Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | L1 | Accepted-AOC Work Awarded to the Lowest rate quoted bidder | |
| 2 | L2₹7.5 L+₹13,928 (1.90%)Rejected-AOC | L2 | Rejected-AOC Highest rate |
Tender Value
₹8.3 L
EMD Value
₹21,000
Closing Date
10 Apr 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Preveen P,Divisional Forest Officer Nemmara
Divisional Forest Office Nemmara Ayinamppadam Palakkad 678508
Cost of providing Hand Rail and Concrete Steps near Karappara Water Falls under Nelliyampathy Forest Station of Nelliyampathy Range during 2024-25 and 2025-26
2025_FD_757270_1
KFDDO/18076/2025-DFONMR/D
Open Tender
Civil Works - Others
Item Wise
180 days
Karappara
Please refer the E-Tender Notification and Condition
9 documents required · 9 mandatory
₹1,700
₹21,000
27 Jun 2025
31 Mar 2025
11 Apr 2025
31 Mar 2025
10 Apr 2025
31 Mar 2025
Amount
1- Hand Rails and CC steps od243460/2024_2025 DOWEL BARS FIXING - fixing dowel bars with drilling holes of size 25mm dia of 0.80m to 0.90 m long to hard rock and filling the gap with cement grout (0.25kg/each) excluding the cost of steel etc complete
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od243461/2024_2025 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, EXCLUDING applying priming coat of approves steel primer and INCLUDING extra molding works like bamboo model<br>G.I. pipes
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.3 Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size)
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.7 Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
13.52.1 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
BABU KALLUKARAN (BID ID -2193912)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .