Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹3,760
Closing Date
24 Jun 2026, 6:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Public Health Works Division, Palanpur
Pipeline Damage due to flood at Vasan and Dhandha Village of Palanpur RWSS Package-1 Part-C, Ta.Palanpur, Dist.Banaskantha
312699
06 of 2026-27
Open
Civil Works - Water Works
Banaskantha
6 documents required · 6 mandatory
₹600
Executive Engineer, P. H. Works Division, Palanpur
₹3,760
9 Jun 2026
9 Jun 2026
9 Jun 2026
24 Jun 2026
9 Jun 2026
Name of Work: Pipeline Damage due to flood at Vasan and Dhandha Village of Palanpur RWSS Package-
1 Part-C, Ta.Palanpur, Dist.Banaskantha
Sr. No. Description of Materials Qty. to be Rate Unit Place of Delivery
1 200 mm Dia. PVC 42 Free of Cost Rmt
2 160 mm Dia. PVC 36 Free of Cost Rmt
1 The Contractor submitting the tender should see that the rate in Schedule - A (of tender documents) are filled by the
Engineer in charge prior of the time of issue of tender.
2 Any additional materials to be supplied free of cost as per Schedule-A if found necessary at the time of execution will be
supplied to the contractor free of cost.
3 Any materials other than that provided in Schedule-A if required for the labour items of Schedule-B issued on request to the
contractor provided the same are available with department at prevailing market rate or department issue rate whichever is
4 The contractor shall provide his own arrangement at his own cost for loading, unloading and transport to the site of work for
the material stipulated in Schedule-A.
5 Those works will be executed which are found necessary at the time of execution, contractor will not be entitle for any claim
for saving in any items as per site condition.
6 The rate of recovery for short fall or damage of material issued free of cost will be present S.O.R. plus 3% storage charge or
rates of Board R/C Plus 3 % storage whichever is higher.
7 No negotiation at present in from and hence contractor should quote their rates accordingly.
8 The sub contract, if any given by the contractor would not create any right against the Board.
9 The Amount Recoverable from the contractor by the Gujarat water supply and sewerage board on any account shall be
liable to be recovered from the amount payable to the contractor / suppliers.
10 After passing the bill fund shall be demanded to higher authority payment shall be made after getting fund from higher
11 Labour Cess under the prevailing rules of the Government Resolution shall be borne by the bidder. (Present rate is 1%).
12 Royalty on Minerals Consumed in works from End User under the prevailing rules of the Government Resolution Dt.
18/06/2016 shall be borne by the bidder.
13 The contractor has to supply all the equipment / accessories / materials & components as per GWSSB’ approved vendor list
only. Prevailing approved vendor list is uploaded on www.gwssb.org website. However any addition (approved by the
competent authority of Board) in makes / brands of equipment etc. during bidding process, shall automatically apply. In case
of items not explicitly mentioned in vendor list the same shall be supplied as per relevant national / international standard of
reputed makes with prior approval from the Chief Engineer.
Signature of Contractor. Executive Engineer
P.H.Works Division
Name of Work: Pipeline Damage due to flood at Vasan and Dhandha Village of Palanpur RWSS Package-1 Part-C, Ta.Palanpur,
Dist.Banaskantha
Items Qty Unit Rate Per Amount
Description of item
Removing of Existing Pipeline incl. removal of specials, valves jointing material including carting and
1 stacking of removed material from site of work to the department store as directed excl. excavation
650.0 Rmt Dhandha Village 200 mm dia 6 Kg/cm2 PVC Pipe 10.00 Rmt
200.0 Rmt Vasan Village 160 mm dia 6 Kg/cm2 PVC Pipe 6.00 Rmt
Excavation for pipe line trenches incl. all safety provisions using site rails and stacking excavated
stuff up to a lead of 90 mt. cleaning the site etc. complete for lifts and strata as specified.
765.0 Cum In all sorts of soil and soft murrum 89.00 Cum
Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost
3 of conveyance from stores to site of works including cost of labour, materials, except cement
solvent, giving satisfactory hydraulic testing as per ISI code.
650.00 Rmt Dhandha Village 200 mm dia 6 Kg/cm2 PVC Pipe 37.00 Rmt
200.00 Rmt Vasan Village 160 mm dia 6 Kg/cm2 PVC Pipe 28.00 Rmt
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of surplus stuff as
directed within a radius of 3 km.
741.00 Cum 22.00 Cum
Drilling of Horizontal borehole for watermain pipeline under the Canal/road in all strata with requried
length incl fixing of M.S casing pipe of suitable size and thickness. Rate include the cost of drilling of
5 bore hole, casing pipe and welding, pushing etc complete but excluding the cost of water main pipe,
valve and other item. entior work should be as per approved drawing and as per instruction canal/
road authority for following diameter of bore hole of MS pipe.
30.00 Rmt Horizontal Drilling 300 dia & MS casing pipe-250 thick 5 2553.00 Rmt
30.00 Rmt Horizontal Drilling 250 dia & MS casing pipe-200 thick 5 2148.00 Rmt
Providing and casting in situ C.C. in grade M-20 (porportions as per mixdesign or as per table9 of
IS456 2000 in masses by weigh batching) using granite, quartzite trap metal of size 6 mm to 20 mm
6 for RCC work, including scaffolding centering, formwork, needle vibrated consolidation, curing
complete up to 6 meter depth or height (excluding cost of reinforcement and neat finishing) with
centering and shuttering etc. complete for structure other than water retaining.
Providing C.C. M:100 for Encasing Pipes Using Trap Metal Size 12 mm to 50 mm Incl. Formwork
Curing Consolidation ect. Complete for Varius Location on Pipeline
11.42 Cum For C.C Encasing 4113.80 Cum
Rupees Three Lac Seventy Five Thousand Nine Hundred Sixty Six & Paise Fifty Two only
I / We am / are willing to carry out work at _______________ % (Should be written in figures and words) Below/ Above the estimated rate
mentioned above amount of my/our tender work out as under;
Estimated cost put to Estimated cost put to
Tender Rs.______________ Tender Rs.______________
Signature of Contractor. Executive Engineer
P.H.Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00_Title_ P_0.pdf
01B_NIT_.pdf
01C_P_.pdf
02_VOL 1 A Technical Bid_.pdf
03A_VOL 1 B GCC_.pdf
03B_VOL 1 B GCC_.pdf
04A_Memorandum_.pdf
04B_ Volume-III Price bid_.pdf
05_SCH-A and B_.pdf
05A_Schedule of Payment_.pdf
06_Itemwise_Spe_Civil_.pdf
07_General Specifications_.pdf
08_Special Note_.pdf
09_INTEGRITY PACT_.pdf
10_Vendor list_.pdf
11_1.2_Royelty_18.06.19_New rate.pdf
12_04_Ann 4.pdf
13_4_Vigilace Unit-min.pdf
14_05_Ann 5 Purchase Policy.pdf
15_06_Any-6A_Labour Circular.pdf
16_6_Mecilianius-min.pdf
17_07_Ann 6B shramyogi GR.pdf
18_7_GR LD Deduction 10-1-2018.pdf
19_08_GST GR.pdf
20_8_Circular_26_SIGN BOARD.pdf
21_13_GR- PART - 1_01 to 11.pdf
22_14_GR- PART - 2_01 to 8.pdf
23_15_GR- PART - 3_01 to 32.pdf
24_Min wages Circular.pdf
25_DMO_2941_01-Apr-2026_744.pdf
Download all tender documents and submit your bid