| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 CrAccepted-AOC | ₹28.3 Cr | L1 | Accepted-AOC Awarded being L1 bidder and duly approved. |
| 2 | L2₹29.4 CrRejected-Finance | ₹29.4 Cr | L2 | Rejected-Finance Rejected being not L1 bidder and duly approved. |
| 3 | L3₹37.4 CrRejected-Finance | ₹37.4 Cr | L3 | Rejected-Finance Rejected being not L1 bidder and duly approved. |
| 4 | L4₹37.8 CrRejected-Finance | ₹37.8 Cr | L4 | Rejected-Finance Rejected being not L1 bidder and duly approved. |
| 5 | L5₹45.0 CrRejected-Finance | ₹45.0 Cr | L5 | Rejected-Finance Rejected being not L1 bidder and duly approved. |
| Sl No | Description | Qty | Unit | M/s. V P Jain L3 | Deepak Pandey L4 | SKA SSP(I)PL(JV) L2 | M/s AKM-AC (JV) L1 | Shyam Infra Nirman Private Limited L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Survey, Planning and Dismantling of structures -
Dismantling of all types of existing structures and safe disposal of the demolition debris. Item shall include: obtaining all necessary permissions for the demolition works from the competent Authorities. Demolition works shall always be well planned in advance and shall generally be done in reverse order of the one in which the structure was constructed. The operations shall be got approved from the Engineer-in-Charge before commencement of the work. All care shall be taken to maintain all applicable safety measured as prescribed in IS: 4130. All complete as per detailed design, Scope of Work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 12,00,000 ₹12 L | 10,16,400 ₹10.2 L | 7,80,000 ₹7.8 L | 7,59,360 ₹7.6 L | 8,05,657.08 ₹8.1 L |
| 2.00 | Survey, Planning, Designing, Drawing and Construction of Pathway - 2.0 m. wide
Construction of Pathways including preparation of base layers, stamp concrete finishing layers, both side edging, etc. all complete as per detailed design, Scope of Work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 1,03,70,000 ₹1.0 Cr | 1,02,35,200 ₹1.0 Cr | 79,75,440 ₹79.8 L | 76,46,755 ₹76.5 L | 3,25,64,573.7 ₹3.3 Cr |
| 3.00 | Survey, Planning, Designing, Drawing and Construction of Boardwalk
Construction of Boardwalk including erection of supporting structure, finishing layers of Stamp Concrete/WPC, etc. all complete as per detailed designs, Scope of Work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 4,47,10,000 ₹4.5 Cr | 3,78,69,370 ₹3.8 Cr | 2,90,61,500 ₹2.9 Cr | 2,82,92,488 ₹2.8 Cr | 5,44,20,000 ₹5.4 Cr |
| 4.00 | Survey, Planning, Designing, Drawing and Construction of Parking (4-Wheeler)
Construction of Parking (4-Wheeler) including preparation of base layers, finishing layers i/c paver blocks, edge treatment, etc. all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 10,30,000 ₹10.3 L | 9,46,300 ₹9.5 L | 7,37,352 ₹7.4 L | 7,06,964 ₹7.1 L | 12,87,290.2 ₹12.9 L |
| 5.00 | Survey, Planning, Designing, Drawing and Construction of Parking (2-Wheeler)
Construction of Parking (2-Wheeler) including preparation of base layers, finishing layers i/c paver blocks, edge treatment, etc. all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 13,68,000 ₹13.7 L | 12,72,700 ₹12.7 L | 9,91,742 ₹9.9 L | 9,50,870 ₹9.5 L | 32,76,411.48 ₹32.8 L |
| 6.00 | Survey, Planning, Designing, Drawing and Construction of Green Verges/Riparian Corridors Construction of Green Verges/Riparian Corridors, including preparation of base layers, finishing layers, edge treatment, etc. all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 50,00,000 ₹50 L | 51,93,200 ₹51.9 L | 40,46,625 ₹40.5 L | 38,79,833 ₹38.8 L | 54,41,250 ₹54.4 L |
| 7.00 | Survey, Planning, Designing, Drawing and Construction of Drainage including Stormwater drainage - Construction of drainage/ stormwater drainage in proper slopes all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 83,20,000 ₹83.2 L | 82,36,700 ₹82.4 L | 64,18,170 ₹64.2 L | 61,53,663 ₹61.5 L | 2,21,11,554 ₹2.2 Cr |
| 8.00 | Survey, Planning, Designing, Drawing and Construction of Retaining Wall - Construction of RCC retaining walls/ brick masonary edge walls, Other side of the Riparian Edge: Brick masonary edge walls all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 2,50,00,000 ₹2.5 Cr | 2,63,61,000 ₹2.6 Cr | 2,05,41,015 ₹2.1 Cr | 1,96,94,476 ₹2.0 Cr | 4,92,82,955.67 ₹4.9 Cr |
| 9.00 | Survey, Planning, Designing, Drawing and Construction of Railing / fencing Type - A - With Kerb all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 1,49,76,900 ₹1.5 Cr | 1,64,79,700 ₹1.6 Cr | 1,28,41,290 ₹1.3 Cr | 1,23,12,073 ₹1.2 Cr | 1,37,85,000 ₹1.4 Cr |
| 10.00 | Survey, Planning, Designing, Drawing and Construction of Railing / fencing Type - B - Without Kerb all complete as per detailed designs, Scope of work and as per the instructions of Engineer-in-Charge | 1 | Lumpsum | 68,70,000 ₹68.7 L | 87,35,600 ₹87.4 L | 68,06,992 ₹68.1 L | 65,26,461 ₹65.3 L | 74,07,750 ₹74.1 L |
Tender Value
₹44.7 Cr
EMD Value
₹50 L
Closing Date
16 Aug 2025, 5:00 pmClosed
General Manager (Civil)/HoD, SECL
Office of GM (Civil)/HoD, SECL Bhawan, Seepat Road, Bilaspur, CG, PIN-495006. Contact No.9425596917/ 7880128817 email - gmcivilhod.secl(at)gmail.com and/or gmcivil.secl (at)coalindia.in
Development of Kelo River Front from old Jindal bridge to Kayaghat bridge under CSR activities of SECL, Raigarh Area including Defect Liability Period (DLP) for 5 years on Turnkey basis.
2025_SECL_339896_1
GM(C)/SECL/BSP/e-T_TK/ RGH-KELO/ 2025-26/06 dated 18.07.2025
Turnkey
Civil Works - Others
2557 days
Raigarh Area, CG
As per NIT
7 documents required · 7 mandatory
₹50 L
Office of GM(C)/HoD, SECL
21 Oct 2025
19 Jul 2025
18 Aug 2025
19 Jul 2025
16 Aug 2025
25 Jul 2025
19 Jul 2025 - 9 Aug 2025
22 Jul 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid