Loading…
Loading…
Tender Value
₹31.4 L
EMD Value
₹75,000
Closing Date
29 Sept 2026, 11:00 am2d left
Superintending Engineer
Office of the Superintending Engineer Electricity Distribution Circle (EDC), UPCL, Champawat 33/11 KV Sub-Station Campus, Tanakpur Champawat, Uttarakhand PIN 262309
Shifting 11 kV line under the jurisdiction of Tanakpur Sub-Division, Electricity Distribution Division, Champawat (Deposit Head)
2026_UPCL3_100131_1
44/2026-27/EDC(CH)
Open Tender
Electrical Works
Piece-work
90 days
Under EDD UPCL Champawat
As per the PQR stipulated in the Tender Document.
3 documents required · 3 mandatory
₹2,360
Yes
EE EDD Champawat
₹75,000
Yes
15 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annexure-A (Supply of following material as per UPCL Norms.) | |||||
| 1.01 | MS Nut & Bolt of Size | 25 | KG | - | - |
| 1.02 | Holding Clamp for Guarding | 4 | NOS | - | - |
| 1.03 | Holding Clamp for SP-55 with N/B | 41 | NOS | - | - |
| 1.04 | Bracing Clamp Top SP-55 with N/B | 22 | NOS | - | - |
| 1.05 | Bracing Clamp Bottom SP-55 with N/B | 22 | NOS | - | - |
| 1.06 | X Arm Clamp for ST Pole SP-55 with N/B | 24 | NOS | - | - |
| 1.07 | Earth Wire Clamp for SP-55 with N/B | 25 | NOS | - | - |
| 1.08 | Stay Clamp for SP-55 with Nut & Bolt | 12 | NOS | - | - |
| 1.09 | 11 KV Cable Ties for Pin Insulator | 75 | NOS | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
FormAandB.pdf
Other Document • 0.67 MB
TENDERdOCUMENT44.pdf
Tender Documents • 1.27 MB
BOQ_118067.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .