| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance AT PO CONTRACTOR PADA PHULBANI | PHULBANI | KANDHAMAL | ODISHA | 762001 | L1 | Admitted-Finance | ||
| 2 | L2₹2.4 Cr+₹4.3 L (1.82%)Admitted-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | L2 | Admitted-Finance | ||
| 3 | L3₹2.4 Cr+₹6.2 L (2.61%)Admitted-Finance PLOT NO 4215 TALAKABARISAHI GADAKANA PO PS MANCHESWAR DIST KHURDA | MANCHESWAR | KHURDA | ODISHA | L3 | Admitted-Finance | ||
| 4 | L4₹2.5 Cr+₹9.3 L (3.91%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
21 Sept 2026, 5:00 pmClosed
CCE Phulbani (R and B) Circle Phulbani
Office of the CCE Phulbani R and B Circle Phulbani District Kandhamal PIN 762001
Construction of Teaching Block of College Building First Floor (Over Existing Building of GNM School) Buildings
2026_EICCL_140438_1
CCE-R-AND-B-PLB-04 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
240 days
Phulbani
Please Refer Tender Documents
2 documents required · 2 mandatory
₹10,000
₹3.1 L
Yes
29 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
7 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK:
Dismantling brick or stone masonry in lime or cement mortar under 3m.height including stacking the useful materials for reuse and removing the debris within 50m. Lead including all cost, conveyances of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge
First Floor | 136.77 | cum | 1,646.62 | ₹2,25,208.22 |
| 2 | Dismentaling & removing R.C.C columns beams, slab, staircase, landing, lintels, including stacking the useful materials for the reuse and removing the debries within 50 mincluding all cost, conveyances of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge
First Floor | 11.79 | cum | 1,731.8 | ₹20,417.92 |
| 3 | Dismentaling & removing GCI or AC sheet roofing after carefully removing the bolts and nuts including stacking the useful materials for the reuse and removing the debries within 50 mincluding all cost, conveyances of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge
First Floor | 42 | sqm | 106.3 | ₹4,464.6 |
| 4 | Removing old tarfelt from roof cleaning the surface lowering including stacking the useful materials for the reuse and removing the debries within 50 mincluding all cost, conveyances of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge
First Floor | 1,554 | sqm | 103.16 | ₹1,60,310.64 |
| 5 | RCC M-20 using 12 mm. to 20 mm. (0.5 inch to ¾ inch) size (20 mm. not to exceed 25%) hard crusher broken granite stone aggregate of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with all cost, conveyance, royalties, taxes of all materials with all labour,labour cess and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge.
Column
First Floor | 42.77 | cum | 18,874.28 | ₹8,07,252.96 |
| 6 | Second Floor | 8.21 | cum | 21,359.67 | ₹1,75,362.89 |
| 7 | Lintel
First Floor | 20.4 | cum | 16,871.36 | ₹3,44,175.74 |
| 8 | Second Floor | 1.46 | cum | 18,956.15 | ₹27,675.98 |
| 9 | Beam
First Floor | 82.31 | cum | 18,874.28 | ₹15,53,541.99 |
| 10 | Second Floor | 2.43 | cum | 21,359.67 | ₹51,904 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.52 MB
Tendernotice_1.pdf
PDF • 2.30 MB
BOQ_608559.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .