Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | ₹22.6 L | L1 | Accepted-AOC Tender Accepted |
| 2 | L2₹22.7 L+₹8,130.55 (0.36%)Rejected-Finance | ₹22.7 L+₹8,130.55 (0.36%) | L2 | Rejected-Finance Other than Lowest Bidder |
| Sl No | Description | Qty | Unit | ABHISAN L1 | SANJEEV COMPUTER GRAPHICS L2 |
|---|---|---|---|---|---|
| 1.00 | Conducting Reconnaissance survey including collection of pavement and Cross Drainage work details of the existing road and the proposed alignment including submission of inception report covering the entire project length complying with standard and as directed by the departmental officer including all incidental charges | 6.6 | Kilo Metre | 4,600 ₹30,360 Lowest | 4,620 ₹30,492 |
| 2.00 | Conducting Topographic survey along project length including all junctions and branching roads by using Total Station for bring all the existing details features includig fixing of GPS pins as instructed by the Engineer incharge including all incidental charges. | 6.6 | Kilo Metre | 26,100 ₹1,72,260 Lowest | 26,110 ₹1,72,326 |
| 3.00 | Conducting survey along project length for assessing longitudinal and cross sectional details of the proposed work as instructed by the Engineer incharge including all incidental charges. | 6.6 | Kilo Metre | 2,900 ₹19,140 | 2,880 ₹19,008 Lowest |
| 4.00 | Fixing Horizontal Alignement and Vertical Alingement including fixing temporary bench marks at 500m interval along the alignment as directed by the departmental officers in charge of the work as per standards including all incidental charges as per IRC standard. | 6.6 | Kilo Metre | 23,400 ₹1,54,440 | 23,100 ₹1,52,460 Lowest |
| 5.00 | Conducting Classified traffic volume count (minimum of 7 days) & Origin - Destination survey (minimum of 3 days) including supply of trained Elumerators, Supervisors etc., with required Qualification, the sight shall have temporary enclosed facility with seating and table arrangements for safely accommodating the counting staff and illumination during night, etc., and as per instruction of the Engineer - in - Charge and including compilation of data for one Location / day as per IRC 9/2022, IRC SP : 19-2020 & IRC : 102 2022 | 5 | Days | 35,000 ₹1,75,000 Lowest | 35,981.96 ₹1,79,909.8 |
| 6.00 | Clearing the light jungles along the alingment portion for conducting survey including all labour & machinary charges for uprooting, and disposal by burning and burrying all etc., complete. | 79,200 | Square Metre | 6.44 ₹5,10,048 Lowest | 6.44 ₹5,10,048 Lowest |
| 7.00 | Preparation of Land Plan Schedule (LPS) including collection of field maps, patta, chitta, owner details, marking centre line of alignment, specification report, abstract of land acquisition area in proper forms and combined FMB and individual FMB for each field along with necessary individual drawings and necessary area calculations, etc., in standard format including value of buildings required under acquisition required to submit to the revenue department for further processing approval and necessary revisions till approval including all incidental charges. | 6.6 | Kilo Metre | 25,000 ₹1,65,000 Lowest | 25,410 ₹1,67,706 |
| 8.00 | Preparation of Detailed and Abstract Estimte including design and drawing for road and cross drainage works including print out in colour and all charges etc., complete. | 1 | Each | 1,15,000 ₹1,15,000 Lowest | 1,15,500 ₹1,15,500 |
| 9.00 | Sub soil exploration by drilling bores for Bridges etc., by conducting boring using power boring machine of (6") 150 mm diameter in all classes of soils except hard strata like kankar, latarite, soft disintegrated rock, soft rock etc., complete for conducting soil penetration test, as directed by departmental officersand collection of soil samples and properly packing the same in plythene covers, including working in heights, water columns including providing coffer dams, scaffolding, transport charges including all incidental charges etc., complete for boring work for Bridges | 150 | RM | 3,840 ₹5,76,000 Lowest | 3,844.59 ₹5,76,688.5 |
| 1000.00Calculation of SubTotal, GST and Total carried out by system automatically | |||||
Tender Value
₹22.7 L
EMD Value
₹21,500
Closing Date
9 Oct 2025, 2:00 pmClosed
The Divisional Engineer H C and M Kumbakonam
O/o the Divisional Engineer (H), C and M Kumbakonam, No.1, Karaikal Road, Kumbakonam-612001
Preparation of Detailed Project Report for collection of data and Preparation of Alignment and Land Plan Schedule for the formation of Bypass to Nachiyarkoil Town.
2025_HWAY_606013_1
TN.17/2025-2026/DO
Open Tender
Consultancy
Item Rate
180 days
Kumbakonam
As per Tender Document
4 documents required · 4 mandatory
₹0
₹21,500
27 Feb 2026
19 Sept 2025
9 Oct 2025
19 Sept 2025
9 Oct 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .