Tender Value
₹48.2 L
EMD Value
₹49,000
Closing Date
28 May 2026, 4:00 pmClosed
Executive Engineer, N. P. Canal Dn. No.3, Kapadwanj.
Maintenance & Repair of Mahemdabad Branch Canal and Vasna Dapat Direct Distributary and its distributaries & Minors & For Year 2026
307176
6 of 2026-27
Open
Civil - All
Works
Kheda
4 documents required · 4 mandatory
₹1,770
Executive Engineer N.P.C Division No. 3,Kapadwanj
₹49,000
20 May 2026
20 May 2026
20 May 2026
28 May 2026
20 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer N.P.C Division No. 3, Kapadwanj
Item Item of work Rate
Unit Qty. Amount (Rs.)
Jungle clearance of specified category and bushes
for canal/dam work as directed with depositing
material etc complete. (Excluding tree of girth
1 above 0.5 mt.) (A) Upto 2 year old Sqmt 759343.00 1.21
(a) For light dence
Clearing the shrubs like Akadas, weed and other
vegetation including depositing the same out side
and burning etc. complete from canal bed & both
2(A) side slopes and upto outer toe of the bank. Km 175.34 5976.17
(For canal and drains) (A)First Cleaning
(a) Upto 0.56 cumecs
Cutting, Cleaning and Removing the Jungle shrubs
like(Akabas, weeds, and other vegetation) i.e. all
type of trees, vegetation, Item No-2, Clearing the
shrubs like Akadas, weed and other vegetation
including depositing the same out side and burning
2(B) etc. complete from canal bed & both side slopes Km 30.55 8963.75
and upto outer toe of the bank.
(For canal and drains) (A)First Cleaning
(b) Above 0.56 to 7.0 cumecs
Clearing the shrubs like Akadas, weed and other
vegetation including depositing the same out side
and burning etc. complete from canal bed & both
side slopes and upto outer toe of the bank.
2(C) (For canal and drains) (A)First Cleaning Km 13.98 11951.33
(c) Above 7.0 cumecs
Clearing the silt from the canal/drain bed by
digging the same to the required bed level and
gradient including depositing the excavated earth
regularly in spoil bank for utilizing the same
3 (A) preparing the banks after clods as and where Cum 2292.08 149.38
directed for lead upto 30mt & lift upto 3.0m
(Excluding weed cutting)-
(a) For Canals having capacity below 20 cusecs
Clearing the silt from the canal/drain bed by
digging the same to the required bed level and
gradient including depositing the excavated earth
regularly in spoil bank for utilizing the same
preparing the banks after clods as and where
3(B) directed for lead upto 30mt & lift upto 3.0m Cum 1479.54 178.77
(Excluding weed cutting)
(b) For Canals having capacity between 20 to
Earth work/Backfilling with selected earth brought
from out side borrow area or from excavated
4 usefull materials including watering, ramming, Cum 1333.05 142.41
compaction with pnuematic temping and all lead
and lift etc. complete.
Providing and Laying in position Nominal Mix
Plain/Reinforced Cement Concrete Lining of 1:2:4
using cement, sanda and crushed aggrgate in Bed,
Side Slopes and Curvature including batching,
mixing, transporting, placing, vibrating, smooth
finishing, membrane curing (By Curing Compound
Only) as directed with all lead & lift etc. complete
5 including dressing the bed and trimming the canal Sqmt 4521.82 356.33
section and minor filling with murrum / earth as
per site condition to correct profile incl. providing
bitumen joints at specified interval. (Without Using
Paver Machinaries & without sleepers)For
cms thick canal lining in Bed / Slope.
Amount: Rs. Forty Eight Lac Fifteen Thousand Five Hundred Seventy Six & Eighty Eight
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules.i.e.1 % of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix
design the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
Drawings.pdf
Schedule-B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .