STORE CENTRES
SUB-Station Equipment/Material will be issued from following Store Centres:
Sr. Store Centers for issue of S/s+line
No. materials/equipments.
Work of erection of 66kV equipment structures Control
wiring yard lighting control-room electrification & Supply &
1 lnstallation of furniture and Supply and lnstallation of Bharuch/Haldarva
CCTV Camera etc at 66kV Jambusar Drug Park
Substation
Note: Generally, all required materials will be issued form above store centre’s of GETCO. In case of non-
availability of some items, contractor shall have to collect from other nearby store centers without extra cost
to the Board.
APPENDICES
Gujarat Energy Transmission Corporation Ltd.
APPENDIX –I
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom reference can be
made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr Description Value Constructi Actual Date Client Persons Principal
No of Work Of Work Construction Of to Features
Executed Period Completion whom
Rs. for the Reference
Completion may be
of the work made
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place:
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – II
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers shall
submit the information in the Format detailed here under]
No location
Tender Cost of Anticipated Estimated Date Stipulated
Cost Remaining Date of Cost Date or
decision period
work Completion
Expected Completion
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company Date & place: _______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-III
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
Experience
No. &Details
& details of
of position
works carried
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: ______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-IV
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Details Capacity Numbers Make Remarks
No. machinery
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: _______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-V
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding in
representative of firm company.
who has visited the site.
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE
[Tenderers shall submit in the Format detailed here under]
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: _______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – VI
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
Class – with valid up to
1 Registration
3 Partnership deed/Proprietor (Notarized copy)
4 Power of Attorney (Notarized copy)
Bl. Sheet / P&L A/C, Statement of last three
Rs. Lacs issued by Bank, branch
6 Latest Solvency certificate.
7 GST Registration No.
Signature of Tenderer Company’s Round Seal
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – VII
Qualification Requirement.Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening of
the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may be],
along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
SECTION – E IV
PART – B
SCHEDULE –
FINANCIAL CAPABILITY
Sr. No. Details Amount Rs. In lacs Remarks
1. Solvency A scheduled Banker’s Certificate of
present solvency be attached.
2. Annual turnover for last five
3. Price of the biggest job
carried out.
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
SECTION – E IV
PART – B
SCHEDULE -
LATEST INCOME – TAX CLEARANCE CERTIFICATE
SECTION – E IV
PART – B
SCHEDULE –
(BANK GUARANTEE ON NON JUDICIAL STAMP PAPER OF Rs. 300/-)
BANK GUARANTEE
FOR TENDER NO: _________________________________ B.G. No. ______________________ issued on
dated: ____________
WHEREAS Messers _________________________________ (Names and address of the firm) having their
registered office at _____________________________________
_______________________________________________________ (address of firm’s registered office)
(hereinafter called the “Tenderer”) wish to participate in the Tender No.
_________________________________ (Supply / Erection / Supply and Erection / work) of
_______________________________________________________________ (Name of the material /
equipment / work) _________________________ for Gujarat Energy Transmission Corporation Ltd (hereinafter
called the “Beneficiary”) and
WHEREAS a Bank Guarantee for Rs. ______________________ (Amount of E.M.D.) valid till
___________________________________________________ (mention here date of validity of this guarantee
which will be 3 months beyond initial validity of Tenderer’s offer).
We, _______________________________________________________ (name of the Bank and address of the
Branch giving the Bank Guarantee), having our registered office at
________________________________________________ (address of Bank’s registered office) _________
hereby give this Bank Guarantee No. ________________ dated _________________ and hereby agree
unequivocal and unconditionally to pay immediately on demand in writing from the Gujarat Energy Transmission
Corporation Ltd or any officer authorized by it in this behalf any amount not exceeding Rs.
___________________ (amount of E.M.D.) (Rupees _____________________________________________ )
to the said Gujarat Energy Transmission Corporation Ltd on behalf of the Tenderer.
We ___________________ (Name of the Bank) ____________________ also agree that withdrawal of the
tender or part thereof by the tenderer within its validity of non-submission of Security deposit by the Tenderer
within one month from the date tender or a part thereof has been accepted by the Gujarat Energy Transmission
Corporation Ltd would constitute a default on the part of the tenderer and that this Bank Guarantee is liable to
be Invoked and encashed within its validity by the beneficiary in case of any occurrence of a default on the part
of the Tenderer and that the encashed amount is liable to be forfeited by the beneficiary.
This agreement shall be valid and binding on this Bank upto and inclusive of
_______________________________ (mention here the date of validity of Bank Guarantee) and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of Tenderer or by any reason
whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations
or alterations made, given, conceded with or without our acknowledge or consent by or between the Tenderer
and the Gujarat Energy Transmission Corporation Ltd.
NOTWITHSTANDING anything contrary contained in any law for time being in force or banking practice, this
guarantee shall not be assignable, transferrable by the beneficiary (i.e. GETCO). Notice or invocation by any
person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation
of the guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to Rs.
___________________________ (amount of E.M.D.) (Rupees
______________________________________________________ (in words).
Our guarantee shall remain in force till ________________________________________ (date of validity of the
guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before
________ (date should be one month after the above validity period of BG), all rights of Beneficiary under the
Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under.
Complete postal address of the Signature of Bank’s
Bank with Branch code, Authorized Signatory with
Telephone and Fax Nos. Official Round seal
Note: The banks shall be the Banks recognized/notified by the Finance Department, Government
of Gujarat(GOG) from time to time.
SECTION – E IV
PART – B
SCHEDULE –
DETAILS OF PARTNERS / DIRECTORS WITH THEIR ADDRESS
Name of bidder: _______________________________________________________
Designation Name Residence (address) Working Place
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
SECTION – E IV
PART – B
SCHEDULE –
MEMORANDOM / ARTICLE OF ASSOCIATION
CONSTITUTION OF FIRM WITH THE NAMES OF PARTNERS / DIRECTORS.
(TO BE SUBMITTED SEPARATELY WITH THE OFFER DULY SEALED AND SIGNED)
SECTION – E IV
PART – B
SCHEDULE –
ATTESTED COPY OF RESOLUTION OF THE PARTNERS / THE GETCO / AUTHORITY ACCEPTABLE BY
LAW OF THE FIRM AUTHORISING A PARTICULAR PERSON TO SIGN TENDER AND RELATED
DOCUMENTS ON BEHALF OF THE COMPANY.
(TO BE SUBMITTED SEPARATELY WITH THE OFFER DULY SEALED AND SIGNED)
SECTION – E IV
PART – C
SCHEDULE –
PROFORMA FOR AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
CONTRACT AGREEMENT
THIS AGREEMENT is made at BHARUCH the_____________ day of ___________ in the Christian Year two
thousand ___________ between M/s. _____________________________________ (address of office)
________________ (hereinafter referred to as “THECONTRACTOR” which expression shall unless excluded
by or repugnant to the context include its successors or permitted assigns) of the ONE PART and the Gujarat
Energy Transmission Corporation Ltd, having their Head office at Race Course, Baroda 390 007 (hereinafter
called “The GETCO” which expression shall unless excluded by or repugnant to the context include its
successors or assigns) of the SECOND PART.
WHEREAS the aforesaid The GETCO has accepted the tender of the aforesaid contractor for work of
_________________________________________________________________________________ as per
The GETCO’s Order No. ______________________________________ _______________ hereinafter called
“the works” and more particularly described and enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule of price which for the
purpose of identification have been signed by Shri ____________________________________ (authorized
signatory) on behalf of the contractors and by the Supt. Engineer (Trans), Gujarat Energy Transmission
Corporation Ltd, Vidyut Bhavan, Race Course, Baroda on behalf of the GETCO, a list whereof is made out in the
Schedule hereunder written and all of which said documents are deemed to form part of this contract and
included in the expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
AND WHEREAS the GETCO has accepted the tender of contractors for the work of
sum of Rs. ___________________ Rupees (_______________
____________________________________________) upon the terms and subject to the conditions herein
mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
The contractors shall do and perform all works and things in this contract mentioned and described or which are
implied therein or therefrom respectively or are reasonably necessary for the completion of the works as
mentioned and at the times, in the manner and subject to the terms and conditions and stipulations contained in
this contract, and in consideration of the due provision, executions, erection and completion of the works agreed
to by the contractor as aforesaid the GETCO doth hereby covenant with the contractor to pay all the sums of
moneys as and when they become due and payable to the contractors under the provisions of the contract.
Such payment to be made at such times and in such manner as is provided by the contract.
The conditions and covenants stipulated here-in-before in this contract are subject to and without prejudice to the
rights of the GETCO to enforce penalty for delays and / or any other rights whatsoever including the right to
reject and cancel on default or breach by the contractor of the conditions and the covenants as stipulated in the
general conditions, specifications, forms or tender schedule etc. attached with The GETCO’s Order No.
The contract value, extent of works, completion dates, specifications and other relevant matters may be altered
by mutual agreement and if so altered shall not be deemed or construed to mean or apply to affect or alter other
terms and conditions of the contract and the general conditions and the contract so altered or revised shall be
and shall always be deemed to have been subject to and without prejudice to said stipulation.
List of documents forming part of the contract:
The GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated ____/____/2020
The GETCO’s contract booklet – “Tender & Contract of Works”.
The GETCO’s order No. Dtd. _____ / ______/
Contractor’s acceptance of order vide letter No. _______________.
Contractor’s Partnership Deed dtd. ________________.
Contractor’s Power of Attorney / The GETCO Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties hereto have set their hands and seals this day and month, year first above
Signed, sealed and delivered by
For and behalf of M/s. __________________ (Signature)
Address: _____________________________
In the presence of (Name and Address)
i) __________________________________ (Signature)
ii) __________________________________ (Signature)
Signed, sealed and delivered by for and on
behalf of Gujarat Energy Transmission Corporation Ltd
Sardar Patel Vidyut Bhavan, Race Course,
BARODA - 390
In the presence of name and address:
NOTE: 1) Copies of all documents forming part of the contract and listed in schedule (from tender
invitation to A/T and party’s acceptance letter thereof) be sealed and signed by the authorized
signatory of the firm be submitted with the agreement.
2)Attested copy of resolution of the Partners / The GETCO / Power of Attorney acceptable by law
authorizing particular person to sign on behalf of firm be invariably enclosed along with
submission of Agreement.
SECTION – E IV
PART – C
SCHEDULE –
BANK’s UNDERTAKING
(Non Judicial Stamp Paper of Rs. 300/-)
BANK GUARANTEE NO: ___________________________
We (Name of issuing bank, branch & address) hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat Energy Transmission Corporation Ltd or any Office
authorized by it in this behalf, any amount upto and not exceeding Rs. __________________
(Rupees _________________________________________) to the said Gujarat Energy Transmission
Corporation Ltd on behalf of M/s. __________________ (name of The GETCO’s contractor) ______________
who have entered into a contract for the supply/works specified below:
This Agreement shall be valid and binding on this Bank upto and inclusive of ____________ (Date
______________ ) ______________ and shall not be terminable by notice or by change in the constitution of
the Bank or the Firm of contractors/Suppliers or by any other reasons whatsoever and our liability here under
shall not be impaired or discharged by any extension of time or variations or alterations made, given, conceded
or agreed with or without our knowledge or consent, by or between parties to the said within written contract.
NOTWITHSTANDING anything contained herein before our liability under this Guarantee shall be restricted to
Rs. ____________________ (Rupees __________________________ ________________________ only(in
words).The Guarantee shall remain in force until _______________ (Date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before ________ (date should be
one month after the above validity period of BG), all rights of Beneficiary under the Bank Guarantee shall be
forfeited and we shall be released and discharged from all liabilities there under.
Round seal and Signatures of
two Authorized Bank Officers
along with their code numbers
SECTION – E IV
PART – C
SCHEDULE –
INDEMNITY BOND
(Non Judicial Stamp Paper of Rs. 300/-)
INDEMINITY BOND
KNOW ALL MEN BY THESE PRESENTS that we, Messers
________________________________________________________________________ (hereinafter called
“the Contractor” which expression shall, where the context so admits, include their heirs, executors,
administrators and legal representatives, successors and permitted assigns) are hereby held and firmly bind
unto the Gujarat Energy Transmission Corporation Ltd (hereinafter called “the GETCO” which expression shall,
where the context so admits, include its successors and assigns) to refund the full amount of steel cement and
other materials supplied by the GETCO under the terms and conditions of A/T No. _________________
________________________________________ dated ________________ against any loss damage or
deterioration of whatsoever nature occurs to said materials supplied by the GETCO and which are in the
custody of the contractor at their works site, on behalf of the GETCO, at ____________ (name of line)
_______________ and / or if any of the said materials, when inspected by any officer authorized by the GETCO
in this behalf, is found to be damaged, lost, deteriorated in quality or quantity, the contractor hereby agrees to
bind himself to indemnity and at all times keep indemnified the GETCO against all loss, damage and
deterioration to the cement, steel or any material supplied by the GETCO during his custody and shall pay in
cash on demand from the GETCO within 30 days the market value of such materials which is lost, damaged or
deteriorated in full to the GETCO and shall also hereby authorize the GETCO to deduct the said sum from any
sum due to the contractor or any sum which may at any time become due to the contractor under the above
referred contract or any other contract entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and
preservation of the said materials against all risks, excluding war risks and against loss, damage and
deterioration of whatsoever nature in respect of the said materials while it remains in the custody and
possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized by the
Now the conditions of the above written bond are such that the contractor shall pay the full amount forthwith to
the GETCO in the event of loss, damage or deterioration or whatsoever except due to circumstances arising out
of war in respect of the materials supplied by the GETCO and shall fully and effectually indemnify and keep
indemnified to the GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorized by the
GETCO and produce at any time when demanded.
THE WITNESS WHERE OF: We the Said M/S ________________________
(Signature of contractor)
(Seal of Firm)
hereto signed at ___________________
this day _________________________
In the presence of
address ______________ (Signature)
address ______________ (Signature)
SECTION – E IV
PART – C
SCHEDULE –
PROGRESS REPORT
Details of progress achieved during I / II fortnight to Month _________________
A/T No. & Date ____________________________________________________
Name of Substation _____________________________________________________
Sr. Erection Unit Total Work done Work done Total work Balance Remark
No. Activity Work up to last during done up to work to
Involved fortnight fortnight this report be done
Details of work done quantities:
Details of work done (activity wise, location wise):
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering
SECTION – E IV
PART – C
SCHEDULE -
MATERIAL ACCOUNT
(STATEMENT TO BE ATTACHED WITH MONTHLY RUNNING ACCOUNT BILLS)
1) Statement giving item wise details of monthly receipt of line material from GETCO and consumption for
erection of Substation for the Month of _____________________.
2) A/T No. & Date: __________________________________________________.
3) Name of Line: ____________________________________________________
Sr. Items Prov. Receipt of Material from Consumption of Material Actual Balance quantity
No. Requ- GETCO in Line wastage of material in
irmen stock
Qty. Qty. Qty. Qty. Qty. Qty.
rcvd. rcvd. rcvd. utilise utilised utilised
Upto This Till d this till this
last month this upto month month
month month last
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering Company
SECTION - E IV
SCHEDULE –
(TO BE SUBMITTED ON THE LETTER HEAD OF THE FIRM)
Reference No. Date:
The Superintending Engineer (TR),
Gujarat Energy Transmission Corporation Ltd.,
TRANSMISSION CIRCLE,
P. O. Maktampur,
BHARUCH-392
Ref: A/T/LOI No. __________________________________________________________________________
We hereby acknowledge, agree and accept your A/T under reference above with the terms and
conditions mentioned therein.
Signature of Authorized Representative
Company / Agency
DESIGNATION: _______________
Note: To be signed by authorized person on behalf of the Firm.
SECTION – E IV
PART – C
SCHEDULE –
BANK GUARANTEE EXTENSION FORMAT
(To be executed on non-judicial stamp paper of Rs. 50/-)
(Name and address of the Bank issuing the Bank Guarantee extension.)
EXTENSION OF BANK GUARANTEE NO. ______________ Dated. _____________ of Rs.
The validity period of our subject Bank Guarantee issued in your favor on behalf of M/s.
__________________________________________________ is hereby extended upto
Notwithstanding anything mentioned herein before, our liability under this guarantee is restricted to an amount
not exceeding Rs. ___________________ (Rupees ___________________________________
________________only) and it will remain in force till ____________ (validity date) _____________.
All other terms and conditions mentioned in the original Bank Guarantee will remain unaltered. This extension
forms an integral part of the above quoted original Bank Guarantee and may be kept thereto.
Signature of authorized
Authority of Bank
Seal of Bank
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED.,
SCHEDULE –
INTEGRITY PACT
OUR ENDEAVOUR
To create environment where Business Confidence is built through Best Business Practices and is fostered in
an atmosphere of trust and respect between providers of goods and services and their users for the ultimate
benefit of society and the nation.
GETCO COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical standards in Not to bring pressure/recommendations outside
business and professional. GETCO to influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat, inducement or Pressure
Satisfaction of stakeholders. of any kind on GETCO or any of its employees under
any circumstances.
To ensure to fulfill the terms of agreement / To be prompt and reasonable in fulfilling the contract,
contract and to consider objectively the agreement, legal obligations.
viewpoint of parties.
To ensure regular and timely release of To provide goods and / or services timely as per
payment on due dates for work done. agreed quality and specifications at minimum cost of
To ensure that no improper demand is made To abide by the general discipline to be maintained in
by employees or by anyone on our behalf. out dealings.
To give maximum possible assistance to all To be true and honest in furnishing information
the vendors / supplier / Service provider and including payment to agents / sub-agent.
other to enable them to complete the contract
To provide all information to suppliers / Not to divulge any information, business details
contractors relating to contract / job which available during the course of business relationship to
facilitate him to complete the contract / job others without the written consent of GETCO.
successfully in time.
To ensure minimum hurdles to vendors / Not to enter into carter / syndicate / understanding
suppliers / contractors in complete of whether formal / non-formal so as to influence the
agreement / contract / work order. price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Name: Name:
Designation: Designation:
SCHEDULE –
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, _______ by this SAFETY CUM INDEMNITY BOND
on this _____________ Day of _________ 2019. I/We Having Registered Office________________
_______________________________(herein after called “THE CONTRACTOR” which expression shall mean
and includes my /our heirs, executors, administrators and legal representatives, successors and permitted
assigns) do hereby binds myself/ourselves and also our company/firms after having the power to bind by this
promise and undertaking in favor of the Gujarat Energy Transmission Corporation Limited (GETCO), Vadodara
a State Transmission Utility under The Electricity Act, 2003 having its registered office at Sardar Patel Vidyut
Bhavan, Race course, Vadodara.( hereinafter called as GETCO, which expression shall mean and include its
legal representative, administrators assigns) has agreed under the terms and conditions of the contract
no.______ dated_______made between __________ and ___________for the contract of the
____________value of Rs. __________ interalia on production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to the extent
of Rs.______ Rupees________only against any losses or damages, costs, charges and expenses caused to or
suffered by reason of the CONTRACTOR while Project, R&M, O&M work including work carried out by
outsourcing agency, failing to take proper care or not complying the guidelines given hereunder as per
Annexure-A and instructions which may be given from time to time during the continuance of the contract and
we further undertake to unconditionally pay the amount claimed by the GETCO on demand and without demur
to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order no.____________,
dated________ for__________ issued by the GETCO after having observing necessary formalities, the details
of which is described in the order no.______ dated ______ and whereas the said job/works will be /likely to be
done in places covered under Employees’ State Insurance Act, 1948 (ESI) and /or the Workmen Compensation
Act, 1923 and /or other laws relating to the Labor Management and Welfare Act. (Respective Amendments) And
whereas according to the condition of the Contract the CONTRACTOR is under obligation to execute this Safety
cum Indemnity Bond before the commencement of actual execution of work. Now the indenture witnesses that
I/We the CONTRACTOR do hereby undertake to follow the guidelines as per Annexure-A prepared by the
GETCO. Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there
has been any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss,
damages, costs, charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged because of the
change in the constitution of the GETCO or for the extension of the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a) That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO from all claims,
actions, proceedings and risk, damage danger to any person whether belonging or not belonging to the
CONTRACTOR.
b) That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages any
proceedings in respect of any of its employee / workmen under the Workmen Compensation Act or any other
laws for the time being in force.
c) That, if during the course of execution of work as stated in the contract order mentioned
hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with guidelines as
per Annexure-A or terms and conditions / formalities within the meaning of Employees’ State Insurance
Act,1948 (ESI) or Workmen Compensation Act 1923 or any other laws
relating to the Labor Welfare for the time being in force, and also has not observed the safety norms in
accordance with the law prevailing at the place of work/job to the satisfaction of the GETCO, the GETCO shall
have the right to stop the execution of work/job and the period of such stoppage shall not be taken into account
for the calculation of the total period of completion of work for which the CONTRACTOR is responsible to
complete the work/job and it will be deemed that discontinuance was due to default of the CONTRACTOR .
d) That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any such
compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other reason, the
GETCO shall have the right to recover the said amount from any amount receivable by GETCO or any bank
guarantee deposited or anything payable whether in connection with this contract or other contract by the
CONTRACTOR to the OBLIGEE.
e) That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any
guidelines as per Annexure- ‘A’ and terms and conditions mentioned in this Safety cum Indemnity Bond,
GETCO shall have right to terminate the contract of work issued to the CONTRACTOR.
f) In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the compensation and
liability as per statutory requirement, contractor / agency is hereby agreed to pay the penalty amount as given
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus GST as applicable
2 Above 1 Lac to 10 Lac Rs.40000/- plus GST as applicable
3 10 to 100 Lac Rs.100,000/- plus GST as applicable
4 > 100 Lac 1.0 % of contract value plus GST as applicable
g) I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of claims under
this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is performed or as per GETCO
norms shall have the jurisdiction to decide the rights & liabilities of the parties while adjudicating the matter of
claims under this Safety Cum Indemnity Bond.
h) This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in Writing on
the CONTRACTOR’s application after the Contractor has discharged all his obligations under the order
mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said order.
The Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i) This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in addition to and
not by way of limitation or substitution for any other guarantee, indemnities Here to before given to the GETCO
by the CONTRACTOR and this indemnity do not Revoke or limit such indemnities or guarantees. IN
WITNESSWHEREOF the Parties hereto have executed this indenture the day the year First hereinabove
(Signature with seal of The CONTRACTOR)
In the presence of: -(1). (2).
ANNEXURE-A
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered in
an atmosphere of trust and respect between providers of goods and services and their users for the ultimate
benefit of society as the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution of
works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are identified.
Indoor safety precaution Outdoor safety Indoor safety precaution Outdoor safety
precaution precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO supervisor, should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders. contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment. supervisor and DISCOM line man in order to identify
the following:
Clearly identify the work location, to distinguish
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
Disconnect equipment from supply. b. Isolation point of each line crossing.
Protect against other live parts. c. Each line crossing & isolation point under each
span must be discussed and noted in
Take special precautions when close to bare
conductors / Bus bar. maintenance register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor must
contractors operating in GETCO premises for ensure all isolations physically with adequate earthing
Electrical, non-electrical & civil works. technically prior to give clearance to gang leader for
taking up job.
1. The contractors must provide advance planning of
work to concerned in-charge of substation in writing. While execution of stringing work, the identified line
crossing must be isolated / de-energized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned
“permit to allow to work” must be taken from control DISCOM supervisor.
room in-charge.
The isolation of Tap line must be physically seen and
3. Utilizing Electrical / non-electrical equipments, safety verified by Contractor and GETCO supervisor.
rules must be implemented.
At D.O. fuse junction contractor’s person should be
4. If the work is to be carried out on Sunday or public posted to ensure that no person restore D.O. supply
holiday, the necessary permission must be taken in while work is under execution Contractor’s supervisor
advance, requesting in writing. must ensure that concern officer take LCP for EHV
line and power line crossing.
5. Unwanted person including children of labors will not
be allowed at working site/ in the switchyard and in the
prohibited area.
6. Any electrical work or electrical connections to
equipment for any other work must be carried out by
certified electrician/wiremen with adequate size of wire
through MCB as per I.E. Rule.
o Live penal area / bus bar must be isolated and
sealed / bifurcated with red color tape for visible
O Display Board must hang on LCP panel.
o Transformer must be switched off whenever and
wherever contractor and line workers are not satisfied
with isolation, earthing or any equipment performance
of GETCO, it will be pointed out and work shall begin
only after resolution. Contractor shall not take up job in
absence of GETCO authorized person.
All wire temporary connection & material never
erection activity has any connection and disconnection
work of busbar, string bus.
All workers / labor of contractor & supervisors must All workers/labour of contractor & supervisors must
use personal protective equipment (PPE) during the use personal protective equipment (PPE) during the
work like gloves, safety belt, Safety shoes, Helmet, work like gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by GETCO. earthing rods, Live line detector etc, duly approved by
The local earthing must be done at the place of work The local earthing must be done at the place of work
before execution of any work. before execution of any work.
11 kV breakers in panel must be switched off and Circuit breaker opening is not isolation and isolator on
racked out only after ensuring no voltage in breaker either side must be opened. No work during rains and
and without door opening. cloudy weather condition.
Transmission line activities.
1) Used of Voltage detector to ensure outage.
2) Earthing at three points, local, left & right side of
bus bar / string bus.
3) Match line color code with color of wrist band.
Local earthing of electrical equipments like filter M/c,
welding machine, testing kits etc. is must.
Crane shall only be used for material handling and
erection. Working platform shall only be used for work
in switchyard.
Revised ANNEXURE-14
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING/BLACK LIST
Sub: Undertaking in regard to stop Deal/Banned for Business dealing/Black list thereof.
Ref: Tender No.: TCBRH/26-27/E-2625
All Bidders will have to furnish the following undertaking duly filled in, signed and stamped for each quoted item
of the Tender along with the Technical Bid.
I/We authorized signatory of M/s
hereby certify that M/s
and their proprietor/any partner/and directors of the firm is
not stop deal and/or banned for Business dealing and/or black listed by GUVNL and/or their any subsidiary
company viz. GSECL/ GETCO / DGVCL / MGVCL / UGVCL / PGVCL.
Seal of the firm Signature of the Tenderer
GUJARAT ENERGY TANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE, GETCO-BHARUCH
TENDER SPECIFICATION FOR
(NOTE: Price Bid should not be submitted in Hard copy)
Work of erection of 66kV equipment structures
Control wiring yard lighting control-room
electrification & Supply & lnstallation of furniture
and Supply and lnstallation of CCTV Camera etc at
66kV Jambusar Drug Park Substation
PRICE SCHEDULE
TENDER NO: TCBRH/26-27/E-2625
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Electrification & Supply & Installation of furniture and Supply and Installation of CCTV Camera etc at 66kV Jambusar
Drug Park S/S
SCHEDULE B-1: EQUIPMENT ERECTION & BUS BAR STRINGING
Sr. Total
Description of work/Supply Unit Rate Amount
Erection of equipments of any type / make with required all
spares & accessories as per supplier's manual and FQP,
including individual & interpole wiring of for all mentioned
voltage class switchyard (as per respective technical
1 specification & relevant Special Conditions) Suitable for all 4 5821.00
types of bus configurations. Scope includes the
dragging/loading/unloading of same from site store to
erection site.
Erection of Breakers - 66 KV without Crane.
Erection of CT & PT CVT on erected structure including
complete dragging/ loading/ unloading of same with crane
only from site store to erection site and fixing of required Per
clamps, connectors as per instructions of Engineer-In- Phase
66 KV CT/PT (without Crane permitted)
Erection of surge arrestor with counter on Erected
structure including complete dragging/loading/ unloading of
the same with crane only from site store to erection site and Per
fixing of required clamps, connectors as per inst. of Phase
Engineer-In-Charge.
Erection of Centre Break/Double Breake Isolator (All
make) with earth blade on its erected structure consisting
of 3 base channels with porcelain/solid core insulator
including interconnected piping with operating mechanism Set of
4 and accessories with final adjustment for simultaneous 3 2 3638.00
operating & closing. The rates are inclusive of dragging / Phase
loading / unloading of the same from site store to erection
site as per instruction of Engineer-In-Charge.
- - DO - - as above but without earth blade complete. Set of
Erection of 66KV Poly cone/Solid Core/Bus Post Insulator
on its erected structure complete, fixing of accessories and
6 shifting of same including loading/ unloading from its site 12 291.00
store to erection site.
Laying of any size of 11/22 KV XLPE/PILC cable
including excavation of trench 300mm wide & 600mm
deep in any type of soil including laying and filling up sand
of 100mm layer from bottom & bricks on three side of cable
& refilling the trench with Murram/soil & ramming etc.
Required bricks, sand, power cable marker/C.I./G.I. plate
etc. will have to be supplied by the contractor. Rates are
inclusive of shifting of cable drum to the site from S/S site
store. Drum should be handled only by jacking to avoid
damage to cables.
Laying of any size of 11/22 KV XLPE/PILC cable in ready
made cable trench or in open space. Rates are inclusive
8 of shifting of cable drum to the site from S/S site store. Mtr 700 67.00
Drum should be handled only by jacking to avoid damage
to cables.
Erection S/S & Equipment structure including punching
of nut bolts. Rates are inclusive shifting of same up to
erection site from its s/s Store.
Erection of 66/22-11KV, class Power Transformer with
complete mounting of all the accessories i.e. bushings,
radiators, conservator tank etc. including laying of cable
between all accessories/mounted on the transformer/
marshalling KIOSK filling and filtration of oil with filter
machine as per direction of Engineer-In-
Charge,manufacturer Engineer or as per instruction
10 manual. Required filter machine,Hydralic Jack, Vacuum
pump etc. for erection & oil filtration will be provided
by contractor.
i) 05 MVA No 0
ii) 10 MVA No 0
iii) 15 MVA No 0 26192.00
iv) 20 MVA No 2 33395.00
Stringing of Single ACSR Zebra Bus complete in all
respect with fixing of all fitting, insulators sag compensating
spring and all accessories as per the instruction of
Engineer-In-Charge.
Preparing and fixing of required length of jumpers of
single Zebra/Panther/ Dog in the switchyard on
respective Bus & equipments, tensioning, Compressing &
dressing of jumpers complete as per instruction of E.I.C.
Installation of earthing strips/MS Round bar in any kind of
soil except Rocky (HR/SR) soil as per earthing philosophy
of GETCO Earthing Grid:
1)including digging of 600mm depth and 450mm wide
2)Cutting,bending,laying and fixing of Earthing Grid
conductor.
3)75*10 mm/50*6 mm GI Strips: Fixing of two bolt at each
straight joints and lap welding removing oxide films formed
during welding applying two coats of red oxide and black
powder after welding and applying zinc rich paint on welded
4)25/32/36/40MM dia MS rod:Lap welding at each stright &
cross joints removing oxide films formed during welding
applying two coats of red oxide and black powder after
welding and applying zinc rich paint on welded joints.
5)including supply of red oxide paint, black powder HDGI
nuts bolts as per specifications.
6)Back filling of the trech with yellow/Normal soil.
structure & Equipment earthing :
1)inclding digging of 600mm depth and 450mm wide
2)cutting,bending as per required shape,laying and fixing of
risers from Grid to structure and equipments.
3)Lap welding removing oxide films formed during
welding,applying two coats of red oxide and black powder
after welding and appting zinc rich paint on welded joints
including supply of HDGI nuts & boltts for all connections
including suppporting to structures etc as per specification
4) Back filling of he trench with yellow /Normal soil.
50x6mm G.I. Strips /MS round bay up to and including
Installation of earthing strips/MS Round bar in Rocky
(HR/SR) soil as per earthing philosophy of GETCO
Earthing Grid:
1)including digging of 600mm depth and 450mm wide
2)Cutting,bending,laying and fixing of Earthing Grid
conductor.
3)75*10 mm/50*6 mm GI Strips: Fixing of two bolt at each
straight joints and lap welding removing oxide films formed
during welding applying two coats of red oxide and black
powder after welding and applying zinc rich paint on welded
4)25/32/36/40MM dia MS rod:Lap welding at each stright &
cross joints removing oxide films formed during welding
applying two coats of red oxide and black powder after
welding and applying zinc rich paint on welded joints.
5)including supply of red oxide paint,black powder HDGI
nuts bolts as per specifications.
6)Back filling of the trech with yellow/Normal soil.
structure & Equipment earthing :
1)inclding digging of 600mm depth and 450mm wide
2)cutting,bending as per required shape,laying and fixing of
risers from Grid to structure and equipments.
3)Lap welding removing oxide films formed during
welding,applying two coats of red oxide and black powder
after welding and appting zinc rich paint on welded joints
including supply of HDGI nuts & boltts for all connections
including suppporting to structures etc as per specification.
4) Back filling of he trech with yellow /Normal soil.
50x6mm G.I. Strips /MS round bay up to and including
Providing bore for bore type earthing with drilling of
minimum 200 mm dia bore upto following mentioned depth
Rockey(HR/SR) soil as per earthing philosophy of GETCO
1)work inclding inserting 20/25mm dia MS rod (for 66kV
S/S)/40mm dia MS rod (for EHV S/S)in bore depth and to
be conneceted to be eathing grid at junction point by proper
welding at both end.
2)This includes cutting,fabrication & welding of flat.
15 3)Refiling and compression of surrounding areas with No 0 916.00
Normal/yellow soil ground enhancement material etc
wherever applicable as per approved soil strata and
earthing design calculation.
4)Required G.I. Earthing strp/MS rod will be supplied by
GETCO free of cost. 5)Earthing material like
Normal/yellow soil,ground enhancemen
materail(0.5CMT/meter depth),water etc shall be supplied
by contractor.
Installation of ground rod 20/32/40 mm dia bar in 5,3 mtr
16 Long vertical spike for mesh type earthing in Normal soil. No 48 167.00
Supply,installation,Testing & Commissioning of
maintainanace free treated earth electrods Suitable for
NORMAL SOIL as per drawing no. GETCO/E/P-021 (1 of
2) R3 dated:29-05-20and technical specification GETCO/E-
TS-Maintainanace Free earth pits/R1 dated 04.06.15 for
66/11 KV Sub-Stations with ground enhancement
17 material/back filling/ grounding compound as per IEEE 80- No 42 14611.00
2000 clauses 14.5 (d) and as per Part-7 of IEC-62561
using copper bonded earth electrode (with 250 micron
coppper coating) having 24 mm dia.(Min) and 3000 MM
length which shall be capable of handling STC of 25 KA-1
sec. Work also includes providing BB Masanory inspection
chamber (manhole) incl. light type CI cover.
...DO..as above for Rocky soil as per drg no. GETCO/E/P-
18 021 (2 of 2) R3 dated:29-05-20 No 0 15611.00
Fabrication for erection of any Equipment/Structure/panel L.S.
19 or anywhere in s/s & F.B. at other endas per Inst. Of E.I.C. 1 5250.00
Erection of support structure for 11 KV Power cable
termination at 11 KV Bushing for 15/20 MVA Power
Transformer as per GETCO Drawing No: GETCO/E/06S-
STD/11 KV STR- A2-02
1) Materail for supporting strucure will be supplied free cost
20 by GETCO. No 2 1050.00
2) Necessary wooden clamps as per drawing with required
nut-bolt-washers & HDPE rubber piece for packing etc shall
be supplied by contractor
3).Job also includes minor fabrication if required as per
instruction of EIC.
Erection of support structure for Station Transformer as
per GETCO Drawing No: GETCO/E/06S-STD/11 KV STR-
1)Necessary wooden clamps as per drawing with required
nut-bolt-washers & HDPE rubber piece for packing etc shall
21 be supplied by contractor. No 1 2310.00
2)Job also include erection of required 11 KV L.A. & D.O.
fuse and minor fabrication if required as per instruction of
3)Material for supporting structure ,DO fuse & 11 KV L.A.
will be provided by GETCO free of cost.
Providing & fixing on above support str. of Set of following
Items on 11KV support structure system for power
cable of 66/11KV Transformer as per GETCO drawing
GETCO/E/06s-STD/SPL-028A R3 dt 26.10.16 and
instructio of EIC
1) Allu. alloy bus bar of size 120X20x2000 mm : 03 Nos.
2) 11KV SRI of PCD 127 mm 12 No
22 3) Copper laminated fusion welded flexible jumper of size Set 2 28714.00
75 X 10 X 600 mm having 2000 Amp capacity : 03 No
4)Bi metalic plate(Al/Cu):3 No
5)11kv heat shrikale anti tracking sleeve on Al Bus bar of
all three phase 6 meter 6)Incuding required GI/SS nut bolt
and washer of good quality for fitting support structures.
7) All live parts shall be covered with heat shrinkable MV
insulated tape sleeve.
Erection of 11KV D.P. Structure GETCO Drawing No:
GETCO/E/06S-STD/11KV STR -A1-01 and GETCO/E/06S-
STD/11KV STR -A4-04
1)Job includes erection of 11kv A/B switchs ,11kv
LA,jumpering betwwen 11kV cable to 11kV Bus etc on
rected structure.
23 2)Materail for DP structure.AB switches,PI and conductor No 10 2259.00
for jumpers will be supplied free of cost by GETCO.
3)Necessary wooden clamps with required nut bolt washers
& HDPE rubber pieses fpor packing etc to hold 11kV power
cable as per drawing shall be supplied by the contractor.
4)Job also includes miNO r fabrication if required as per
instruction of EIC.
Stringing of Single ACSR Dog bus between 11KV D.P.
Structure to cross boundry structure in all respect
1)Job includes fixing of all fittings and accessories on
erected DP strucrures Set of
2)single tension hardware suitable for ACSR og cond 6 set 3 ph.
shall be supplied by the contractor.
3)Necessary ACSR DOG conductor,11kV insulator will be
suplied by GETCO free cost.
Providing of M15 Grade Concrete for various equipment
structure, Guy, 11kv DP, M.K. Box, Neutral channels, cable
support channel, grouting of Pole/ Flood light structure with
cement, sand & metal in proportion of 1:2:4 respectively.
1)work inculding muffing with smooth cement mortar (1:6)
2)Necessary sand,metal,water & cement shall be supplied
the contractor.
Excavation in Hard Rock for excavation of Earthing Pits/
26 power cable & control cable trenchs, Yard Light Poles etc. Cmt 0 552.00
Loading, Transporting & Unloading of all material for 66 KV
substation like Structure,indoor & out door SS Equipments,
27 DP Structure,earthing materials,battery set,fire Job 1 54393.00
wedge,GI/MS scrap,all other materail etc in Substation &
oposite end feeder bay from Store to SS Site
Supply & laying of 1 CoreX25mm2, armroured Copper
Cable, multi-strand flexible of approved make ISI marked in
28 ready made trench or PVC pipe from Battery Charger to Mtr 45 209.00
Battery Set including termination at both side as per inst. of
Providing and fixing of various type of sign Board, sticker,
Big Sign Board, earthing pit board, earthing pit Board &
Single line diagram etc as per instruction of IEC. Sticker of
red, white, black Letters are to be utilised for various sign
Earthing Pit Board Size:- 6" x 6" -30 Nos.
Safety Slogan Board, Hard Sheet board size 2' x 2'and
4mm thick (Gujarati Language)- 2 Nos.
Safety Slogan Board, Hard Sheet board size 3' x 2'and
4mm thick (Gujarati Language) with red and Yellow colour.-
Single line diagram size 5' x 3' Digital with Alluminium
frame with fitting and as per approved diagram given by
IEC.-01 No.
Big sign board size 5' x 4' and 2mm thickness indicating
sub station name digital with S.S. rod with hole & as per
approved symbol with fitting charge.- 01 No.
Switch yard sign Board 12" X 6" with 2 mm Thickness black
& white Gujarati language.-25 Nos.
Safety Slogen Board size 2" x 6" in side control room.-05
Various type of control room equipment sticker size-24 cms
x 5cms.--18 Nos.
Safety picture board size :- 3' x 3' (Laminated for O/D use)-
Name plate board of transformer size :- 2' x 1'- 04 Nos.
Cable marker size:- 6" x 6", Radium, fixed on 750mm long
M.S.Rod for fixing arrengement.- 30 Nos.
Providing and fixing of Radium sticker for out door and
Indoor equipments identification like LA, ISOlator, Circuit Sq.
breaker, transformer, CT,PT,MK box, C&R panels , 11KV Inch
panel board etc.
Providing and Fixing of Fire stand from 75mm Gl pipe A
class ISI mark heavy duty having 5ft width and 4ft height as
per inst of Engr. In charge
1) Work includes cutting,drilling,welding of pipe as required.
Fabrication and supply of 16mm dia meter hook required
size for buckets .
2) 4 Nos.of fire buckets are to be provided.
31 3) Fire stand should grouted with excavation of pit size Job 1 5250.00
300mm*300mm-2 nos of 600mm depth with 1:3:6 mis
muffing 300mm in height including quality as per instruction
4) Fire stand is to be painted with post box red colour of
approval quality as per instruction of EIC.
5) All required approved material including
cement,sand,metal etc are to be provided by contractor.
Providing, Fabrication and erection of VHF set entena
support pipe on control room by providing 25mm dia. GI
32 pipe of length 20 feet.including providing & fixing of 4 nos. Job 1 1575.00
of guy from GI wire 10 SWG. This job includes painting of
GI pipe by good quality paint white and red alterlatively
Labour charge for fixing of 11KV XLPE Indoor/Outdoor
33 cable kit of any make for size 95 to 300mm2. Cable kit No 24 787.00
provided by GETCO.
Providing and fixing of RAYCEM/MSEAL/CABSEAL or
equivalent approved make form GETCO heat shrinkable
34 type 11kV XLPE Outdoor cable Termination Kit suitable for No 5 6456.00
11kV 3CX95Sqmm to 300Sqmm XLPE Power Cable by
using adequate capacity of Al lugs…. If required
Providing & Fixing of Aquaguard Toatal Reviva Water
R.O. Plant including Commissioning & Testing and also
with required peripherals for installation of plant as per site
(1) Dimension: 320 X 275 X 410 mm
35 (2) Weight : 8 KG No 1 7245.00
(3) Water flow : 8 to 12 LPH
(4) Input power : 230V AC
(5) RO membrence : TFC spiral
Contractor has to provide guarantee for the 12 month from
the installation.
Providing and fixing of ISI mark Rubber Matting sheet
Suitable for 11KV Class As per following specification.
Reference IS:15652-2006 with latest amendment.
Suitable for Voltage Class :B
Max Use Voltage : 11KV
AC proof voltage : 22KV
Dielectric strength : 45KV
Leakage current : < 10 micro ampere
Colur RED/BLUE
36 Make : Vardhman or equivelent ( Rubberhouse India) sq.mtr 20 4724.00
Width :1 mtr.
Thickness :2.5 mm.
Surface :Chequred on one side and other side plain.
Contractor has to supply Rubber Matting sheet as per
IS:15652-2006 with latest amendment specification and
shall submit test certificate for routine test as per relevant
Providing & fixing of reputed make ISI mark Fire
Extingusher.with leatest ammendment Dry chemical
powder 09 kg Capacity Note: Contractor shall submit Test
certificate for routine test as per relevant IS.
38 - Do - but CO2 type - 6.5Kg No 2 7411.00
39 - Do - but CO2 type - 22.5Kg No 2 18738.00
40 - Do - but Mechanical foam type - 50Ltr No 1 15248.00
Erection of Control Panel, Relay panel or C/R panel or
RTCC panel including grouting of panel, jointing with
adjoining panels including required fabrication for joining
41 panels & entry of control cables and complete vermin No 6 727.00
proofing. Job includes supply of required bolts, nuts etc.
and shifting of panel from S/S site store to work site.
Erection of 11KV CB panel of any make including grouting,
jointing with adjoining panels & horizontal , vertical levelling
including required fabrication for entry of power cable, Per
control cable and complete vermin proofing, Job includes No
supply of required bolts, nuts etc. and shifting of panel from
S/S site store to work site.
-DO- but for LT panel board GETCO including fixing of all
43 switches bus bars etc. No 1 1018.00
Erection of Battery Charger of any make as per
44 manufacturer's instruction manual including grouting, No 1 1018.00
vermin proofing.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender doccument Jambusar Drug Park.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .