| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹11.1 Laccepted-aoc | accepted-aoc |
Tender Value
₹13.2 L
EMD Value
₹13,177
Closing Date
20 Aug 2026, 3:30 pmClosed
GUNTUR MUNICIPAL CORPORATION
GUNTUR
Providing CC ROAD AT JAYANTHI NAGAR 9TH IN DIV. NO 41 UNDDER AE-01 SECTION
972056
ET NO.32/2026-27 ITEM NO-10
OPEN - NCB
Civil Works
GUNTUR, ANDHRA PRADESH
1 document required · 1 mandatory
₹467
₹13,177
29 Sept 2026
6 Aug 2026
6 Aug 2026
Picking old metalled surface to a depth of 75 mm and spreading metal including watering with an initial lead of 2 Hectometers and rolling with power rollers watering and spreading dust for blindage and power roller rolling including hirecharges of power roller (8 to 10T) barricading and diversion of traffic and wetting the new consolidation for a fortnight for compacted thickness
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to Wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work. (RBR-SBBS-11)
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 (M30 Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, near approaches to bridge / culvert and construction joints, and curing of concrete slabs for 14- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Provision for Seignorage charges
Provision Towards merit 2%
Provision Towards DMF 30%
Provision for NAC @ 0.10%
Provision for GST @ 18%
Provision for TPQA @ 0.739 %
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document.doc
TENDER_DOCUMENT • 0.44 MB
465106.xlsx
TENDER_DOCUMENT • 0.01 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
Notice Inviting Tender item 2.docx
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .